Activity Week in Which Activity Is Done Scheduled Duration

- The document provides a schedule for construction activities over 4 weeks including roof slab shuttering and concreting, brick work on multiple floors, steel fabrication, shuttering and concreting for columns, shear wall concreting, and lintel beam/sunshade fabrication, shuttering and concreting. - It lists the planned duration and cost for each activity broken down by week to total 653,111.56 for the scheduled work over the 4 week period.

Uploaded by

RahulRandy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views6 pages

Activity Week in Which Activity Is Done Scheduled Duration

- The document provides a schedule for construction activities over 4 weeks including roof slab shuttering and concreting, brick work on multiple floors, steel fabrication, shuttering and concreting for columns, shear wall concreting, and lintel beam/sunshade fabrication, shuttering and concreting. - It lists the planned duration and cost for each activity broken down by week to total 653,111.56 for the scheduled work over the 4 week period.

Uploaded by

RahulRandy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

ACTIVITY WEEK IN WHICH ACTIVITY IS DONE SCHEDULED DURATION

Roof Slab Shuttering 1 1


Roof Slab Concreting 2 1
First Floor Brick Work 1,2,3 3
Second Floor Brick Work 1,2,3,4 12
Third Floor Brick Work 1,2,3,4 10
Fourth Floor Brick Work 1,2,3,4 9
Steel Fabrication for column 3,4 8
Shuttering for column 3 3
Concreting for column 3,4 4
Shear wall concreting 4 1
Concreting for LMR 4 1
Lintel Beam/ Sunshade Fabrication 1,2,3,4 21
Lintel Beam/ Sunshade Shuttering 1,3,4 14
Lintel Beam/ Sunshade Concreting 2 5
ACTUAL DURATION (DAYS) SCHEDULED WORK ACTUAL WORK DONE BCWS (Rs.)
1 35 sqm 35 sqm 35300
1 35 sqm 35 sqm 70500
3 15 cum 15 cum 130000
14 84 cum 84 cum 570000
11 55 cum 55 cum 425000
10 33 cum 33 cum 220000
9 20 sqm 20 sqm 140000
3 20 sqm 20 sqm 60000
4 30 cum 30 cum 150000
1 30 cum 30 cum 81200
1 30 cum 30 cum 54400
24 40 sqm 40 sqm 148400
17 40 sqm 40 sqm 33000
5 40 cum 40 cum 2200

TOTAL 2120000
BCWP (Rs.) ACWP (Rs.) SV (Rs.) CV (Rs.) SPI CPI
35300 35300 0 0 1 1
70500 70500 0 0 1 1
130000 132200 0 -2200 1 0.9833585477
665000 672000 95000 -7000 1.1666666667 0.9895833333
467500 484800 42500 -17300 1.1 0.9643151815
244444.4444 264400 24444.4444 -19955.5556 1.1111111109 0.9245251301
157500 167500 17500 -10000 1.125 0.9402985075
60000 61400 0 -1400 1 0.9771986971
150000 161200 0 -11200 1 0.9305210918
81200 81200 0 0 1 1
54400 54400 0 0 1 1
169600 174800 21200 -5200 1.1428571429 0.9702517162
40071.42857 41500 7071.42857 -1428.57143 1.2142857142 0.965576592
2200 2200 0 0 1 1

2327715.873 2403400 207715.873 -75684.12698 1.097979185 0.9685095585


OCTOBER 2400000

WEEK 1 WEEK 2
ACTIVITY Planned This COST DURATION ACTIVITY
week
Roof Slab Shutter 35 Sqm 9592.8 1 Roof Slab Concret
First Floor Brick 5 Cum 11991 68.52 1 First Floor Brick
Second Floor Bric 20 Cum 47964 4 Second Floor Bric
Third Floor Brick 10 Cum 23982 2 Third Floor Brick
Forth Floor Brick
Sunshade 6 Cum 14389.2 2 Forth Floor Brick
Sunshade
Fabrication
Sunshade 0.3MT 13840 3460 7 Fabrication
Sunshade
Shuttering
Sunshade 15 Sqm 4111.2 7 Shuttering
Sunshade
Concreting 1 Cum 0 0 Concreting
125870.2 24
120000
-5870.2
WEEK 3
Planned This duration COST ACTIVITY Cost
week Ground Floor BW 0 0
35 Sqm 1 19185.6 First Floor Brick 1 11991
5 Cum 1 11991 Second Floor Bric 4 59964
20 Cum 5 59964 Third Floor Brick 3 35973
10 Cum 2 23982 Forth Floor Brick 2 14389.2
6 Cum 1 7194.6 Steel Fabrication 5 25350
0.3MT 5 9885.714286 Shuttering for c 3 16444.8
15 Sqm 0 0 Concreting
Sunshade for c 3 32889.6
1 Cum 5 548.16 Fabrication
Sunshade 7 13840
20 Shuttering
Sunshade 7 4111.2
Concreting 0 0
132751.0743 214952.8
WEEK 4
ACTIVITY cost
First Floor Brick 0 0
Second Floor Bric 1 14991
Third Floor Brick 4 47964
Forth Floor Brick 5 35973
Steel Fabrication 4 20280
Concreting for c 1 10963.2
Shear wall concr 1 21926.4
Concreting
Sunshade for L 1 14617.6
Fabrication
Sunshade 5 9885.714286
Shuttering
Sunshade 5 2936.571429
Concreting 0 0
179537.4857

653111.56