Enhanced Station Initiative Package 3: William Montanile, P.E. Program Manager February 13, 2018 Community Board 7

Download as pdf or txt
Download as pdf or txt
You are on page 1of 33

ENHANCED STATION INITIATIVE

PACKAGE 3

William Montanile, P.E. February 13, 2018


Program Manager Community Board 7
Contract Information
General1. 
Information
Award date
2. 
Contractor Duration ECCO III with Hardesty & Hanover/Lee Harris
ü  Pomeroy
Contractor
Award ü  DesignerOctober 25, 2017
Substantial Completion
ü  cost December 2018

Construction Cost $111,190,000

Stations 163 Street - Amsterdam Avenue C


Cathedral Parkway (110 Street) BC
86 Street BC
72 Street BC

2
Package 3 Summary
q  163 Street
Underground, two side platforms
Central large mezzanine, building entrance

q  Cathedral Parkway (110 Street)


Underground, two side platforms
Small mezzanine, exposed express lanes

q  86 Street
Underground, two level stacked platforms
No mezzanine, no connections

q  72 Street
Underground, two level stacked platforms
No mezzanine, no connections

3
Scope & Key Elements
1.  Station Repairs
1.  Waterproofing
2.  Repair/replace floor topping
3.  Concrete spall repair
2.  Rehabilitated Station Entrances
1.  Guardrail integrated or freestanding totem
2.  Countdown clocks
3.  Illuminated handrails
3.  Improved Mezzanines
4.  Improved Platforms

4
Scope & Key Elements
5.  Other Improved Customer Amenities
1.  Countdown clocks
2.  Wi-Fi
3.  Help Points
4.  LED lighting
5.  Consolidated wireway
6.  Design-build Contracting

5
Station Closures
Scheduled dates 1.  Award date
Station 2.  Close
Duration Re-open Allowable Duration
Cathedral Parkway April 9,
ü  2018
Contractor September 2018 Less than 6 months
(110 Street) BC
ü  Designer
86 Street BC June 4, 2018 October 2018 Less than 6 months
ü  cost
72 Street BC May 7, 2018 October 2018 Less than 6 months

6
Diversions
1.  Award dateWeeknight Weekend
Station Northbound Southbound Northbound Southbound
2.  Duration
Cathedral
Parkway (110 ü  Contractor
Street) BC
ü  Designer
86 Street BC ü  20
cost 20 9 9

72 Street BC

110 St/86 St/72 St – 40 weeknight and 18 weekend diversions

7
Cathedral Parkway (110 Street)
110 Street Existing Entry

9
110 Street Proposed Canopy Entry

10
110 Street Existing Entry

11
110 Street Proposed Central Park Entry

12
110 Street Existing Entrance Adjacent to Building

13
110 Street Proposed Entry Adjacent to Building

14
110 Street Existing Mezzanine

15
110 Street Proposed Mezzanine

16
110 Street Existing Platform

17
110 Street Proposed Platform

18
86 Street
86 Street Existing Entrance Adjacent to Building

20
86 Street Proposed Entry Adjacent to Building

21
86 Street Existing Control Area

22
86 Street Proposed Control Area

23
86 Street Existing Platform

24
86 Street Proposed Platform

25
72 Street
Existing Station Entrance

27
72 Street Proposed Entry at Adjacent Building

28
72 Street Existing Control Area

29
72 Street Proposed Control Area

30
72 Street Existing Platform

BROADWAY
31
72 Street Proposed Platform

32
Thank You