LOADINGS
LOADINGS
LOADINGS
*Restrooms
a. Ceiling – suspended metal lath and cement plaster 0.72
b. Waterproofing – liquid, applied 0.05
c. Floor Fill – stone concrete (per mm) 0.023
d. Floor Finish – ceramic or quarry tiles (20mm) on 13mm mortar bed 0.77
e. Wall Coverings – cement tile 0.77
f. Partition – wood studs, 13mm gypsum board each side 0.38
Superimposed Dead Load (SDL) 2.713
Live Load 2.4
@Third Floor
*Rooms (Hotel Rooms)
a. Ceiling – suspended metal lath and cement plaster 0.72
b. Waterproofing – liquid, applied 0.05
c. Floor Fill – stone concrete (per mm) 0.023
d. Floor Finish – ceramic or quarry tile (20mm) on 13mm mortar bed 0.77
Superimposed Dead Load (SDL) 1.563
Live Load 1.9
*Restrooms
a. Ceiling – suspended metal lath and cement plaster 0.72
b. Waterproofing – liquid, applied 0.05
c. Floor Fill – stone concrete (per mm) 0.023
d. Floor Finish – ceramic or quarry tiles (20mm) on 13mm mortar bed 0.77
Dawang, Joanne S.
Load (kPa)
e. Wall Coverings – cement tile 0.77
f. Partition – wood studs, 13mm gypsum board each side 0.38
Superimposed Dead Load (SDL) 2.713
Live Load 2.4
*Hallway or Corridor
@Fourth Floor
*Rooms (Hotel Rooms)
a. Ceiling – suspended metal lath and cement plaster 0.72
b. Waterproofing – liquid, applied 0.05
c. Floor Fill – stone concrete (per mm) 0.023
d. Floor Finish – ceramic or quarry tile (20mm) on 13mm mortar bed 0.77
Superimposed Dead Load (SDL) 1.563
Live Load 1.9
*Restrooms
a. Ceiling – suspended metal lath and cement plaster 0.72
b. Waterproofing – liquid, applied 0.05
c. Floor Fill – stone concrete (per mm) 0.023
d. Floor Finish – ceramic or quarry tiles (20mm) on 13mm mortar bed 0.77
e. Wall Coverings – cement tile 0.77
f. Partition – wood studs, 13mm gypsum board each side 0.38
Superimposed Dead Load (SDL) 2.713
Live Load 2.4
Dawang, Joanne S.
Load (kPa)
*Hallway or Corridor
@Roof Deck
@Other Loads
a. Elevator (per floor level)
DL + LL = 2*total load
@Second Floor
Total Load 22.852
@Third and Fourth Floors
Total Load 27.978
END