A pressure buildup test was conducted on an oil well. Analysis of the test data using the Horner plot method yielded the following results: The effective permeability to oil was determined to be 48 Md. The original reservoir pressure was estimated to be 1950 psia. The skin factor was calculated to be 1.507.

Uploaded by

Usman Hasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views2 pages

Assignment Excel Prob

A pressure buildup test was conducted on an oil well. Analysis of the test data using the Horner plot method yielded the following results: The effective permeability to oil was determined to be 48 Md. The original reservoir pressure was estimated to be 1950 psia. The skin factor was calculated to be 1.507.

Uploaded by

Usman Hasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Well Testing

PE-408
Assignment
Roll no: PE-018
Q): A pressure-buildup test was conducted on a well early in the life of an oil reservoir having the properties summarized ne
Detremine the effective permeability to oil, the original reservoir pressure, and the skin factor.

mu 1 cp
h 22 f
q 500 STB/D
Ct 0.00002 1/psi
phi 0.2
tp 3 day 72 hrs
rw 0.3 f
B 1.3 RB/STB
Horner
Pwf 1150 psia 1920
f(x) = -43.0397570278 ln(x) + 1
1900 pi=1950R²psia
= 0.9999732851
Solution: 1880
Shut-in Time, BHP,pws (tp+∆t)/∆t log[(tp+∆t)/∆t]
1860
(hours) (psia)

Shut-i n bhp, p
1840
0 115 #DIV/0! #DIV/0!

ps i a
1820
2 1794 37 1.5682017241
4 1823 19 1.278753601 1800
8 1850 10 1 1780
1
16 1876 5.5 0.7403626895 1760
24 1890 4 0.6020599913 1740
48 1910 2.5 0.3979400087 1720

Slope m -99 psia/cycle

k 48 Md

pi 1950 psia
73 p @ this ratio

p1hr 1765 psia

s 1.507668559
operties summarized next. The well ws produced at a constant rate of 500 STB/D for 3 days before being shut in.

Horner Plot
Horner Pl ot Logari thmi c (Horner Pl ot)
f(x) = -43.0397570278 ln(x) + 1949.4530529023
R² = 0.9999732851

10 100

Horner time ratio