The document discusses ASME "U" Stamp expansion joints and the requirements for applying the ASME U Code Symbol. The process involves designing the expansion joint according to ASME Section VIII rules, purchasing approved materials, verifying welding procedures and welder certification, inspecting fabrication and testing, and applying the nameplate with the U Code Symbol which signifies the joint was built to ASME Code standards.
The document discusses ASME "U" Stamp expansion joints and the requirements for applying the ASME U Code Symbol. The process involves designing the expansion joint according to ASME Section VIII rules, purchasing approved materials, verifying welding procedures and welder certification, inspecting fabrication and testing, and applying the nameplate with the U Code Symbol which signifies the joint was built to ASME Code standards.
The document discusses ASME "U" Stamp expansion joints and the requirements for applying the ASME U Code Symbol. The process involves designing the expansion joint according to ASME Section VIII rules, purchasing approved materials, verifying welding procedures and welder certification, inspecting fabrication and testing, and applying the nameplate with the U Code Symbol which signifies the joint was built to ASME Code standards.
The document discusses ASME "U" Stamp expansion joints and the requirements for applying the ASME U Code Symbol. The process involves designing the expansion joint according to ASME Section VIII rules, purchasing approved materials, verifying welding procedures and welder certification, inspecting fabrication and testing, and applying the nameplate with the U Code Symbol which signifies the joint was built to ASME Code standards.
designing and supplying Requirements expansion joints in accordance with ASME Section VIII, Div 1 The requirements of applying a U Code Symbol to an Expansion Joint encompass the whole process from Appendix 26 providing ASME design to purchasing to production and testing. Code Stamp and U-2 Partial Starting right with the design, there are rules to be Data Reports. followed. Parameters such as wall thicknesses, materials, welding details, and extent of non-destructive The ASME International Boiler examination are determined by design conditions and Pressure Vessel Code such as pressure, temperature, and corrosion allowance, fluid running through the Expansion Joint, and any establish rules governing the specific requests from the customer. Based on these design, fabrication, and conditions a comprehensive set of calculations are prepared. They are reviewed and approved by the inspection of boilers and ASME Inspector. pressure vessels, and nuclear power plant components Once the design has been approved, the materials can be purchased and must comply with the Boiler during construction. The ASME and Pressure Vessel Code. All material must be clearly Boilerand Pressure Vessel Code identified to trace it to the applicable Material Test Report. The ASME Inspector will check the material is in a class of its own and it is and review the Material Test Reports to ensure their internationally renowned. conformity to the Code. Before production can begin, the Inspector will verify that the weld procedure to be used has been qualified and the welders performing the welding are certified. This is in accordance with Section IX. The next step is to review the unit after fabrication is complete to ensure welding was performed to Code require- ments and all non-destructive testing results.
The Authorized Inspector will witness the hydrostatic
test performed in accordance with the requirements of Section VIII Division 1.
The final step is the application of the nameplate. This
is also witnessed by the Inspector. The nameplate will be marked with relevant design conditions and the U Code Symbol.
Any Expansion Joint stamped with this symbol has
been built strictly in accordance with the provisions of the ASME Boiler and Pressure Vessel Code.
BS en 50504 Validation of Arc Welding Equipment Specifies Validation Methods For Arc Welding Equipment Constructed and Used To The Accuracy Specified in