DETAILED ESTIMATE
CIRCLE : ELURU
DIVISION : ELURU
MANDAL : DENDULURU
Est.Cost.Rs.10.00 lakhs
The work " B.T Renewal to the R/F EGK Road to Seethampeta".Est.cost.Rs.10.00 lakhs was
administratively sanctioned under 13th Finance grant for the year 2012-13 vide
S.No Reach Length Grant in Year of Present status Proposals for repair
in Km which laid construc
tion
From To
1 0/0 0/200 0.20 JAL 2011 BT Surface in good No need
condition
2 0/1-10m 1/2+30m 0.24 RRM 2000 Badly damaged WBM BT MSS with WBM Gr-III
surface with huge layer
ditches
3 0/2 0/520 0.32 RRM 2000 BT Surface with patches Patches with WBM Gr-
at certain locations III&BT renewal coat with
MSS
4 0/520 0/830 0.31 RRM 2000 BT Surface with patches Patches with WBM Gr-
at certain locations III&BT patches
Retaining wall is needed for the reach from 1/0+50m to 1/155m to protect the road from
scouring due to rain&village sewage water.
Though,it is necessary to provide renewal coat for the reach from 0/520 to 0/830m,it could not be
proposed due to paucity of funds.
Further lump sum provisions are made in the estimate for the following items:-
The estimate is prepared as per the current SSR,i.e.2012-2013 rates and as per
the A.P Revised Standard data work will be carried out as per APDSS after entrustment
Date of inspection :
Name of the work : B.T Renewal to the R/F EGK Road to Seethampeta
Nature of grant :13th Finance commission
Admn.Sanction Ref:
Officers Present: Sri.G.Balakrishna,Dy.Exe.Engineer,PR,Eluru
Sri.D.V.Srinivasa Rao,Asst.Exe.Engineer,PR,Eluru
INSPECTION NOTE
Retaining wall is needed for the reach from 1/0+50m to 1/155m to protect the road from
scouring due to rain&village sewage water.
EXECUTIVE ENGINEER
PANCHAYAT RAJ,ELURU
R,PRI,ELURU
No need
BT MSS with WBM Gr-
III layer
Patches with WBM Gr-
III&BT renewal coat
with MSS
No need
Est.Cost.Rs.10.00 lakhs
Est.Cost.Rs.10.00 lakhs
1 Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface,
damaged edges and raveling as per technical specification Clause 1906 MORD.for Gr-III
From 0/2 to 1/100
----do--- 1X1 5.5 2.200 ----- 12.10sqm
----do--- 1X1 6.5 2.600 ----- 16.90sqm
----do--- 1X1 3.5 2.500 ----- 8.75sqm
----do--- 1X1 3.2 3.750 ----- 12.00sqm
----do--- 1X2 4.5 2.600 ----- 23.40sqm
----do--- 1X1 2.4 1.500 ----- 3.60sqm
----do--- 1X1 4.5 2.000 ----- 9.00sqm
85.75sqm 312.47 1sqm
2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound
macadam specification including spreading in uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone
screening to fill-up the interstices of coarse aggregate, watering and compacting to the required
density Grading 3 as per Technical Specification Clause 405 MORD/ 404 MORTH. For compacted
thickness of 75 mm.
3 Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of
granular base including cleaning of road surface and spraying primer at the rate of 0.85
kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use
on Wet mix macadam & WBM)
4 Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at
the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface
cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD.
6 Removal of all failed material, trimming of completed excavation to provide firm vertical
faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per
clause 503, back filling the pot holes with hot bituminous material as per clause 511,
compacting, trimming and finishing the surface to form a smooth continuous surface, all as
per clause 3004.2 MORTH
7 Construction of granular shoulder by providing well graded material / Close graded material,
spreading in uniform layers with motor grader on prepared surface, mixing by mix in place
method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN /
Vibratory Roller to achieve the desired density, complete as per Technical Specification
Clause 401 MORD / MORTH.
