Codes, Tags and Labels-Interpreting Piping and Instrumentation Diagrams - AIChE

The document discusses piping and instrumentation diagram (PID) tagging systems. It describes some common initial tagging systems used by companies that become confusing over time as more equipment is added. It then proposes a structured numeric-only tagging system that incorporates area numbers, equipment types, and sequence numbers to uniquely identify each piece of equipment. This system aims to simplify tagging and make documentation and maintenance easier over the long run. Sample equipment tags are provided to illustrate how the system works.

Uploaded by

archana2512
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
256 views8 pages

Codes, Tags and Labels-Interpreting Piping and Instrumentation Diagrams - AIChE

The document discusses piping and instrumentation diagram (PID) tagging systems. It describes some common initial tagging systems used by companies that become confusing over time as more equipment is added. It then proposes a structured numeric-only tagging system that incorporates area numbers, equipment types, and sequence numbers to uniquely identify each piece of equipment. This system aims to simplify tagging and make documentation and maintenance easier over the long run. Sample equipment tags are provided to illustrate how the system works.

Uploaded by

archana2512
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

4/28/2017 Codes, Tags and Labels—Interpreting Piping and Instrumentation Diagrams | AIChE

lo, improved memor and mucle tone while eliminating irritale owl, gatric reflux and
attention deficit. The proce folk tart out tagging equipment a follow:

Pump are impl tagged P-1, P-2, P-3 (make ene right?)
Agitator are tagged AG-1, AG-2, AG-3, etc. Dude - thi i o imple!
And of coure tank and veel are tagged TK-1, TK-2, TK-3 (or V-1, V-2, V-3). Could do
thi in m leep...

And o on...Life i good. Later on, though le common equipment tart getting added, and
thi tart to tre the "intuitive" nature of the tem. For example, a centrifuge i initiall
tagged C-1 ut now the need to add a conveor ut C i taken o the decide to call the
conveor CO-1. Now the think, well, we will jut revie the centrifuge tag to C-1. Crii
avoided...ut wait, later the need to add a chemical feed package and want to tag that CF-1.
OK, that' cool ut then a unch of cro flow filter module i added the decide to "teal"
the CF lael for thoe and change the chemical feed to C, no wait...can't do that, C i taken
 the centrifuge. o the ite the proverial ullet and call the chemical feed kid C-1
where  i "intuitive" for uppl. Right? Tr again quiz kid. Nood i going to ee that a
intuitive. And then one da, it hit GitRDun' proce engineer that their initiall conceived
o-called intuitive tagging tem i a heap of roken confuion and nood know their C'
from their CO'. Cue the Jackon 5 ong A  C, imple a 1 2 3!

A etter Tag Numering tem
To avert the prolem inherent in the aove example, man proce indutrie utilize a
numeric-onl tem for tagging equipment. Thi help implif the logical categorization of
equipment during the proce deign phae. Moreover, a tructured tag tem i more
intuitive for the development of deign documentation, operating procedure and training,
and general documentation upkeep/maintenance. With that in mind (and conidering the
point preented earlier in thi Part), the following method i ut one example of how to tag
proce equipment uing an extenile tem.

Area Numer, AN Mot izale proce plant are compried of multiple area. An area i a
phical, geographical, or logical grouping determined  the ite. It ma contain proce
cell, unit, equipment module, and control module (more detail can e found at ia.org).
To facilitate a hierarchical organization of equipment, equipment tag hould then
https://www.aiche.org/chenected/2010/10/codes-tags-and-labels-interpreting-piping-and-instrumentation-diagrams 5/23
4/28/2017 Codes, Tags and Labels—Interpreting Piping and Instrumentation Diagrams | AIChE

incorporate area deignation.

