Example 5.3: A B C D

This document provides an example calculation for the design of a reinforced concrete beam (Beam 1a/A-D). It includes calculations for the effective flange width, loading on the slab and beam, bending moment and shear force diagrams, and sizing of the main reinforcement. The key outputs are an effective flange width of 2140mm, a total design action on the beam of 33.67 kN/m, and a required area of tension steel of 5H20 bars.

Uploaded by

Aisyah Jamal
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
125 views

Example 5.3: A B C D

This document provides an example calculation for the design of a reinforced concrete beam (Beam 1a/A-D). It includes calculations for the effective flange width, loading on the slab and beam, bending moment and shear force diagrams, and sizing of the main reinforcement. The key outputs are an effective flange width of 2140mm, a total design action on the beam of 33.67 kN/m, and a required area of tension steel of 5H20 bars.

Uploaded by

Aisyah Jamal
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

Example 5.

3 page1/11
Ref. Calculation Output
Specification

A B C D
L L L
1

w1 B
1a
w2
B
2

B
2a

B
3

Nominal cover concrete = 30 mm


Span, L = 8.0 m
Width, B = 3.0 m
Slab thickness = 110 mm
Beam size = 225 x 500 mm
Characteristic Actions:
Finishes etc. = 1.5 kN/m
Variable, Qk = 3.0 kN/m
Materials :
3
Unit weight of reinforced concrete = 25 kN/mm (Table A.1 EN 1991-1)
2
Chac. strength of concrete, fck = 25 N/mm (Table F.1 EN 206)
2
Chac. strength of steel, fyk = 500 N/mm
Assumed:
Øbar1 = 20 mm
Øbar2 = 16 mm
Ølink = 6 mm
Design beam 1a/A-D

Beam 1a/A-D

w kN/m w kN/m w kN/m

8.0 m 8.0 m 8.0 m


A B C D

Page 1 of 11
page 2/11
Ref. Calculation Output
5.3.2.1 EFFECTIVE FLANGE WIDTH
beff

bw = 225 mm h
hf = 110 mm
h
h = 500 mm
b1 = 1387.5 mm
b2 = 1387.5 mm
bw

Actual falange width,


b = b1 +b2 +bw
= 3000 mm

Effective flange width,


b eff, = Σ b eff, i + b w ≤ b
b eff, i = 0.2b i + 0.1l o ≤ 0.2l o

Span A-B, C-D 0.2l o = 1360


l0 = 0.85 l = 0.85 x 8000 = 6800 mm
b eff, 1 = 0.2b 1 + 0.1l o = 957.5 mm < 0.2lo b eff, 1 = 957.5
b eff, 2 = 0.2b 2 + 0.1l o = 957.5 mm < 0.2lo b eff, 2 = 957.5
beff, = Σ b eff, i + b w ≤ b = 2140 mm < b beff, = 2140

Span B-C 0.2l o = 1120


l0 = 0.7 l = 0.70 x 8000 = 5600 mm
b eff, 1 = 0.2b 1 + 0.1l o = 837.5 mm < 0.2lo b eff, 1 = 837.5
b eff, 2 = 0.2b 2 + 0.1l o = 837.5 mm < 0.2lo b eff, 2 = 837.5
beff, = Σ b eff, i + b w ≤ b = 1900 mm > b beff, = 1900

LOADING & ANALYSIS


Loads on slab:
Slab selfweight = (0.11 x 25) = 2.75 kN/m2
Finishes etc. = 1.50 kN/m2
2
Characteristic permanent action, Gk = 4.25 kN/m
2
Characteristic variable action, Qk = 3.00 kN/m

Action on beam 1a/A-D:


Distribution of action from slabs to beam are as follows:
Panel 1-1a/A-D:
L y /L x = 2.7 > 2.0 one way slab

Permanent load ;
w0 = (0.50 - 0.11) x 0.225 x 25 = 2.19 kN/m
w1 = nLx/2 = 12.75 / 2.0 = 6.38 kN/m
w2 = nLx/2 = 12.75 / 2.0 = 6.38 kN/m
Gk = 14.94 kN/m

Variable load ;
w1 = nLx/2 = 9.00 / 2.0 = 4.50 kN/m
w2 = nLx/2 = 9.00 / 2.0 = 4.50 kN/m
Qk = 9.00 kN/m