8 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1
including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches
with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
9 Filling in foundation trenches with sand as per drawing and technical specification Clause 305.3.9
MORD & 304 MORTH
For Retaining wall 1X1 105.0 0.900 0.10 9.45Cum
9.45Cum 1101.64 1Cum
10 Providing concrete for plain/reinforced concrete in open foundations using 40 mm nominal size
Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration
including curing for 14 days complete as per drawings and technical specifications Clause 802, 803,
1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.M10 grade
For Retaining wall 1X1 105.0 0.900 0.10 9.45Cum
9.45Cum 3913.31 1Cum
11 Plain/reinforced cement concrete in substructure complete as per drawings and technical specification
Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH with M15
grade concrete for drain walls
For Retaining wall 1X1 105.0 (0.6+0.3)/2 0.75 35.44Cum
35.44Cum 4471.75 1Cum
TOTAL
S.No Description of item Nos Measurements Quantity Rate Per
Length Bredth Depth
Amount
26794
203157
27452
22240
Amount
403767
7034
17380
12527
10410
36981
158479
926221
DATA SHEET
ROAD WORK:-
By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 12.08
Mazdoor (Unskilled) day 250.00
Add MA@25%
b) Machinery
Three wheel 80-100 kN static roller @ 10 cum per hour hour 36.00
for Rural Area works
Water tanker 6 kl capacity hour 24.00
c) Material (Refer Tables 400.7, 8, 9 and 10 MORD/
400.6, 7, 8 & 9 MORTH)
Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum per 10 sqm cum 435.60
for compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.18 /10sqm cum 86.40
Binding Material
Binding Material @ 0.06 cum per 10 sqm for Grading cum 28.80
2 material
Water kl 144.00
d&e) Overheads & Contractors Profit@14%
Using 11.2 mm for Grading 2 :
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Gravel filling
Unit = cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 0.31
Add MA@25%
b) Material
Gravel cum 1.00
Sienorage charges cum 1.00
Overheads & Contractors [email protected]%
Rate per cum = a+b+c+d
Unit = cum
Taking output = 75cum (172.50 t)
a) Labour
Mate day ----
Mason (1st class) day 5.00
Mason (2nd class) day 5.00
Mazdoor (unskilled) day 150.00
Mazdoor(skilled) day 6.00
Mazdoor (semi-skilled) day 6.00
Add MA@25%
b) Machinery
Concrete mixer 0.28/0.40 cum capacity ( 6 mixers) with Hour 36.00
weight batcher and suitable capacity calibrated water
tank
Screed vibrator Hour 9.00
Plate vibrator Hour 9.00
Water tanker 6 Kl. Capacity Hour 5.00
c) Material
(I) Crushed stone coarse aggregates, grading will be as
per clause 1501.2.4.1 (Table 1500.1) of specifications
@ 0.90 Cum/cum of concrete
20mm Cum 44.55
10mm Cum 22.95
(ii) Sand as per IS:383 and conforming to clause cum 33.75
1500.2.4.2. @ 0.45 cum of concrete
(iii) Cement @ 400 Kg/cum of concrete t 30.00
(iv) Polythene sheet 125 micron sqm 412.5
Bitumenous sealant 800 ml. Per joint for 23 joints Litre 19.00
Jute rope 12mm dia including 5 per cent wastage m 90.00
Debonding strips 2.50m. (length) x 10mm (width) x 5 m 90.00
mm (thick) cut-out of rubber fillter board of similar
material including 5 per cent wastage
Basic rate for 75 Cum
(d) Form work @ 3% on (a+b+c)
Overheads & Contractors [email protected]%
Rate per 75 cum
Rate per 1 cum
RBR-SBBS-11 4 Wet Mix Macadam
Providing, laying, spreading and compacting graded
stone aggregate to wet mix macadam specification
including premixing the material with water at OMC in
mechanical mixer (Pug Mill), carriage of mixed material
by tipper to site, laying in uniform layers in sub-
base/base course on a well prepared sub-base and
compacting with smooth wheel roller of 80 to 100kN /
Vibratory Roller 80-100 kN weight to achieve the
desired density including lighting, barricading and
maintenance of diversion, etc as per Tables 400.11 &
400.12 and Technical Specification Clause 406 MORD /
MORTH.
c) Material
Coarse aggregate 45 mm to 22.4 mm @ 30 per cent cum 39.90
Aggregates 22.4 mm to 2.36 mm @ 40 per cent cum 53.20
Fine aggregate / Crushed sand 2.36 mm to 75 micron cum 39.90
@ 30 per cent
Fine aggregate 10 mm cum
Coarse Sand cum
Borrow area sand cum
Water kl 8.00
d&e) Overheads & Contractors [email protected]%
Cost for 100 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/100
Cost for 100 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/100
RBR-FNDN-2 2 Filling in foundation trenches as per drawing and technical specification Clause
Sand filling
Unit = cum
a) Labour
Mate day 0.00
Mazdoor (Unskilled) day 0.31
Add MA@25%
b) Material
Sand cum 1.05
Sienorage charges for sand cum 1.05
Overheads & Contractors [email protected]%
Rate per cum = a+b+c+d
BLD-CSTN-2-5 3 Plain Cement concrete (1:4:8) using 40 mm metal with Concrete mixture. All work
upto plinth level.
