0% found this document useful (0 votes)
42 views1 page

Project: Worker Hospital & Integrated Health Centre (Raslaffan) Verification Calculation of D-Ahu-12 External Static Pressure

The document is a verification calculation for an air handling unit (AHU) used in a worker hospital and integrated health centre project. It lists the specified and verified design parameters for the external static pressure of AHU unit D-AHU-12 located in the basement mechanical room, including the specified and verified flow rate and external static pressure. The verified external static pressure of 788 Pa is lower than the specified design value of 1329 Pa.

Uploaded by

ibnrafeeq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views1 page

Project: Worker Hospital & Integrated Health Centre (Raslaffan) Verification Calculation of D-Ahu-12 External Static Pressure

The document is a verification calculation for an air handling unit (AHU) used in a worker hospital and integrated health centre project. It lists the specified and verified design parameters for the external static pressure of AHU unit D-AHU-12 located in the basement mechanical room, including the specified and verified flow rate and external static pressure. The verified external static pressure of 788 Pa is lower than the specified design value of 1329 Pa.

Uploaded by

ibnrafeeq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT : WORKER HOSPITAL & INTEGRATED HEALTH CENTRE (RASLAFFAN)

VERIFICATION CALCULATION OF D-AHU-12 EXTERNAL STATIC PRESSURE

S.No FLOOR TYPE TAG NO LOCATION IFC DESIGN SPECIFIED PARAMETERS VERIFIED DESIGN PARAMETERS
DESIGN FLOW (L/S) DESIGN ESP(PA) VERIFIED FLOW (L/S) VERIFIED ESP(PA)
WH - ZONE-2 MECHANICAL
1 BASEMENT RECIRCULATED D-AHU-12 ROOM 13796 1329 13405 788