Page 2 of 11
page 3/11
Ref. Calculation Output
Total design acrion on beam1a/A-D, wd
= (1.35 x 14.94) + ( 1.5 x 9.00) = 33.67 kN/m

Continuous beam with equal spans, uniform action and Qk<Gk, use moment and shear
coefficient from Table 3.14 BS 8110

w kN/m w kN/m w kN/m

A B C D

0.01 FL 0.01 FL

Bending Moment
0.09 FL 0.07 FL 0.09 FL

0.45F 0.55F 0.6F


Shear Force

0.6F 0.55F 0.45F

F = w d L kN = 269.4 kN

MAIN REINFORCEMENT
Span A-B & C-D
Effective depth,
d = h - C nom -Ø link - Ø bar1 = 454 mm

Bending Moment,M = 0.09 FL = 193.96 kNm

Mf = 0.567f ck bh f (d-0.5h f )
= 0.567 x 25 x 2140 x 110 x (454 - 55)
= 1331.4 kNm

M < Mf neutral axis in the flange

K = M/fckbd2 6 2
= 194. x 10 / 25 x 2140 x 454
= 0.018

z = d[0.5 + (0.25-K/1.134) ]
= 454.0 [0.5 + (0.25 - 0.018/ 1.134)
= 446.85

Area of tension compression steel

As = M / 0.87fykz
6
= 194. x 10 / 0.87 x 500 x 446.8 Use : 5H 20
2
= 998 mm mm2)
( 1571

Page 3 of 11
page 4/11
Ref. Calculation Output
9.2.1.1 Minimum and maximum reinforcement area,
As, min = 0.26 (fctm / fyk) bd
= 0.26 (2.6 / 500) bd
= 0.0014 bd > 0.0013 bd Use : 0.0014 bd
= 0.0014 225 x 454
2
= 138 mm OK

As, max = 0.04 bh


= 0.04 x 225 x x 500
2
= 4500 mm OK

Support B & C
Effective depth,
d = h - C nom -Ø link - Ø bar1 = 454 mm

Bending Moment,M = 0.01 FL = 237 kNm

K = M/fckbd2
= 237 x 10 6/ 25 x 225 x 454 x 454
= 0.204 > Kbal = 0.167
=>Compression reinforcement is required

z = d [0.5 + (0.25-Kbal /1.134) ]


= 454 [0.5 + (0.25 - 0.167/ 1.134)
= 372.5 mm

d' = C nom + Ølink +Øbar2/2 = 44 mm

x = (d - z) / 0.4 = 203.709 mm

d'/x = 0.22 < 0.38

Area of compression steel


As' = (K - K bal) fckbd2 / 0.87 fyk (d-d' )
= (0.204 - 0.167) 25 x 225 x 454 x 454
0.87 x 500 (454 - 44) Use : 5H 20
2 2
= 244 mm ( 1571 mm )

Area of tension steel


As = [Kbalfckbd2 / 0.87fykz] + As'
= 0.167 x 25 x 225 x 454 x 454 + 244
0.87 500 x 372.5
2
= 1438 mm
Use : 2H 16
2
As, min = 0.0014 bd = 138 mm ( 402 mm2)
2
As, max = 0.04 bh = 4500 mm

Page 4 of 11
page 5/11
Ref. Calculation Output
Span B-C
Effective depth,
d = h - C nom -Ø link - Ø bar1 = 454 mm

Bending Moment,M = 0.07 FL = 151 kNm

Mf = 0.567f ck bh f (d-0.5h f )
= 0.567 x 25 x 1900 x 110 x (454 - 55)
= 1182 kNm

M < Mf neutral axis in the flange

K = M/fckbd2 6 2
= 151. x 10 / 25 x 1900 x 454
= 0.015

z = d[0.5 + (0.25-K/1.134) ]
= 454.0 [0.5 + (0.25 - 0.015/ 1.134)
= 447.74

Area of tension compression steel

As = M / 0.87fykz
6
= 150. x 19 / 0.87 x 500 x 447.7 Use : 3H 20
2 2
= 775 mm ( 943 mm )

As, min = 0.0014 bd = 138 mm2


As, max = 0.04 bh = 4500 mm2

SHEAR REINFORCEMENT
6.2.3 Concrete strut capacity
V RD, max = 0.36b w df ck (1-f ck /250)/(cot Ө + tan Ө)
= 0.36 x 225 x 454 x 25 (1- 25 / 250) 25/250 = 0.1
(cotӨ + tanӨ)

