Left Side Elevation: Ground Floor Plan

po;o

Uploaded by

Sooraj Vs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views1 page

Left Side Elevation: Ground Floor Plan

po;o

Uploaded by

Sooraj Vs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTES

THIS DRAWING IS THE COPYRIGHT OF AL JAWAHER ENGINEERING


CONSULTANCIES AND MUST NOT BE RETAINED, COPIED OR USED
WITHOUT AUTHORITY APPROVAL.

LEFT SIDE ELEVATION DO NOT SCALE FROM THIS DRAWING.

ALL DIMENSIONS SHALL BE VERIFIED ON SITE AND APPROVED BY


THE ENGINEER.

ALL DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE INDICATED


1 2 3 4 5 6 7 8 9 ALL LEVEL DIMENSIONS ARE IN METERS UNLESS OTHERWISE
INDICATED.

ALL TOILETS / BATHROOMS / STORE ROOMS / KITCHENS / PANTRIES /


BASEMENT (WHERE APPLICABLE) ARE MECHANICALLY VENTILATED
7.14 7.30 7.34 7.52 7.12 7.29 7.35 7.34 VIA WALL / ROOF EXTRACT FANS AS PER 'ASHRAE ' STANDARDS;
REFER TO MECHANICALDRAWINGS FOR DETAILS.
250 MM THK. THERMAL INSULATED BLOCK 250 MM THK. THERMAL INSULATED BLOCK 250 MM THK. THERMAL INSULATED BLOCK 250 MM THK. THERMAL INSULATED BLOCK
WALL UPTO 2.10 MT HEIGHT AND WALL UPTO 4.60 MT HEIGHT AND WALL UPTO 2.10 MT HEIGHT AND MINIMUM 2 % SLOPE TO ALL GARGOYLES AND ROOF OUTLETS AS
WALL UPTO 4.60 MT HEIGHT AND
INDICATED ON THE ROOF PLAN.
INSULATED SHEETING ABOVE THAT INSULATED SHEETING ABOVE THAT +0.30 m lvl. = ±0.00 INSULATED SHEETING ABOVE THAT INSULATED SHEETING ABOVE THAT
+0.30 m lvl.
2.77 Water " V1",
DN15 / 10 l/min.
h-0,600
3´230V/Σ-1, 5kW
h-1,20m
THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER
V1 V1
230V/1 ,5kW
h-0,60m
Ner. plieno kriauklė VEHICLE CHARGE
2´400V/Σ-5, 0kW
(16A) h-1,20m
1´600l/min.
2´/Σ-600l/min.
∅15, 6-8Bar
h-1,40m (Class.4.4.3)
2´230V/Σ- 3,0kW
h-1,20m
W5
2´/Σ-600l/min.
∅15, 6-8Bar
h-1,40m (Class.4.4.3)
2´230V/Σ-3, 0kW
h-1,20m
V1 V1 V1 V1 RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL,
RUD
400V/8, 3kW
(sustiprintos 2´400V/Σ- 5,0kW ∅15, 6-8Bar 2´400V/Σ- 5, 0kW 400V/3, 0kW 2´400V/Σ- 5,0kW
(16A) h-1,60m
konstrukcijos) h-1,40m (Class.4.4.3)

ELECTRICAL AND PLUMBINGDRAWINGS, AND ALL RELEVANT


(16A) h-1,20m (16A) h-1,20m h-0,60m (16A) h-1,20m

A 2.38 100 MM THK. BLOCK M K -T K-T

M K-T
M K-T

1.20 1.20 1.20 1.29

∅ 25

∅ 15
1 2 3

i=1%
SECTIONS OF THE SPECIFICATIONS.

A6
RJ 45 RJ 45

2 2 2 2

1.20 8.46

25l/min.
>2,5 Bar

10l/min.

A2

A2
RJ 45 RJ 45

1.27
0.99

WALL UPTO 3.60 MT HEIGHT i=1% i=1%

500lx
3.20 3.20 3.20 ENTRY 2.00

1.40

1.56

1.56

1.56

1.56
Vandens įvadas " V1",

3.20 DN25 / 25 l/min. zone 0,8 ´3,2m

1.94

1.94

i=1%
2.04
h-1,600

PANTRY T-OUT.1
L1 -125 m³/h
EXTRACTOR WC WC SHW
(Out )
7.29

2.86
2.12 6.30
1.80 4.00 D4 D4 D4 D4 LEGEND
250 MM THK. THERMAL INSULATED BLOCK D4 D4 500lx 500lx 1500lx 1500lx
zone 3,2 ´6,2m zone 3,2´ 6,2m zone 3,2´ 6,2m zone 3,2 ´6,2m
D4 D4 LOCKER
WALL UPTO ROOF 100 MM THK. BLOCK D1

DRIVE WAY
Atitvara
W2 WALL UPTO 3.60 MT HEIGHT iki h-2,50m
∅100 ∅100
D4 FFL FINISHED FLOOR LEVEL W.M WASHING MACHINE
6.61

-0,20 2´230V/Σ- 1,5kW


h-1,20m (from the top)
7.02

7.00
400V/ 3,0kW
h-1,60m (from the top)

