1. The document discusses various topics related to tank inspections and repairs as per API 653 standards. 2. It provides multiple choice questions regarding swing line inspections, roof tank inspections, weld preparation measurement gauges, likely causes of tank bottom lining failure, effective inspection methods before deciding repair methods, visual inspection examiner qualifications, requirements for repairing tanks operating at low temperatures, suitable temperature ranges for epoxy lining, and inspector qualifications. 3. It also summarizes that the exam focused heavily on hydrotesting, lining, repairing lining, and lining failure; and emphasized annexes B, G, and C. Calculations for corrosion allowances and closed book format were also examined.

Uploaded by

Sameh Amin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
75% found this document useful (4 votes)
424 views2 pages

API 653 امتحان 11-2017

1. The document discusses various topics related to tank inspections and repairs as per API 653 standards. 2. It provides multiple choice questions regarding swing line inspections, roof tank inspections, weld preparation measurement gauges, likely causes of tank bottom lining failure, effective inspection methods before deciding repair methods, visual inspection examiner qualifications, requirements for repairing tanks operating at low temperatures, suitable temperature ranges for epoxy lining, and inspector qualifications. 3. It also summarizes that the exam focused heavily on hydrotesting, lining, repairing lining, and lining failure; and emphasized annexes B, G, and C. Calculations for corrosion allowances and closed book format were also examined.

Uploaded by

Sameh Amin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

1.

Swing line inspection for the purpose of


A- check the condition of the line
B- check the cleanness of the line
C- check the free movement of the line
D- check the tightness of the line

2. Before roof tank inspection, the deck plate shall be


A- water wash
B-UT testing
C- sand blasting
D- Air testing
3. What is the suitable gauge used for measurement of weld preparation Angel? bridge cam
gauge
4. What’s the most likely effect on the failure of the linning of tank bottom?
A- wrong coating specification
B- in proper curing of the coating
C- failure to use solvent cleaning before painting
D- low DFT
5. What’s the most effective method of inspection before decide the method of repairing of
linning
A- visual inspection
B-Holiday test
C- service assessment
D- correct procedure
6. As per API 653, examiner for Visual inspection qualification shall be as per
A- SNT-C - level I
B- SNT-C - level II
C- API 650
B- AWS

7. Repairing tank which was working at 15 F / - 10 C , the organization of repairing


A- shall provide the WPS
B- must conduct impact test
C- no further action
D- shall provide qualified welders
8. Epoxy linear linning used at which temperature?
A- 160F - 220 F
B- 180 F
C- 120F - 160F
B- 160F - 180F
9.

‫ متحان‬API 653 ‫ فى الميه او اكتر من االمتحانات القديمه‬65 ‫كان‬


‫ بس نخلى بلنا انه ركز اوى على الهيروتست فى خمس اسئله ممكن يتم او ال اهم سؤال كان لو فاتحنا دور شيت فى‬shell
‫و اى اكتر طريقه نقدر نستخدمه ‪ inspector Qualifications‬واهم سؤالين كانوا ‪ lining‬نعمل هيدرو وال كمان ركز اوى على‬
‫‪ repairing lining‬قبل ما نحدد‬
‫‪ lining failure‬واى اكتر شئ سبب فى‬
‫‪H‬اسئله كتير على حسابات التخانه و‬
‫بيحكى قصص طويله اوى وفى االخر الخل فى سطر‬
‫‪ annex B , G , C‬ركز على‬
‫وجاب سؤال او اتنين على كل واحد بصيغه مختلفه‬
‫‪ caustic mitigation‬وجاب خمس اسئله منهم على ‪ API 571‬ركز على‬
‫‪Closed Book‬‬
‫بس وبيحكى فيلم طويل ‪ H‬و ال ‪ H-1‬وهل هى ‪ H‬الحسابات اللى فيها لعب ركز على حسابات‬
‫‪bottom6 in‬اصعبهم فى وجه نظرى ان كان مدى عيب ممتد فوق ال‬
‫‪H liquid = 39‬‬
‫‪H tank = 40‬‬
‫? ‪H for calculation‬‬