BOQ - House - Rev A
BOQ - House - Rev A
BOQ - House - Rev A
QUOTATION
Amount
Description Unit Quantity Unit Rate
(US$)
Summary
1 Structure m2 $ -
2 Architecture m 2
###
3 Suppliment work m2 $ 3,225
I Structural work
# Pilling
# Excavation + Footing - 1.5m x 1.5m x 0. set 135 $ -
# Stump column - 0.3m x 0.3m x 1m ht 28 $ -
# Solid brick 20cm under GB set 25 $ -
# Ground Beam 0.20 x 0.4 ht m 28 $ -
# Backfill - sand 0.6m thk m3 6.5 $ -
# 4x6 Stone 0.2m thk m3 7.5 $ -
# Lean concrete 0.05m thk m3 55 $ -
# Ground column 0.3m x 0.3m x 3m m 28 $ -
# Lintel of door and window m 12 $ -
# Hang over window m2 18 $ -
# Upper beam m 32 $ -
# Slab - 10cm + beam 0.25m x 0.4m ht + m2 85 $ -
# Steel Roof + Roof tile m2 42 $ -
# Stair + tile set 1320 $ -
# Stair + tile
Total structural work : $ -
II Achitectural work
# Brick 20cm + plastering m2 336 28 $ 9,408
# Painting inside - Campaint m2 336 6 $ 2,016
# Painting outside - Campaint m2 336 6 $ 2,016
# Floor tile m2 66 12 $ 792
# Wall tile m2 93 12 $ 1,116
# Marble table - mini bar set 1 350 $ 350
# Counter set 1 200 $ 200
# Ceiling m2 45 15 $ 675
# Hang over infront of house set 1 450 $ 450
# Hang over infront of house
Total architectural work : $ 17,023
III Suppliment work
# Septic Ls 1 600 $ 600
# Plumbing work Ls 1 350 $ 350
# Toilet + accesaries Ls 2 950 $ 1,900
# Garage slab m2 15 25 $ 375
Total : $ 3,225
បសកកគគគ កតកកកលកគគគ
កយដដ ចកកជជជងតង
ចកកសរសរជតត
ជររបឥដដតនក 20 ជកកមធធធមបត
ធធធមបត
ចកកខខចកបតជកកម
ថថ កតក សសស
ដ បតជកកម
VIBOL's VILLA
I SITE PREPARATION
A- Back Fill
1- Soil backfill m3 28.88 8.50 1.50
2- 4x6 Stone m3 11.55 8.50 1.50
3- M30 m3 17.33 8.50 1.50
4- River sand m3 17.33 4.50 1.50
5- Implantation m2 57.76 0.00 2.00
II FOUNDATION WORK
A- Footing work
1- Concrete for footing m3 5.4 65.00 80.00
2- Rebars for footing kg 648 0.60 0.00
3- Formwork for footing m2 57.6 8.00 0.00
3- Excavation for footing pcs 8 30.00
B- Lintel work
1- Concrete for L-1 m3 1 65 80
2- Rebars for L-1 kg 120 0.6 0
3- Formwork for L-1 m2 10 8 0
IV Mezzanine work
A- Mezzanine beam work
1- Concrete for MB m3 1.56 65 80
2- Rebars for MB kg 280.8 0.6 0
3- Formwork for MB m2 28.6 8 0
V ROOF WORK
1- Roof m2 100 30
15.2
15.2
4.5
2.9
37.8
Amount Formwork Input Costing
(US$) Ply-wood 1.2x2.4 22 19
Pipe 49x1.5mmx6m 10 7
28
$ 289
$ 116
$ 173
$ 104
$ 116
$ 797
$ 783
$ 389
$ 461
$ 240
$ 109
$ 68
$ 410
$ 331
$ 246
$ 334
$ 245
$ -
$ 123
$ 3,737
$ 278
$ 173
$ 384
$ 145
$ 72
$ 80
$ 331
$ 246
$ 334
$ -
$ -
$ -
$ 2,043
$ 226
$ 168
$ 229
$ 177
$ 164
$ 874
$ 1,838
$ 3,000
$ 11,416
Rate
ID Description Unit Qty
Mater.
2.00 $ 1,151
3.50 $ 7,158
2.00 $ 3,433
3.00 $ 1,320
2.00 $ 5,918
4.00 $ 1,764
$ 20,744
0.00 $ 1,500
0.00 $ 5,000
$ 6,500
2.00 $ 100
10.00 $ 450
0.00 $ 280
$ 830
2.00 $ 1,151
3.50 $ 7,158
2.00 $ 3,433
3.00 $ 1,320
2.00 $ 5,918
4.00 $ 3,129
$ 22,109
0.00 $ 1,500
0.00 $ 5,000
0.00 $ 891
$ 7,391
2.00 $ 100
10.00 $ 450
0.00 $ 280
$ 830
2.00 $ 1,151
3.50 $ 7,158
2.00 $ 3,433
3.00 $ 1,320
2.00 $ 5,918
4.00 $ 3,129
$ 22,109
0.00 $ 1,500
0.00 $ 5,000
0.00 $ 891
$ 7,391
2.00 $ 100
10.00 $ 450
0.00 $ 280
$ 830
3.50 $ 1,342
2.00 $ 449
2.00 $ 749
5.00 $ 4,784
1.50 $ 1,840
0.00 $ 1,836
0.00 $ 250
$ 11,250
2.00 $ 133
2.00 $ 119
2.00 $ 166
5.00 $ 78
5.00 $ 242
0.00 $ 50
0.00 $ 80
0.00 $ 15
0.00 $ 8
0.00 $ 80
0.00 $ 10
0.00 $ 200
0.00 $ 80
$ 1,260
$ 37,798
$ 137,781
BILL OF QUANTITIES Bill No. 1
PROJECT : RESIDENTIAL HOUSE CONCRETE AND CIVIL WORKS
Rate Amount
Item Description Quantity Unit
(USD) (USD)
I. Earth works
4 Soil backfilling for pile caps, ground beam, and leveling to ground floor level 203.70 m3 8.00 $ 1,629.60
The Contractor's rates for piling shall including all plant, machinery, piling rigs,
moving of piling frame into position and around the site, temporary access,
mobilisation, setting out, surveys, checking excentricity, wastage, jointing
piles and removing debris.
14 Concrete for RC ground beams, grade 25MPa cylinder 13.44 m3 125.00 $ 1,680.00
15 Concrete for RC ground slabs, grade 25MPa cylinder 29.30 m3 125.00 $ 3,663.06
16 Concrete for RC columns, grade 25Mpa cylinder 7.03 m3 125.00 $ 878.85
17 Concrete for RC Stair, grade 25Mpa cylinder 3.68 m4 125.00 $ 459.38
Rate Amount
Item Description Quantity Unit
(USD) (USD)
$ 163.35
1st Floor Works
Rate Amount
Item Description Quantity Unit
(USD) (USD)
55 Concrete for RC beams, grade 25Mpa cylinder 0.84 m3 125.00 $ 105.00
56 Concrete for RC slabs, grade 25Mpa cylinder 2.94 m3 125.00 $ 367.50
57 Concrete for RC columns, grade 25Mpa cylinder 0.50 m3 125.00 $ 63.00
Other works