0% found this document useful (0 votes)
54 views3 pages

2/7/18 James The Giant Peach Tech Schedule v1

This tech schedule outlines the timeline for installing and preparing the scenic elements, lighting, and sound for the production of James the Giant Peach from March 19th through April 8th. It includes dates for load in and focusing of scenery and lighting, a sitzprobe, spacing and technical rehearsals culminating in previews and opening night. The goal for the final technical rehearsal is to complete cue-to-cue through the middle of Act 2 in preparation for previews.

Uploaded by

Rachel Piper
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views3 pages

2/7/18 James The Giant Peach Tech Schedule v1

This tech schedule outlines the timeline for installing and preparing the scenic elements, lighting, and sound for the production of James the Giant Peach from March 19th through April 8th. It includes dates for load in and focusing of scenery and lighting, a sitzprobe, spacing and technical rehearsals culminating in previews and opening night. The goal for the final technical rehearsal is to complete cue-to-cue through the middle of Act 2 in preparation for previews.

Uploaded by

Rachel Piper
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

2/7/18 James the Giant Peach Tech Schedule v1

Monday Tuesday Wednesday Thursday Friday Saturday Sun


Mar 19 Mar 20 Mar 21 Mar 22 Mar 23 Mar 24 Mar 25
8:00

9:00 Scenic Strike Scenic Load In Scenic Load In Scenic Load In Scenic Load In Scenic Load In Scenic Load In
LX Strike
10:00

11:00

12:00

1:00

2:00 Designer Run

3:00

4:00

5:00

6:00 Production Meeting


Ochestra Rehearsal
7:00 in pit

8:00

9:00

10:00

11:00

12:00

S N
T O
A T
G E
E S

S N
H O
O T
W E
S

O N
T O
H T
E E
R S
2/7/18 James the Giant Peach Tech Schedule v1

Monday Tuesday Wednesday Thursday Friday Saturday Sun


Mar 26 Mar 27 Mar 28 Mar 29 Mar 30 Mar 31 Apr 1
8:00

9:00 Scenic Load In Scenic Load In Scenic Load In FOCUS Painting Touchup TECH TECH

10:00 Stage dark and quiet LX Programming

11:00

12:00

1:00 LUNCH LUNCH

2:00 TECH - Cue to Cue TECH - Cue to Cue

3:00

4:00

5:00 DINNER
DINNER
6:00 Scenic build complete ALL CALL. Warm up/Fight call
Sitzprobe Spacing Rehearsal TECH - Cue to Cue FULL RUN
7:00

8:00

9:00 Production Meeting Production Meeting

10:00

11:00

12:00

S N
T O END OF DAY GOAL:
A T
G E Complete Cue to Cue through
E S Middle of ACT 2

S N
H O
O T
W E
S

O N
T O
H T
E E
R S
2/7/18 James the Giant Peach Tech Schedule v1

Monday Tuesday Wednesday Thursday Friday Saturday Sun


Apr 2 Apr 3 Apr 4 Apr 5 Apr 6 Apr 7 Apr 8
8:00

9:00

10:00

11:00

12:00

1:00 Preview

2:00 Show

3:00

4:00

5:00

6:00 DRESS DRESS DRESS

7:00 Preview OPENING

8:00

9:00

10:00

11:00 Production Meeting Production Meeting Production Meeting

12:00

S N
T O DAY OFF!!
A T
G E
E S

S N
H O
O T
W E
S

O N
T O
H T
E E
R S