= 287 kN 22 0 cot 22 = 2.5 cot = 1/tan


0
= 414 kN 45 cot 45 = 1.0

Support A & D
V ED = 0.45F = 121 kN

V ED < V RD, max cot Ө = 2.5 , Ө = 22 0


V ED < V RD, max cot Ө = 1.0 , Ө = 45 0
Therefore angle, Ө < 22 0

Shear links
Asw/s = VED / 0.78fyk d cotӨ
= 121 x 10 3 / 0.78 x 500 x 454 x 2.5
= 0.277

Page 5 of 11
page 6/11
Ref. Calculation Output
Try link : H6 Asw = 57 mm2

Spacing, s = 57 / 0.277 = 204 mm < 341 mm


Use :
9.2.2(6) Max. spacing, smax = 0.75d = 341 mm H6 - 200

6.2.3(7) Additional longitudinal reinforcement


Additional tensile force,
∆Ftd = 0.5VED cotӨ
= 0.5 x 121 x x 2.5)
= 150 kN

Additional tension reinforcement,


As = ∆Ftd / 0.87fyk Use :
= 150 x 103 / 0.87 x 500 2H 16
2 2
= 345 mm (402 mm )

Support B & C
V ED = 0.60F = 162 kN

0
V ED < V RD, max cot Ө = 2.5 , Ө = 22
V ED < V RD, max cot Ө = 1.0 , Ө = 45 0
0
Therefore angle, Ө < 22

Shear links
Asw/s = VED / 0.78fyk d cotӨ
3
= 162 x 10 / 0.78 x 500 x 454 x 2.5
= 0.369

Try link : H6 Asw = 57 mm2

Spacing, s = 57 / 0.369 = 153 mm < 341 mm


Use :
9.2.2(6) Max. spacing, smax = 0.75d = 341 mm H6 - 150

6.2.3(7) Additional longitudinal reinforcement


Additional tensile force,
∆Ftd = 0.5VED cotӨ
= 0.5 x 162 x x 2.5)
= 200 kN

Additional tension reinforcement,


As = ∆Ftd / 0.87fyk Use :
3
= 200 x 10 / 0.87 x 500 3H 16
2 2
= 460 mm (603 mm )

Page 6 of 11
page 7/11
Ref. Calculation Output
Support B & C
V ED = 0.55F = 148 kN

V ED < V RD, max cot Ө = 2.5 , Ө = 22 0


V ED < V RD, max cot Ө = 1.0 , Ө = 45 0
Therefore angle, Ө < 22 0

Shear links
Asw/s = VED / 0.78fyk d cotӨ
= 148 x 10 3 / 0.78 x 500 x 454 x 2.5
= 0.338

Try link : H6 Asw = 57 mm2

Spacing, s = 57 / 0.338 = 167 mm < 341 mm


Use :
9.2.2(6) Max. spacing, smax = 0.75d = 341 mm H6 - 150

6.2.3(7) Additional longitudinal reinforcement


Additional tensile force,
∆Ftd = 0.5VED cotӨ
= 0.5 x 148 x x 2.5
= 183 kN

Additional tension reinforcement,


As = ∆Ftd / 0.87fyk Use :
= 183 x 103 / 0.87 x 500 3H 16
2
= 422 mm2 (603 mm )

9.2.2(5) Minimum links


Asw/s = 0.08fck1/2 bw / fyk
= 0.08 x (25) 1/2 x 225 / 500
= 0.180

Try link : H6 Asw = 57 mm2

Spacing, s = 57 / 0.180
= 314 mm < 341 mm Use :
H6 - 300
Shear resistance of minimum links
Vmin = (Asw/s)(0.78 d fyk cotӨ)
= (57 / 300) (0.78 x 454.0 x 500 x 2.5)
= 83 kN

Links arrangement
121 148 162 83

83 162 148 121


x1 x2 x3

Page 7 of 11
page 8/11
Ref. Calculation Output
x1 = (121 - 83) / 33.67 = 1.147 m
x2 = (162 - 83) / 33.67 = 2.347 m
x3 = (148 - 83) / 33.67 = 1.947 m