A mall or imple project ma have onl one area. Converel, larger more complex project
ma have multiple area. The aignment of area i at the dicretion of the proce engineer
and can e ujective. The onl general rule that I like to emplo i that common equipment
that erve multiple area, e.g., utilit and infratructure tem e placed into a "Common
Reource" area rather than e made a part of an other proce area. Once area have een
deignated for a particular project tpe, engineer hould trive to maintain common area
deignation on future, imilar project. For example, the area hown in the figure aove
ma e defined on the lead heet for a fictitiou project.

quipment Tpe, T
quipment can e identified aed on it tpe uing a numeric tem uch a the imple one
hown elow. In cae where equipment ha multiple function, uer dicretion i advied in
electing the mot uitale tpe code.

equence Numer, Q
Thi i the conecutive numering of like equipment in a particular area. The equence
egin with 01. All equipment i to a have it own equence numer. The ue of alphaetic or
other tag uffixe i to e avoided.

https://www.aiche.org/chenected/2010/10/codes-tags-and-labels-interpreting-piping-and-instrumentation-diagrams 6/23
4/28/2017 Codes, Tags and Labels—Interpreting Piping and Instrumentation Diagrams | AIChE

xample quipment Tag
Uing the tem outlined aove, a four-digit tem emerge that ma not e intantl
recognizale in term of what the pecific equipment i (or where), ut it will eventuall
ecome ver familiar to thoe who are intimate with the plant. A few example uing the
area numer defined aove are provided elow:

1101 - The firt pump in the tank farm area.
1701 - The firt tank in the tank farm area.
1405 - The fifth mixer in the tank farm area.
2901 - A vendor package in the Train 1 area.

The equipment tag numer hould e prominentl diplaed near the mol ued for the
equipment. For example, the tag numer for a centrifuge might appear a follow on a P&ID.

Latl, all major equipment hould e named and provided general pecification in a lael
placed along the drawing order. A couple example for a pump and tank follow.

https://www.aiche.org/chenected/2010/10/codes-tags-and-labels-interpreting-piping-and-instrumentation-diagrams 7/23
4/28/2017 Codes, Tags and Labels—Interpreting Piping and Instrumentation Diagrams | AIChE

It i up to our compan to decide on the final formatting, location (ome companie like to
put certain equipment lael near the top of the order), and which particular pecification
hould e included along with each major equipment lael. The tem preented here i
fairl imple and roadl applicale. Irrepective of thee detail, I highl recommend that
ever piece of major equipment receive a lael with a imilar level of detail.

Intrument Loop Numer
A enefit of uing four digit equipment numering tem uch a the one preented aove
i that the tag lend themelve toward application in defining aociated intrument loop.
Thi make grouping equipment and aociated intrumentation device more logical. Think
ack to our friend at GitRDun Proce, Inc. Their tagging tem conited of tag like P-1,
AG-1, C-2, etc. Thee tag are not amenale for ue in defining intrument loop. However, a
four digit tem doe neatl tuck into intrument ule and when ou think aout it,
mot intrument and device erve or are primaril aociated with a piece of equipment.
And even when that i not the cae, the can readil orrow from the equipment tpe code
"9" in cae where, for intance, a preure gauge on an air header erving the entire area
mut e defined. Conidering the aove point, the following intrument and device tagging
tem i ut one effective wa to tag intrument and device:

https://www.aiche.org/chenected/2010/10/codes-tags-and-labels-interpreting-piping-and-instrumentation-diagrams 8/23
4/28/2017 Codes, Tags and Labels—Interpreting Piping and Instrumentation Diagrams | AIChE

Where;

PX - device tpe prefix (a per IA 5.1)
Q - the aociated equipment tag (a defined aove)
X - duplicate or redundant device uffix (ee detail elow)

Duplicate uffix, X Rule
A uffix i provided to accommodate intance were man device of the ame tpe are
aociated with a given piece of equipment. For example, a veel ma have man line
connected to it, each having it own actuated valve. To reolve thee intance o that each
device ha it own unique loop numer, there are two uffix tag method that can e
emploed,

1.  If a piece of equipment ha redundant device aociated with it, an alphaetic uffix ma
e appended to the loop numer, e.g., FV1101A, FV1101, FV1101C, etc. (Note: Redundant
mean erving the ame purpoe a another device in a ackup fahion.)
2.  If a piece of equipment ha multiple item of the ame tpe, each of which with different
function (not redundant) then a numeric tem hould e emploed, e.g., FV1101-1,
FV1101-2, etc.

xample Loop Tag
aed on the aove dicuion, ome example loop tag are provided elow. If needed, the
reader can viit a more though dicuion in Part 3 regarding intrument areviation.
(Note: In the example provided, I ue the example Area Numer preented a example

https://www.aiche.org/chenected/2010/10/codes-tags-and-labels-interpreting-piping-and-instrumentation-diagrams 9/23
4/28/2017 Codes, Tags and Labels—Interpreting Piping and Instrumentation Diagrams | AIChE

aove.)

