TBT 066 17 Proposal Offer
TBT 066 17 Proposal Offer
TBT 066 17 Proposal Offer
Proposal Offer
Head Office Our Ref.: TBT-66-17
404, 4th Floor, Revision: “00”
Bank & Business Centre Dated : 21-July-17
Block7/8, K.C.H.S. Karachi, Pakistan. Page No.: Page 1 of 15
Tel: + (92-21) 31-111-111-828
Proposal: TBT-066-17
Creating Possibilities...
Submitted to:
Mr. Kamran
Mr. Kamran
NLC
Karachi.
Ref No. TBT-066-17-0 Building: 01, Rev = 00 Dated: July 21, 2017
Dear Sir,
We thank you for giving us the opportunity to submit a proposal offer for the
subject project.
The Building Technique's proposal offer is based on the building data and/or
the Consultant Drawings provided to us by you and is in accordance with
our standard design practices, standard material specifications and
standard terms & conditions of Supply and Erection. However, the overall
requirements are as per the subject project. If we have made any
assumptions, deviations, omissions or exclusions from your requirements
they will be described in this proposal offer.
Sincerely Yours,
Arif Taj
General Manager
M: 92-321-825 1110
E-mail: [email protected]
The Building Techniques (Pvt.) LtD. Proposal Offer
Head Office Our Ref.: TBT-66-17
404, 4th Floor, Revision: “00”
Bank & Business Centre Dated : 21-July-17
Block7/8, K.C.H.S. Karachi, Pakistan. Page No.: Page 3 of 15
Tel: + (92-21) 31-111-111-828
TABLE OF CONTENTS
Executive Summary
Respected Sir,
1. This quotation is based on assumption that client has both NTN &
STRN. In case otherwise in the absence of both or any one of it,
quotation will revise accordingly.
2. All above mentioned points are integral part of "Section 10" of this
quotation.
Exclusions:
You are requested to thoroughly review our proposal and give us your
feedback in order to minimize noncompliance (if any) with your
requirements.
Sincerely Yours,
Arif Taj
General Manager
M: 92-321-825 1110
E-mail: [email protected]
The Building Techniques (Pvt.) LtD. Proposal Offer
Head Office Our Ref.: TBT-66-17
404, 4th Floor, Revision: “00”
Bank & Business Centre Dated : 21-July-17
Block7/8, K.C.H.S. Karachi, Pakistan. Page No.: Page 5 of 15
Tel: + (92-21) 31-111-111-828
ROOF PANELS
Single Profile & Thickness Profile: M35–200. Thickness (mm) : 0.5
WALL PANELS
Single Profile & Thickness Profile: M35–200. Thickness (mm) : 0.5
Skin Material AluZinc Coated Steel
Panels Finish & Color Finish: Polyester Painted. Color: TBT Standard
The Building Techniques (Pvt.) LtD. Proposal Offer
Head Office Our Ref.: TBT-66-17
404, 4th Floor, Revision: “00”
Bank & Business Centre Dated : 21-July-17
Block7/8, K.C.H.S. Karachi, Pakistan. Page No.: Page 7 of 15
Tel: + (92-21) 31-111-111-828
All buildings included in this proposal are designed in accordance with the following codes:
Loads applied on buildings and tolerances for fabrication and erection are in accordance with:
Hot rolled sections and built up sections are designed in accordance with:
Welding and its inspection / testing for Steel Structure Fabrication will be in accordance with:
The latest Edition of Structural Welding Code - Steel (AWS D1.1: 2008)
By American Welding Society (AWS)
550 NW Lejeune Road, Miami, FL 33126, USA
The Building Techniques (Pvt.) LtD. Proposal Offer
Head Office Our Ref.: TBT-66-17
404, 4th Floor, Revision: “00”
Bank & Business Centre Dated : 21-July-17
Block7/8, K.C.H.S. Karachi, Pakistan. Page No.: Page 8 of 15
Tel: + (92-21) 31-111-111-828
The following is the list of the material standards and specifications for which the building components
have been designed:
Below are TBT’s standard material specifications that will be used in the project. TBT reserves the
right to make material substitutions and changes in specifications as and when deemed necessary.
No. Materials Specifications
X-Bracing Members
The Building Techniques reserves the right to substitute partly or entirely, some of the materials in
case Of material non-availability or supply shortages.
