Enhanced Station Initiative Package 3: William Montanile, P.E. Program Manager February 13, 2018 Community Board 7
Enhanced Station Initiative Package 3: William Montanile, P.E. Program Manager February 13, 2018 Community Board 7
Enhanced Station Initiative Package 3: William Montanile, P.E. Program Manager February 13, 2018 Community Board 7
PACKAGE 3
2
Package 3 Summary
q 163 Street
Underground, two side platforms
Central large mezzanine, building entrance
q 86 Street
Underground, two level stacked platforms
No mezzanine, no connections
q 72 Street
Underground, two level stacked platforms
No mezzanine, no connections
3
Scope & Key Elements
1. Station Repairs
1. Waterproofing
2. Repair/replace floor topping
3. Concrete spall repair
2. Rehabilitated Station Entrances
1. Guardrail integrated or freestanding totem
2. Countdown clocks
3. Illuminated handrails
3. Improved Mezzanines
4. Improved Platforms
4
Scope & Key Elements
5. Other Improved Customer Amenities
1. Countdown clocks
2. Wi-Fi
3. Help Points
4. LED lighting
5. Consolidated wireway
6. Design-build Contracting
5
Station Closures
Scheduled dates 1. Award date
Station 2. Close
Duration Re-open Allowable Duration
Cathedral Parkway April 9,
ü 2018
Contractor September 2018 Less than 6 months
(110 Street) BC
ü Designer
86 Street BC June 4, 2018 October 2018 Less than 6 months
ü cost
72 Street BC May 7, 2018 October 2018 Less than 6 months
6
Diversions
1. Award dateWeeknight Weekend
Station Northbound Southbound Northbound Southbound
2. Duration
Cathedral
Parkway (110 ü Contractor
Street) BC
ü Designer
86 Street BC ü 20
cost 20 9 9
72 Street BC
7
Cathedral Parkway (110 Street)
110 Street Existing Entry
9
110 Street Proposed Canopy Entry
10
110 Street Existing Entry
11
110 Street Proposed Central Park Entry
12
110 Street Existing Entrance Adjacent to Building
13
110 Street Proposed Entry Adjacent to Building
14
110 Street Existing Mezzanine
15
110 Street Proposed Mezzanine
16
110 Street Existing Platform
17
110 Street Proposed Platform
18
86 Street
86 Street Existing Entrance Adjacent to Building
20
86 Street Proposed Entry Adjacent to Building
21
86 Street Existing Control Area
22
86 Street Proposed Control Area
23
86 Street Existing Platform
24
86 Street Proposed Platform
25
72 Street
Existing Station Entrance
27
72 Street Proposed Entry at Adjacent Building
28
72 Street Existing Control Area
29
72 Street Proposed Control Area
30
72 Street Existing Platform
BROADWAY
31
72 Street Proposed Platform
32
Thank You
33