PM Report November Week1

This document contains a table with 4 entries listing site names, IDs, planned and actual dates. The sites are GOUZC, HMAMA, ABOHWA, and WHNILE. The planned date for the first 3 sites was 5/11/2014 and the actual date was 6/11/2014. The planned and actual date for WHNILE was 6/11/2014. Below the table are notes about telecommunication equipment needing repairs or replacements and civil works needed for doors.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views3 pages

PM Report November Week1

This document contains a table with 4 entries listing site names, IDs, planned and actual dates. The sites are GOUZC, HMAMA, ABOHWA, and WHNILE. The planned date for the first 3 sites was 5/11/2014 and the actual date was 6/11/2014. The planned and actual date for WHNILE was 6/11/2014. Below the table are notes about telecommunication equipment needing repairs or replacements and civil works needed for doors.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

No Site name Site ID Date Actual Date

1 GOUZC KTM1171 5/11/2014 6/11/2014


2 HMAMA KTM1213 5/11/2014 6/11/2014
3 ABOHWA KTM1731 5/11/2014 6/11/2014
4 WHNILE KTM1137 6/11/2014 6/11/2014
TELECOMMUNCTION Power
No comment need psu -48v dc
No comment
RBS 6201 V2 need DUG dummy
No comment No comment
No comment No comment
Civil & other Comments
No comment No comment
No comment
door need civil work
No comment No comment

Door of shelter need civil work No comment