1. Galvanized anchor bolts for rigid frames, end wall posts & framed wall openings
2. Eave gutters & downspouts on sidewalls or curved eaves at sidewalls with projection.
3. All necessary flashing & trims
4. Foam closures
5. Bead mastic for panel end-lap
6. Connection bolts
7. Sheeting fasteners
The Building Techniques (Pvt.) LtD. Proposal Offer
Head Office Our Ref.: TBT-66-17
404, 4th Floor, Revision: “00”
Bank & Business Centre Dated : 21-July-17
Block7/8, K.C.H.S. Karachi, Pakistan. Page No.: Page 9 of 15
Tel: + (92-21) 31-111-111-828
1) Primary Steel
All primary steel members will be cleaned and painted at our factory with one coat of epoxy
based primer.
2) Secondary Steel
All secondary steel members such as purlins, girts, eave struts, gable angles and base angles
are made of Pre-galvanized steel coils. Choice of material will depend on availability.
3) Panel Colors
Panel colors will be as per the latest TBT standard. Other colors may be accommodated on
Buyer’s request, where extra charges and delivery time may apply.
Any change and/or revision to the above stated scope of supply may lead to variation in the
price and the delivery period. A change must not hold payment for work completed in the
original contract.
A detailed Change Order Contract will be signed by both parties mentioning summary of
changes in technical, financial and delivery commitments.
TBT reserves the right to change any of its product design or details, in the process of
continued enhancement.
TBT shall be compensated for any change in building parameters and extra works.
Material will be dispatched at the end of 10 weeks from TBT’s factory (or as agreed by both
parties) from the Dispatch Trigger Date (DTD), which is the date of receipt and acceptance of
the following at The Building Technique (Pvt.) Ltd. It can be the same for all buildings in this job
or different for each building in this project.
a. Signed contract (All pages and hand written notes to be initialed by both parties.)
b. Down payment
c. Final change order
d. Signed final "approved as noted" or approved as in Approval Drawings
Please allow a minimum of 1-2 weeks for Approval Drawings submittal.
Buyer must return approval drawings to TBT's Head Office within 2 weeks of receipt. Any
delay may result in a change to our delivery commitment.
The Building Techniques (Pvt.) LtD. Proposal Offer
Head Office Our Ref.: TBT-66-17
404, 4th Floor, Revision: “00”
Bank & Business Centre Dated : 21-July-17
Block7/8, K.C.H.S. Karachi, Pakistan. Page No.: Page 10 of 15
Tel: + (92-21) 31-111-111-828
8.1 This proposal is valid for 14 days from the above noted date. Any extension of validity by
TBT must be in writing.
8.2 If the job (project) is not “Released for Production” within 20 days from the date of entering
into Contract, it will be subject to delivery change and price change in accordance with the
prevailing delivery schedules and prices at the end of the above noted period. “Released
for Production” means that the Approval Drawings have been returned by the buyer
“Approved as Noted” or “Approved as Is”, the agreed upon payment terms, as per Section
12, have been fulfilled by the buyer and the job has been released for final engineering
production and fabrication at TBT.
8.3 That portion of this order that is not released for production as per section 8.2 and not
shipped within the maximum committed delivery period as per section 7.1 of this proposal
will be subject to a price change in accordance with the prevailing prices posted at the end
of the above noted time period. However, if that portion is not shipped due to any issue at
TBT’s end, no price implication will be applied.
The Building Techniques (Pvt.) LtD. Proposal Offer
Head Office Our Ref.: TBT-66-17
404, 4th Floor, Revision: “00”
Bank & Business Centre Dated : 21-July-17
Block7/8, K.C.H.S. Karachi, Pakistan. Page No.: Page 11 of 15
Tel: + (92-21) 31-111-111-828
The Building Techniques has attempted to incorporate all your scope & technical requirements as
obtained from you or from the Consultant Drawings. If we have made any assumptions, deviated
from your exact requirements or excluded any item from our supply, we should have noted them in
this section. Please help us by reading this proposal thoroughly and giving us your feedback to
ensure that we have not overlooked anything.
9.1 General
i. This proposal includes only the area defined in this document and shown in drawings.