6.2.4 Tranverse steel in the flange


The longitudinal shear stresses are the greatest over a distance ∆x measured from the zero
moment
∆x = 0.5(0.3L) = 1200 mm *Estimate

The change in moment over distance ∆x from zero moment,


∆M = 0.70Mmax = 0.7 x 193.96 *Estimate
= 136 kNm

The change of longitudinal force,


∆Fd = [∆M/(d-0.5hf)] x [(b-bw)/2b]
= 136 x 103 (2140 - 225)
x
454 - 55 (2 x 2140)
= 152 kN

Longitudinal shear stress,


v Ed = ∆Fd/(hf∆x)
3
= 152 x 10 / (110 X 1200)
= 1.15 N/mm2

6.2.4(6) v Ed > 0.27fctk = 0.27 x 1.8 = 0.486 N/mm2


=> Tranverse steel reinforcement is required

Concrete strut capacity in the flange


v Ed, max = 0.4fck(1-fck/250) / (cot Ө + tan Ө)
= 0.4 x 25 x (1- 25 / 250) 25/250 = 0.1
(cotӨ + tanӨ)

0
v Ed = 3.59 kN 26.5 cot 27 = 2.0 tan 270 = 0.510
0
v Ed = 5.96 kN 45 cot 45 = 1.0

v Ed < v Ed, max cot 26.5


v Ed < v Ed, max cot 45
0
Therefore angle Ө = 26.5

Tranverse shear reinforcement


Asf/sf = v EDhf / 0.87fyk cotӨ
= 1.15 x 110 / 0.87 x 500 x 2.0
= 0.15

Try link : H 10 Asf = 79 mm2

Spacing, sf = 79 / 0.15 = 539 mm

Page 8 of 11
page 9/11
Ref. Calculation Output
9.2.1(1) Minimum tranverse steel area,
As,min = 0.26(fctm/fyk)bhf
= 0.26 x (2.60 / 500) bhf
= 0.00135 bhf Use:
= 0.00135 x 1000 x 110 H10 -500
2
= 149 mm2 (157 mm )
7.4 DEFLECTION
Check at span A-B
Percentage of required tension reinforceent,
ρ = As req / bd
= 998 / x 225 x 454
= 0.010

Reference reinforcement ratio,


= (fck)1/2 x 10-3
1/2
ρo = (25) x 10-3
= 0.005

Percentage of required compression reinforceent,


ρ' = As' req / bd
= 0 / x 225 x 454
= 0.0 Use : 1.0

Table 7.4N Factor for structural system, K = 1.3


ρ > ρo

1/2 1/2
= 1.3 [ 11 + 1.5 (25) 0.005 / ( 0.010 - 0.0 ) (25) = 5.00
1/2
+ (1/12) (25)1/2 (0.000 / 0.005)
= 1.3 [11 + 3.84 + 0.00 ]
= 19.29

Modification factor forflange width, b/b w > 0.3


= 0.8

Modification factor for span greater than 7 m


= 7/8' = 0.88

Modification factor for steel area provided,


= As prov / As req
= 1571 / 998
= 1.57 > 1.5

Therefore allowable span-effective depth ratio,


l/d = 19.29 x 0.80 x 0.88 x 1.57
= 21.26

Actual span-effective depth,


= 8000 / 454
= 17.62 ≤ l/d OK

Page 9 of 11
page 10/11
Ref. Calculation Output
CRACKING

7.3 CRACKING
Table 7.1N Limitting crack width, w max = 0.3 mm
Steel stress,

= (500 / 1.15) x [(14.94 + (0.3 x 9.00))/ 33.67] x 1.0


2
= 228 N/mm

Table 7.3 N Max. allowable bar spacing = 250 mm


Bar spacing,
s = [b - 2c -(No. of bar xØbar)-(2Ølink)]/ (No. of bar -1)
= 225 - 2(30) - 3(20) - 2(6) / 2 s s
= 46.5 < 250 mm OK

Page 10 of 11
Ref.

A
B

1100 4500 2400 2000


DETAILING

H6-200 H6-300 H6-150 H6-150 H6-300


x Y 2H20-3+1H20-4
2H20-3
2H25-4

2H20-2 2H20-5+1H20-6
800 3H20-1 1200 1200
Calculation

x
Y

Page 11 of 11
450

450
225 225
X -X Y -Y
Output
page 11/11