The document provides guidance on electrical insulation testing for high voltage equipment up to 33kV. It includes a flow chart that outlines the different tests required depending on the cable or equipment type, whether it is new or previously in service. Some key tests mentioned are 5kV insulation resistance tests, 11kV fault repair, 33kV cable installations requiring DC phase-earth tests, and AC pressure tests for switchgear.

Uploaded by

surag1982
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
289 views1 page

SUB-02-613 Appendix 2 Flow Chart PDF

The document provides guidance on electrical insulation testing for high voltage equipment up to 33kV. It includes a flow chart that outlines the different tests required depending on the cable or equipment type, whether it is new or previously in service. Some key tests mentioned are 5kV insulation resistance tests, 11kV fault repair, 33kV cable installations requiring DC phase-earth tests, and AC pressure tests for switchgear.

Uploaded by

surag1982
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

5 kV Insulation

Resistance Test
All other 11 kV Fault Repair
Cable Types & Small Deviation
All other
SUB-02- 613, Issue No2 11 kV Cable
33 kV XLPE Installations DC Phase- Phase and
5 kV Insulation Cable+ Switchgear
Cable Cable Type Cable + Cable Phase- Earth Test, prior
Resistance Test, and/ or Transformer
Electrical Insulation Testing of HV No to energisation, Table 10

Equipment up to33kV:
Yes
33 kV Cable
Appendix2 Installations DC Phase- Earth Test,
prior to energisation,
Flow Chart New
Table 10
Previously
New or in Service 5 kV HV & 1 kV LV,
Previously in Insulation
Service Resistance Test

Ground Mounted
Secondary

Primary
5 kV HV & LV ,
Transformer
Transformers Insulation
Type
Resistance Test

Pole Mounted

5 kV HV & 1 kV LV,
Insulation Resistance
Yes Test, on pole , prior to
energisation.
AC Pressure Test
Air break
Prior to Site Tests
switch or PM
No 1-4 , Section10.1 ,
fuses DC Phase- Earth Test,
Table 8 11 kV RMU & 11 kV Including
section11 , prior to
Extensible secondary
energisation, Table 10
Previously In switchgear
Service AC Pressure Test
Site Assembled
New or Combined Installation,
Switchgear Switchgear Connections @
Previously in Including or Excluding
New Type Site, Tests1-3 ,
Service Transformer
Section10.1 ,
Table8
DC Phase- Phase
Primary and33 kV Extensible switchgear, Excluding and Phase- Earth
33 kV outdoor circuit breakers
, 33 kV RMU's Test, section11 , prior to
energisation,
Table 10
5 kV Insulation
Resistance Test,
on pole , prior to
Combined Equipment Tests
PMAR's , Air
break switches&
energisation. undertaken prior to Energisation
Pole mounted
fuses
Table 8 Rated Voltage (kV) AC test voltage (kV rms)
New New Equipment Previously in Service
AC Pressure Test 500 V Insulation 3.3 - 4
New or
Prior to Site, Resistance Test, 6.6 - 8
Previously in
Section10.4.1 , prior to 11 22.4 12
Service
Previously In Table8. energisation.
22 40 25
Service
33 56 36
Unearthed Test Duration - 1 minute
500 V Insulation
Earthed or Earthed Resistance Test,
Voltage Tables 9 & 10 Rated Voltage (kV) DC test voltage (kV)
Unearthed prior to
Transformers Phase - Phase Phase - Earth
energisation.
3.3 5 3
Discrete Equipment Tests Discrete Equipment Tests 6.6 10 6
11 17 10
Prior To Site undertaken at Site 22 34 20
33 51 30
Test Duration - 5 minutes