Unit = 1cum
A. MATERIALS:
Cement kg 162.00
Coarse aggregate 40 mm cum 0.90
Fine aggregate (Sand) cum 0.45
Seigniorage charges for C.A cum 0.90
Seigniorage charges for F.A cum 0.45
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour 1.00
C. LABOUR:
Mason 1st class day 0.10
Mazdoor (unskilled) day 1.39
Water Charges 1% of Labour
Add MA@25%
Overheads & Contractors [email protected]%
Rate per cum
By Manual Means
Unit = cum
Taking output = 360 cum
a) Labour
Mate day -
Mazdoor (Skilled) day 12.08
Mazdoor (Unskilled) day 250.00
Add MA@25%
b) Machinery
Three wheel 80-100 kN static roller @ 10 cum per hour hour 36.00
for Rural Area works
Water tanker 6 kl capacity hour 24.00
c) Material (Refer Tables 400.7, 8, 9 & 10 MORD/
400.6, 7, 8 & 9 MORTH)
Aggregate
Grading 3 53 mm to 22.4 mm @ 0.91 cum per 10 sqm cum 435.60
for compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for Grading 3 @ 0.18 cum per 10sqm cum 86.40
Binding Material
Binding Material @ 0.06 cum per 10 sqm for Grading cum 28.80
2 material
Water kl 144.00
d&e) Overheads & Contractors Profit@14%
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040
Add MA@25%
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400
Air compressor 210 cfm hour 1.400
Bitumen emulsion pressure distributor @ 1750 hour 1.000
sqm/hour
Water tanker 6 kl capacity 1 trip per hour hour 0.500
c) Material
Bitumen emulsion (SS-1) @ 0.85 kg per sqm t 1.480
Water kl 3.000
d&e) Overheads & Contractors Profit
Cost of 1750 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/1750
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040
Add MA@25%
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400
Air compressor 210 cfm hour 1.400
Emulsion pressure distributor @1750 sqm per hour hour 1.000
c) Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm t 0.480
d&e) Overheads & Contractors Profit
Cost of 1750 sqm = (a+b+c+d+e)
Rate per sqm = a+b+c+d+e/1750
By Mechanical Means
Type A
Bitumen (S-65)
Unit = sqm
Taking output = 8200 sqm (205 cum)
a) Labour
Mate day 0.840
Mazdoor (Unskilled) day 14.000
Add MA@25%
b) Machinery
HMP not less than 40 to 60 TPH capacity hour 12.000
Electric generator set 250 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Paver finisher 100 TPH capacity hour 4.800
Three wheel 80-100 kN static roller hour 6.000
c) Material
Bitumen (S-65) @ 23.75 kg per 10 sqm t 19.480
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.40 cum 276.750
cum per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 8200 sqm = a+b+c+d+e
Cost of 1sqm =
RBR-MTRD-4
7 Filling Pot-holes and Patch Repairs with open-
Graded Premix surfacing, 20mm.
Removal of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of
surface, painting of tack coat on the sides and base of
excavation as per clause 503, back filling the pot holes
with hot bituminous material as per clause 511,
compacting, trimming and finishing the surface to form
a smooth continuous surface, all as per clause 3004.2
MORTH
Unit = Sqm
Taking out put = 10250 sqm (205 cum)(405 tonne)
a) Labour
Mate Day -
Mazdoor (Unskilled) Day 90.000
Mazdoor skilled Day 7.760
Add MA@25%
b) Machinery
Air compressor 250 cfm hour 6.000
HMP 100-110 TPH Capacity hour 6.000
Tipper 5.5 tonnes capacity hour 90.000
Smooth wheeled roller 8-10 tonnes hour 12.000
c) Material
Crushed stone aggregates nominal size 13.2mm cum 184.500
