Script
Script
Script
Contents
o Production Schedule
o Script / Shooting Script
o Storyboard
o Props List
o Crew List
o Location Recces
o Clearances and Confirmations
o Contingency Plan
Production Schedule
Please include location, time of film, what you are filming and teams members
including actors
Date:
Monday Tuesday Wednesday Thursday Friday Saturday Sunday
5th 6th 7th February 9th 10th
February February at after 12 o’clock February February
3pm the around in Henley and at at around between
field by my 4:30pm in around 3 in 2pm in 12pm and 6
house Henley Marlow Marlow pm in
Marlow
We will be capture film the shots capture use the sun
filming the the sun (tracking) of the sun at its highest
opening going inside and setting on and as its
shots of the down over outside of the the field setting to
video, the the car by my film the
stop Thames house, I pieces with
motion will be Emma and
shots getting the joe in the
shots of field and
the couple the shots
holding where joe is
hands and on his own,
walking singing the
with each song
other
I will be I will be on Joe Tuckerman Emma Emma
using my own Johnson Johnson
Emma and it will and Joe and Joe
Johnson be after Tuckerman Tuckerman
and Joe college
Tuckerman
Date:
Monday Tuesday Wednesday Thursday Friday Saturday Sunday
12th 13th 15th
February at February at February
my house 5pm at my around
at 4pm house 3pm by the
field and at
Gosmore
park in
Marlow by
the river
and under
the bridge
I will be Joe finish off all
filming the plugging lip syncing
scene the guitar scenes and
where Joe into the tracking
catches amp at shots of Joe
Emma in different and Emma
bed with angles
Liam. On
this day I
will also film
the shots of
Emma
getting
texts from
another
boy (Liam)
Liam Curtin, Joe Joe
Joe Tuckerman Tuckerman
Tuckerman and Emma
and Emma Johnson
Johnson
Date:
Monday Tuesday Wednesday Thursday Friday Saturday Sunday
Script
In order to complete this correctly, you need to add stage directions for your actors
I will use stop motion around the girls ‘This time, three days, I lost, your
head and play the pictures quickly. faith’
The singers talk directly to camera, ‘I’m not perfect, promises drifting
archive footage of water on the away’
beach
Guitar This item is mine but Joe Joe uses it in During the
will be using it for the parts instrumental
video, its red and white throughout parts of the
with a wooden neck. the video. song.
Guitar AMP This prop is mine and it There will be At the
will be shot in my a close up beginning of
bedroom shot of Joe the song
Plugging a
guitar in
Crew List
Emma Johnson The girl in the video 5th, 6th and 9thof
February
Hazards Solutions:
Be careful when filming the running
When joe rushes out the house he could scene,
fall
Location Recce
Please produce a location recce for EVERY location used
Hazards Solutions:
Check the area that we’re using to film
before filming in order to avoid any
Falling when filming, rabbit holes etc. hazards.
Location Recce
Please produce a location recce for EVERY location used
Hazards Solutions:
Stay a safe distance away from the
Falling off of the bridge, into the water edge and don’t lean over the side
Location Recce
Please produce a location recce for EVERY location used
I won’t be adding in any sounds You may be able to hear the sounds of
the water and Birds etc.
Power Information Solutions:
There is nowhere at this location when I I will need to previously charge all of the
can access power equipment I need to use
Hazards Solutions:
Falling into the water where this isn’t a Stay well away from the edge at all
fence up times
]
I am planning to film on the 5th, 6th, 7th and 10th of Janu7ray at the field by my
house. The idea is to film in the sun and when the sun goes down etc. In the
event that it’s raining or not very sunny I plan to go to Gosmore Park in
Marlow, under the motorway bridge as it’s a good location for the style of the
song, e.g. by the river. The week that I’m going to be filming is meant to be
nice sunny weather which helps me as I won’t have to find different
locations.