0% found this document useful (0 votes)
34 views2 pages

MITE-019: Indent For Purchase of Item

The document is an indent for the purchase of items from the Department of Civil Engineering at MITE college. It requests 75 drawing boards and 75 drawing board stands and provides terms and conditions including that the source of equipment must guarantee quality and accuracy, the total includes 14.5% sales tax, and delivery must be made within one month of receiving the order. Payment will be made upon successful delivery to the MITE college campus.

Uploaded by

Darshan M M
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views2 pages

MITE-019: Indent For Purchase of Item

The document is an indent for the purchase of items from the Department of Civil Engineering at MITE college. It requests 75 drawing boards and 75 drawing board stands and provides terms and conditions including that the source of equipment must guarantee quality and accuracy, the total includes 14.5% sales tax, and delivery must be made within one month of receiving the order. Payment will be made upon successful delivery to the MITE college campus.

Uploaded by

Darshan M M
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

MITE-019

INDENT FOR PURCHASE OF ITEM

From,

HOD

Department of Civil

To.

The Principa

Sir,

The items mentioned in the appended list are required for the office/Department of Civil Engineering.

Sl. No. of Units


Descriptions with Specifications
No Required

01 Drawing Board 75

02 Drawing Board stand 75

Terms & Conditions:

Source of equipment: Quality, Accuracy & workmanship should be guaranteed.


Sales Tax: The grand total is inclusive of 14.5% sales tax & delivery at MITE college
campus.
Payment: Against successful delivery at College campus.
Delivery period: One month from the date of receiving this order.

Date: 16.04.2015 Your’s faithfully


MITE-019

You might also like