The document discusses key aspects of the Scrum process including that it is a subset of Agile processes divided into roles, artifacts, and time boxes. It uses iterative and incremental practices to manage complex software development. An Agile product backlog contains prioritized features and functionality for the project. A Scrum board is used to visually display current sprint work. A burn down chart tracks project progress by showing work left over time. Displaying time provides a more granular view of progress and allows teams to carefully track time spent and remaining.

Uploaded by

Adam Ong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (2 votes)
3K views1 page

ACT200

The document discusses key aspects of the Scrum process including that it is a subset of Agile processes divided into roles, artifacts, and time boxes. It uses iterative and incremental practices to manage complex software development. An Agile product backlog contains prioritized features and functionality for the project. A Scrum board is used to visually display current sprint work. A burn down chart tracks project progress by showing work left over time. Displaying time provides a more granular view of progress and allows teams to carefully track time spent and remaining.

Uploaded by

Adam Ong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

ACT200

Unit 1 Lesson1:

Scrum Process

- Subset of Agile processes


- Divided to 3 Categories
o Roles
o Artifacts
o Time Boxes
- Used to manage complex Software and product development
- Uses iterative and incremental practices
- Significantly imporved productivity and reduce time to benefits relative to waterfall process
- Can cope better with changes

Agile Product Backlog in Scrum

- Prioritized features list


- Contains short description and functionality desired
- Writing down everything they can think of for Agile Backlog Prioritization
- List of all things that need to be done within project
- Replaces traditional requirements specification artifacts

Scrum Board

- Tool that helps team make Sprint Backlog items visible


- Used to visually display current project work and work that has been take into current sprint

Scrum Board Layout

- Purpose is to show progress of project work


- Progress of scrum probject can be stracked by a BURNDOWN Chart

BurnDown chart

- Graphical representation of work left vs. Time


- Outsiding work if often on vertical axis and time is horizontal axis

Benefit of Displaying time

- More granular view of progress


- Teams are asked to carefully track time spent and remaining time
-