Crushed stone aggregates nominal size 11.2mm cum 92.250
Bitumen VG 30 tonn 14.970
e
Bitumen emulsion for tack coat including vertical sides tonn 2.460
of pot hole. e
d&e) Overheads & Contractors Profit
Cost for 10250 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/10250
CD WORK DATAS:-
Ordinary soil
Upto 3 m. depth
Unit = cum
Taking outpuot = 10 cum
Labour
Mate day ---
Mazdoor unskilled day 3.64
Add MBA@20%
Add sienorage charges
Over head charges & contracots profit @ 14%
cost for 10 cum = a+b+c
Rate per cum = (a+b+c)/10
285.00 684.00
250.00 2000.00
671.00
2797.00 16782.00
920.60 27618.00
367.00 4404.00
372.00 1116.00
345.72 88158.42
873.35 112662.26
35573.40
289669.08
965.56
285.00 3442.80
250.00 62500.00
16485.70
920.60 33141.60
372.00 8928.00
1259.34 548570.59
1153.15 99632.16
966.73 27841.87
112075.98
912618.70
2535.05
250.00 77.50
19.38
966.73 966.73
40.00 40.00
148.91
1252.52
250.00 77.50
19.38
345.72 345.72
22.00 22.00
65.04
529.64
315.00 1575.00
285.00 1425.00
250.00 37500.00
250.00 1500.00
250.00 1500.00
10875.00
370.00 13320.00
40.00 360.00
42.00 378.00
372.00 1860.00
1890.48 84220.95
1517.98 34837.68
960.35 32411.84
4500.00 135000.00
15.00 6187.50
36.00 684.00
5.00 450.00
9.00 810.00
364894.97
10946.85
51085.30
426927.11
5692.36
285.00 2280.00
285.00 684.00
741.00
1431.00 5724.00
1431.00 5724.00
818.30 4091.50
2797.00 5594.00
372.00 494.76
920.60 5753.75
1766.69 70490.93
1495.52 79561.66
1122.06 44770.26
31627.38
257537.24
2575.37
technical specifications
er 302.2.1(a) of MORD
285.00 0.00
250.00 910.00
227.50
220.00
159.25
1516.75
151.68
al specification Clause
285.00 0.00
250.00 77.50
19.38
873.35 917.02
40.00 42.00
141.95
1197.85
4.50 729.00
1434.88 1291.39
960.35 432.16
50.00 45.00
40.00 18.00
370.00 370.00
315.00 31.50
250.00 347.50
3.79
95.70
457.57
3821.61
4500.00 1237.50
960.35 460.97
1434.88 688.74
1890.48 453.72
1517.98 121.44
315.00 31.50
250.00 347.50
94.75
370.00 148.00
358.41
551.95
4494.49
4.50 1296.00
960.35 1008.37
40.00 42.00
250.00 50.00
12.50
337.24
2746.11
2746.11 411.92
315.00 189.00
250.00 240.00
107.25
0.00 0.00
132.74
1080.91
108.09
1890.48 1701.43
960.35 432.16
50.00 45.00
40.00 18.00
4.50 1800.00
315.00 21.11
285.00 37.91
250.00 625.00
171.01
370.00 98.79
693.06
5643.47
2535.05 35642.80
17821.40
53464.20
285.14
285.00 3442.80
250.00 62500.00
16485.70
920.60 33141.60
372.00 8928.00
1435.49 625299.87
1153.15 99632.16
966.73 27841.87
0.00 0.00
122818.08
1000090.08
2778.03
2778.03 39059.10
19529.55
58588.65
312.47
250.00 260.00
65.00
310.00 434.00
402.00 562.80
748.00 748.00
372.00 186.00
27679.44 40965.57
0.00 0.00
6050.99
49272.36
28.16
250.00 260.00
65.00
310.00 434.00
402.00 562.80
748.00 748.00
28388.84 13626.65
2197.50
17893.95
10.23
285.00 239.40
250.00 3500.00
875.00
16626.00 199512.00
1609.00 9654.00
1431.00 8586.00
1183.00 5678.40
920.60 5523.60
37016.11 721073.86
1376.35 380904.86
186943.08
1522250.80
185.64
250.00 22500.00
285.00 2211.60
6177.90
402.00 2412.00
21018.00 126108.00
818.30 73647.00
920.60 11047.20
1683.31 310570.99
1507.11 139031.04
37016.11 554131.20
28388.84 69836.56
184474.29
1502147.78
146.55
0.00
250.00 910.00
182.00
200.00
180.88
1472.88
147.29
250.00 77.50
15.50
873.35 873.35
135.29
1101.64
4,500.00 990.00
960.35 432.16
1,434.88 1,291.40
0.00
315.00 31.50
250.00 347.50
75.80
