0% found this document useful (0 votes)
248 views5 pages

Project Score Card: PT. Wijaya Karya (Persero) TBK - DSU II Proyek Pembangunan Jalan Akses Jembatan Tayan

The document is a scorecard for a project to modernize irrigation networks from 2016-2018. It lists 15 key performance indicators (KPIs) with targets to measure project results in areas such as product quality, customer satisfaction, finances, human resources, processes, and leadership. The scorecard shows that as of October 2018, performance on all KPIs was at target levels, resulting in a total score of 0% achievement. Measurement frequency and responsibilities are also specified for each KPI.

Uploaded by

Alek
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
248 views5 pages

Project Score Card: PT. Wijaya Karya (Persero) TBK - DSU II Proyek Pembangunan Jalan Akses Jembatan Tayan

The document is a scorecard for a project to modernize irrigation networks from 2016-2018. It lists 15 key performance indicators (KPIs) with targets to measure project results in areas such as product quality, customer satisfaction, finances, human resources, processes, and leadership. The scorecard shows that as of October 2018, performance on all KPIs was at target levels, resulting in a total score of 0% achievement. Measurement frequency and responsibilities are also specified for each KPI.

Uploaded by

Alek
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Lampiran : 6.

PT. Wijaya Karya (persero) Tbk - DSU II


PROYEK PEMBANGUNAN JALAN AKSES JEMBATAN TAYAN

PROJECT SCORE CARD

KEY PERFORMANCE INDICATOR


Parameter Bobot PIC RKP Frekuensi Pengukuran
PROJECT
1. Mutu 10 Kasie Tek/QA 87 % Bulanan
Hasil Produk & Jasa
2. Waktu 10 Kasie Kom 100 % Bulanan
Fokus Pada Pelanggan 3. Customer Engagement / Satisfaction Index 15 MP 3.5 index Tahunan
4. Laba Kotor 10 MP 26,917 M Rp Bulanan
5. Net Cash Flow 5 Kasei KA 40 % Triwulanan
Hasil Keuangan & Pasar
6. Ratio Tagihan Bruto 5 Kasei KA 18 % Triwulanan
7. Penjualan (Sales) 5 MP 268,903 M Rp Bulanan

Hasil Fokus Pada Sumberdaya 8. HC Availability 5 Kasei KA 100 % Triwulanan


Manusia

9. SHE Compliance Level 5 Kasie Tek/QA 80 % Bulanan


10. Efektivitas Knowledge Management 5 Kasie Tek/QA 80 % Semesteran
Hasil Efektivitas Proses
11. Efesiensi pengadaan 5 Kasie Kom/dan 1.2 % Triwulanan
12. Vendor Performance 5 Kasie Kom/dan 90 % Bulanan
13. Risk Management 5 MP 3 index Tahunan
Hasil Kepemimpinan 14. Code Conduct 5 MP 75 % Tahunan
15. Efektivitas Community Realation 5 MP 75 % Tahunan/ proyek selesai
Total 100
Lampiran : 6.3

SCORE CARD PAKET PEKERJAAN MODERNISASI JARINGAN IRIGASI DI.RENTANG (SI.GEGESIK


PERIODE : 2016 - 2018

BOBOT TARGET S/D Oktober 2018 % SCORE


NO KEY PERFORMANCE INDICATOR SAT NILAI
S/D oKTOBER 2018 RI/RA
KPI RA RI RA RI

1 HASIL PRODUK DAN JASA

Mutu (Produk, waktu) % 7.5 87.0 87.0 - 0.0% 0 60 0

Waktu % 7.5 100.0 100.0 - 0.0% 0 60 0

2 HASIL FOKUS PADA PELANGGAN

Customer Satisfaction Index Idx 15.0 3.5 3.5 - 0.0% 0 120 0

3 HASIL KEUANGAN & PASAR

Laba Kotor Rp (Jt) 10.0 23,468.7 1.0 - 0.0% 0 80 0

Net Cash Flow Operasi % 5.0 4.0 1.0 - 0.0% 0 40 0

Ratio Tagihan Bruto % 5.0 18.0 18.0 - 0.0% 0 40 0

Penjualan Rp (Jt) 5.0 179,412.3 1.0 - 0.0% 0 40 0

4 HASIL FOKUS PADA SUMBER DAYA

HC Availability % 5.0 100.0 100.0 - 0.0% 0 40 0

5 HASIL EFEKTIVITAS PROSES

SHE Compliance Level % 5.0 80.0 80.0 - 0.0% 0 40 0

Efektifitas KM % 5.0 80.0 80.0 - 0.0% 0 40 0

Efisiensi Pengadaan % 5.0 1.2 1.2 - 0.0% 0 40 0

Collection Period hari 5.0 55.0 55.0 - 0.0% 0 40 0

Vendor Performance % 5.0 90.0 90.0 - 0.0% 0 40 0


6 HASIL KEPEMIMPINAN

Risk Management Rp (Jt) 5.0 2,795.6 1.0 - 0.0% 0 40 0

Code of Conduct Level % 5.0 80.0 80.0 - 0.0% 0 40 0

Efektifitas Community Relation Rp (Jt) 5.0 sesuai Ra Proyek 1.0 - 0.0% 0 40 0

TOTAL 100 800 0.00


INGAN IRIGASI DI.RENTANG (SI.GEGESIK)
6 - 2018

UPJ LEVEL Pengukuran

Kasie QA Bulanan

Kasie Kom Bulanan

Kasie QA 20-40%/90-100%

Kasie Kom Bulanan

Kasie KA Triwulanan

Kasie KA Triwulanan

Kasie Kom Bulanan

Kasie KA Triwulanan

Kasie QA Bulanan
Kasie
Semesteran
Teknik
Kasie Dan Triwulanan

Kasie KA Bulanan

Kasie Dan Bulanan


Kasie Kom Bulanan

SPI Tahunan

Kasie KA Bulanan

You might also like