PI1101 - A preure indicator on the dicharge of the firt pump in the tank farm area.
LT1701 - A level tranmitter on the firt tank in the tank farm area.
IT1405 - A current tranmitter (for the motor) on the fifth agitator in the tank farm area.
A1701A - One of at leat two redundant analzer on the firt tank in the tank farm.
Hence, one would expect to ee A1701, A1701C... a indicated.
XV1701-1 - An actuated valve on the firt tank in the tank farm area. The uffix -1 implie
there are other valve aociated with tank 1701 ut in an alternate ervice (i.e., not
redundant). For example, XV1701-1 ma e on the inlet to the tank, while XV1701-2 ma
e on the outlet.

Line Numer
imilar to equipment and intrumentation, ever pipe on a P&ID require a unique tag
numer o that it can e uniquel identified during deign, or referenced in operating
procedure. ince mot line are alo affiliated with a major piece of equipment to which
the connect, I like to emplo a numering tem imilar to that ued for intrument loop
where the equipment tag i integrated into the line tag in the following manner (Note:
D002 provide an alternate method that emplo drawing numer intead of equipment
numer ut I generall prefer the method given elow.)

X"--VC--T:Q--L

Where;

X" - the nominal ize of the pipe
VC - the ervice code for the material that normall flow in the line (ee example
elow for lit)
T:VC - a unique line tag that include two part, the equipment tag from which the
line originate followed  a unique equential numer
L -line pecification for the pipe, including cla and material tpe, valve etc.

ervice Code, VC
ervice code are areviation for the fluid the line primaril handle.

https://www.aiche.org/chenected/2010/10/codes-tags-and-labels-interpreting-piping-and-instrumentation-diagrams 10/23
4/28/2017 Codes, Tags and Labels—Interpreting Piping and Instrumentation Diagrams | AIChE

ince ome line can erve man different proce fluid, the fluid ued to pecif the
material for the line hould go here. The lit hould e availale on a lead heet in a manner
imilar to that provided in the example aove.

Line pecification, L
Line pecification cover all the detail related to the piping tem ued to handle the fluid
for the line. Thi hould include all detail regarding material of contruction, valve and
trim, gaket, fitting, T/P limit, and much more. Thi i eond the cope of thi erie ut
i uch a critical component of plant deign that I might expand on thi in a future pot.

Hand Valve
Hand valve require a conitent and clear tagging tem for reference in operating
procedure. There are a numer of technique that can e ued, ut one that I generall
prefer i a follow.

https://www.aiche.org/chenected/2010/10/codes-tags-and-labels-interpreting-piping-and-instrumentation-diagrams 11/23
4/28/2017 Codes, Tags and Labels—Interpreting Piping and Instrumentation Diagrams | AIChE

In the example provided at left, one can dicern valve ize, pec and tag numer. Thi might
e more information than ou want to include on ome P&ID. In cae where ou jut want
to how the valve tag and allow the pec and ize to e derived implicitl from the line tag,
the following method i one option:

"V" - D# - Q

Where;

HV or V - A literal and required part of all hand valve tag
D# - lat two digit of P&ID drawing numer
Q - equence Numer (01 to 99)
V0001 - The firt hand valve on P&ID D100
V1205 - The fifth hand valve on P&ID D102

xample Hand Valve Tag
V0001 - The firt hand valve on P&ID D100
V1205 - The fifth hand valve on P&ID D102

Wrap-Up
Further to the content in thi part, D002 include a few more example of common tag and
code applied in P&ID, uch a inulation, interconnecting arrow, etc. Thee are important
part ut are prett elf-evident. Aide from that, mot companie have ver pecific wa
and mean on thee item o I won't cover them in depth here. Well, I tarted thi out 
aing it wa going to e fun and imple and I hope ou leave thi erie feeling like I made
ome olid point that will e of value to ou going forward. In a follow-up to thi erie, I
will put together a complementar video where I take a few tpical P&ID (like the one I've
attached here) and dicu all of thee apect in what I hope to e a much more engaging
manner. You will then e ale to get a much etter feel for eeing and hearing thi
information. Now venture forth with our new knowledge and appl it for good. ta afe
and have fun.