Please read carefully the sections 1 to 5 for the building parameters, accessories, design
loads and materials used in this offer. It has been attempted to keep these sections as per
Buyer requirements, however any special requirement of Buyer mentioned in Request for
Quotation (RFQ) but not mentioned in this document is not included in this offer.
ii. Detailed Fabrication drawings preparation, manufacturing and supply will be initiated only
after receipt of complete approval package duly approved by Buyer or his consultant.
iii. Both parties agreed that the price quoted in this quotation is based on a lump sum basis
calculated according to the building descriptions as well as the required loading and codes
shown above and not as a re-measurable basis. Hence, the project weight given at the
quotation stage is only indicative and no claim will be entertained in case of a reduction or
addition in the building weight after the final design or the shipment. However, should there
be any revision to the scope of the work after signing of the contract which may result in an
increase or decrease in the contract value, then it is subject for a ‘contract change order’ as
per Section 9 (amendment to the contract value) reciprocally agreed by TBT & the Buyer.
9.2 Exclusions
The following are always excluded from our scope as a general practice.
This offer does not include any structural designing, testing and / or demolishing of existing
structure, execution and / or supervision of civil works to be executed at site.
TBT is responsible for supplying Anchor Bolts and not for their grouting in civil foundation and
supervision.
TBT is not liable for any signs of rust, color fading or dirt stains that might appear on the steel
during long storage (exceeding two weeks), because of the buyer, on site / at factory.
Any additional charges to hold the shipment at TBT premises for more than 15 days, partial
shipment, idol labor etc. due to delay in payment from the Buyer or as per the request of the
Buyer, shall be paid by the Buyer.
The Buyer shall provide authorized access (gate pass) to site for TBT and /or its erection team.
The Buyer shall maintain clear and uninterrupted access to the site and building area for the
vehicles and equipment of the erection team all the time during the execution period.
The Buyer shall insure continuous uninterrupted work to maintain proper sequence of erection.
The Buyer shall provide the erection team the building foot print and a 10-meter-wide perimeter
leveled and compacted for free maneuverability of equipment vehicles and/or scaffoldings.
Failure to do so can result in Price impact.
The Buyer shall provide a lay down area for storing and offloading material necessary for the
erection activities within the building foot print plus 10m wide perimeter around the building.
The Buyer shall provide domestic water and power supply for the temporary offices and
buildings, and the required water for water test (including tools and equipment).
Health & Safety considerations will be as per our Standards. For any special requirements
regarding Health & Safety, our quote will be revised.
In case of PEB structure resting on / connected to / leaned to a pre-existing structure, TBT is
not liable for the structural stability and integrity of that pre-existing structure/building.
All arrangements for boarding, lodging etc. of the installation team shall be arranged by the
buyer free of cost.
The buyer shall be responsible for the safety and security of our equipment and staff onsite. An
undertaking from the Buyer shall be requested if needed.
If contract is cancelled at any stage, for any reason, Buyer agrees to pay TBT a cancellation fee of
15 % of contract price or actual costs incurred up to time of cancellation, whichever is higher.
TBT is not liable for delays or failure to perform its obligations if Force Majeure conditions
prevail
Upon completing execution, the Buyer shall issue an “Erection Completion Certificate”.
The Building Techniques (Pvt.) LtD. Proposal Offer
Head Office Our Ref.: TBT-66-17
404, 4th Floor, Revision: “00”
Bank & Business Centre Dated : 21-July-17
Block7/8, K.C.H.S. Karachi, Pakistan. Page No.: Page 13 of 15
Tel: + (92-21) 31-111-111-828
Payment Terms
This agreement shall be governed by, and construed in accordance with the Laws of the
Islamic Republic of Pakistan.
Any dispute arising hereunder or from or in connection herewith shall be resolved amicably
by discussion between the parties hereto, failing which the parties shall submit the matter in
dispute to be finally settled pursuant to the Pakistani Arbitration Regulations. The arbitration
shall take place in Karachi, Pakistan.
The Building Techniques (Pvt.) LtD. Proposal Offer
Head Office Our Ref.: TBT-66-17
404, 4th Floor, Revision: “00”
Bank & Business Centre Dated : 21-July-17
Block7/8, K.C.H.S. Karachi, Pakistan. Page No.: Page 15 of 15
Tel: + (92-21) 31-111-111-828
Represented by the following person who is Represented by the following person who is
duly authorized to enter into this contract. duly authorized to enter into this contract.
______________________________________ ______________________________________
Name & Position Name & Position
______________________________________ ______________________________________
Signature & Date Signature & Date
______________________________________ ______________________________________
Company Stamp Company Stamp
CONTRACT SCOPE: Supply and Erection of Pre Engineered Buildings as described in contract documents.
IN WITNESS HEREOF, the authorized parties hereto have executed this Contract.