370.00 148.00
132.65
464.30
3,913.31
3913.31
4,500.00 1,237.50
960.35 460.97
1,434.88 688.75
1,890.48 453.72
1,517.98 121.44
0.00
315.00 31.50
250.00 347.50
75.80
372.00 148.80
356.60
549.17
4471.75
4471.75
Est.Cost.Rs.10.00 lakhs
Loading& Machine
Sl Name of the Lead in Conveyance Blasting Seinorage Total
Description in Material Initial Unloadin Crushing Unit
No. Quarry Km charges Charges charges Amount
g charges Charges
1 2 3 4 5 6 7 8 9 10 11
1 Gravel Gopalapuram 15.00 88.00 54.04 0.00 0.00 40.00 345.72 1.0 Cum
163.68
2 Sand for filling Vadapalli 57.00 531.32 248.00 54.04 0.00 0.00 40.00 873.35 1.0 Cum
60-63mm HBG metal 59.00 WBM Gr-
3 I.Pangidi 378.00 109.10 70.00 0.00 50.00 1154.73 1.0 Cum 1259.34
IRC, MORTH & MORD 547.63 II
50 -55mm HBG Metal 59.00 WBM Gr-
4 I.Pangidi 410.00 109.10 70.00 0.00 50.00 1186.73 1.0 Cum 1435.49
IRC, MORTH & MORD 547.63 III
40-45mm HBG M/c Metal 59.00
5 I.Pangidi 530.00 109.10 70.00 130.33 50.00 1437.06 1.0 Cum 1428.36 1766.69
IRC, MORTH & MORD 547.63
40-45mm HBG Metal 59.00
6 I.Pangidi 530.00 109.10 70.00 0.00 50.00 1306.73 1.0 Cum
IRC, MORTH & MORD 547.63
25-27mm M/c HBG Metal 59.00
7 I.Pangidi 874.00 109.10 70.00 216.33 50.00 1867.06 1.0 Cum 1858.36 1495.52
IRC, MORTH & MORD 547.63
19 - 22mm HBG M/c metal 59.00
8 I.Pangidi 998.00 109.10 70.00 247.33 50.00 2022.06 1.0 Cum 2013.36
IRC, MORTH & MORD 547.63
12-14 mm HBG M/c Metal 59.00
9 I.Pangidi 727.00 109.10 70.00 179.58 50.00 1683.31 1.0 Cum 1674.61 1512.8949122807
IRC, MORTH & MORD 547.63
9.5-11.2 mm HBG M/c Metal 59.00
10 I.Pangidi 593.00 109.10 70.00 146.08 50.00 1515.81 1.0 Cum 1507.11 1418.9865789474
IRC, MORTH & MORD 547.63
5-7 mm HBG M/c Metal 59.00
11 I.Pangidi 452.00 109.10 70.00 110.83 50.00 1339.56 1.0 Cum 1330.86
IRC, MORTH & MORD 547.63
12 Sand for Mortor Vadapalli 57.00 531.32 335.00 54.04 0.00 0.00 40.00 960.35 1.0 Cum 1153.15 Type B screenings
40 mmHBG M/c Metal-SS5 59.00
13 I.Pangidi 530.00 109.10 70.00 128.15 50.00 1434.88 1.0 Cum 960.35 Type B
547.63
20 mm HBG M/c Metal -SS5 59.00
14 I.Pangidi 891.00 109.10 70.00 222.75 50.00 1890.48 1.0 Cum 1376.35 MSS
547.63
10 mm HBG M/c Metal-SS5 59.00
15 I.Pangidi 547.63 593.00 109.10 70.00 148.25 50.00 1517.98 1.0 Cum
2.36 mm Below Metal(Stone 59.00
16 dust) I.Pangidi 260.00 109.10 0.00 0.00 50.00 966.73 1.0 Cum
547.63
17 Emulsion (SS-1) Visakhapatnam 324.00 1134.00 26545.44 0.00 0.00 0.00 0.00 27679.44 1.0 MT
Loading& Machine
Sl Name of the Lead in Conveyance Blasting Seinorage Total
Description in Material Initial Unloadin Crushing Unit
No. Quarry Km charges Charges charges Amount
g charges Charges
10 Emulsion (RS-1) Visakhapatnam 324.00 1134.00 27254.84 0.00 0.00 0.00 0.00 28388.84 1.0 MT
11 Bitumen VG-30 grade Visakhapatnam 324.00 1134.00 35882.11 0.00 0.00 0.00 0.00 37016.11 1.0 MT
12 600mm Dia NP3 Class Kalaparru 12.00 97.57 2312.90 0.00 0.00 0.00 0.00 2410.47 Rm
13 600mm Dia Collar Kalaparru 12.00 0.00 412.20 0.00 0.00 0.00 0.00 412.20 Each
2.36 - 5 mmHBG M/c Metal 59.00
17 I.Pangidi 278.00 109.10 70.00 67.33 50.00 1122.06 1.0 Cum 1113.36
IRC, MORTH & MORD 547.63
18 Steel 45000.00 0 45000.00 1.0 MT
19 Cement 4500.00 0 4500.00 1.0 MT
1.Certified that the above leads are correct to the best of my knowledge
2.The above work spot lies within 12 Km from Muncipal Corporation Boundary
WMM
ogpc
1427.6865789474
Type B screenings
Sand