0% found this document useful (0 votes)
32 views4 pages

Objective 1 Year 2 Year 6 Months 1 Year 2 Year 6 Month S 6 Month S

The document outlines the objectives and timeline of a 3-year project involving a requirement feasibility study in the first 6 months, coursework and seminars in year 1, a literature survey and review in year 1, implementation of an existing methodology in year 2, proposing a solution in year 2, testing and analysis in year 3, and concluding results in year 3.

Uploaded by

anil gaur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views4 pages

Objective 1 Year 2 Year 6 Months 1 Year 2 Year 6 Month S 6 Month S

The document outlines the objectives and timeline of a 3-year project involving a requirement feasibility study in the first 6 months, coursework and seminars in year 1, a literature survey and review in year 1, implementation of an existing methodology in year 2, proposing a solution in year 2, testing and analysis in year 3, and concluding results in year 3.

Uploaded by

anil gaur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Objective 6 1 year 1 year 2 year 2 year

months 6 6
month month
s s
Requirement feasibility study and
feasibility analysis

Course work and seminar

Literature Survey/Review

Implementation of Existing
Methodology

Proposed Solution

Testing

Result and Conclusion


3 year
Aug-Jan
2020
Feb-Jul
2019
Aug-Jan
2019
Feb-Jul
2018
Aug-Jan
2018
Feb-Jul
2017
Requirement Course work Literature Implementation
Feasibility and seminar Survey/ of Existing
Study and Review Methodology
Feasibility
Analysis
Proposed Testing Result and
Solution and Conclusion
Analysis

You might also like