FGL FINISHED GROUND LEVEL D.W DISHWASHER


RJ 45

2
K -T M

200 MM THK. SOLID


1´400l/min.
∅15, 6-8Bar 2´230V/Σ- 1, 5kW

i=1%

i=1%

i=1%

i=1%
A6

SERVICE RECEPTION
h-1,40m (Class.4.4.3) h-1,20m (from the top) 400V/3, 0kW

1.15
h-1,60m (from the top)

Waste /
i=1% i=1% i=1% i=1% i=1% i=1% i=1% i=1%
A1 RJ 45

6.20

6.20

6.20

6.20

6.20
2
1´600l/min. K-T M 2´230V/Σ- 1, 5kW
∅15, 6-8Bar h-1,20m (from the top)

FSL FINISHED SLAB LEVEL F FRIDGE

i=1%

i=1%

i=1%

i=1%
VN -3/8", 175 Bar,
25 l/min.
Liquids h-1,40m (Class.4.4.3)
A6 2

BLOCK WALL UPTO 250 MM THK. THERMAL INSULATED BLOCK

K-T
-0,11 -0,11 -0,11 -0,11

RJ 45
PAINT BOOTH
1´600l/min.

1,4´5,5m ∅15, 6-8Bar

MANAGER CABIN
A6
h-1,40m (Class.4.4.3)
1´600l/min.

4.60 MT. HT.

3.27
SSL STRUCTURAL SLAB LEVEL GD GLAZED DOOR
∅15, 6-8Bar
FG3
WALL UPTO 2.10 MT HEIGHT AND
h-1,40m (Class.4.4.3)

3,5t

5,0t
FG4
9.45 i=3%
INSULATED SHEETING ABOVE THAT GL GROUND LEVEL LD LOUVRE DOOR
4.69
FG1 FG1 WIC WALK IN CLOSET SD SLIDING DOOR
D1
1

WR WARDROBE MD METAL DOOR


B 0.10
230V/3, 0kW
h-1,60m

T-OUT.1
L2 -400 m³/h
(Out )
T-OUT.1
L2 -400 m³/h
(Out )
T-OUT.1
L2-400 m³/h
(Out )
T-OUT.1
L2 -400 m³/h
(Out ) FT FLOOR TRAP AD ALUMINIUM DOOR
3.40 BD BALCONY DRAIN LP LOUVRE PANEL
1000 MM HT. SILL LVL. 100 MM THK. BLOCK 200 MM THK. SOLID BLOCK
ROLL UP SHUTTER

RWO RAIN WATER OUTLET CL CENTER LINE


7.15

7.15

WALL UPTO 3.60 MT HEIGHT WALL UPTO 2.10 MT HEIGHT AND

ENTRY
WORKSHOP INSULATED SHEETING ABOVE THAT TOP TOP OF PARAPET DB DISTRIBUTION BOARD
+0.45 m lvl.
EXIT

STORAGE RUD SH SHOWER GW GLAZED WINDOW


6.00

6.00
3.5000 +0.60 m lvl. 9.89

3.90

3.50
aluminium panel DRIVE WAY DRIVE WAY PUMP RM W.H WATER HEATER CW CURTAIN WALL
23.5400 GATE BARRIER from asphalt road
cladding to detail

17.08
3.00
4.15

T-OUT.1 T-OUT.1 T-OUT.1

3.20 L2 -400 m³/h


3.20 L2-400 m³/h
3.20 L2-400 m³/h
T-OUT.1
L2 -400 m³/h
(Out ) (Out ) (Out )

2´230V/Σ- 1,5kW
h-1,20m (from the top)
(Out )
3.20 T-OUT.1
L2 -400 m³/h
(Out )
T-OUT.1
L2-400 m³/h
(Out ) KEY PLAN
A6

C
2
3,5t

3,5t

3,5t

3,5t
5,0t
5,0t Polishing
2
2

-0,11 -0,11 2´230V/Σ- 1,5 kW -0,11 -0,11 2´230V/Σ- 1,5 kW RJ 45

-0,11 -0,11
h-2,00m (from the top)
RJ 45

K-T

2 h-2,00m (from the top) K -T


i=0,5%

2´230V/Σ-1, 5kW
h-2,00m (from the top)
RJ 45

K -T
2
RJ 45

K -T
2´230V/Σ- 1,5 kW
h-2,00m (from the top)
2
RJ 45

K-T
2´230V/Σ- 1,5kW
h-2,00m (from the top)
2
RJ 45

K-T
2´230V/Σ- 1,5kW
h-2,00m (from the top) 1´600l/min.
PREPARATION AREA PAINT MIX +0.30 m lvl. = ±0.00
i=1%

i=1%

i=1%

i=1%

i=1%

i=1%

2´230V/Σ- 1,5 kW 2´230V/Σ- 1,5kW 2´230V/Σ- 1,5kW ∅15, 6-8Bar


h-2,00m (from the top) h-2,00m (from the top) h-2,00m (from the top) h-1,40m (Class.4.4.3)
i=1% i=1% i=1% i=1% i=1% i=1% i=1% i=1% i=1% i=1% i=1% i=1% 1´600l/min.
∅15, 6-8Bar

6.20
h-1,40m (Class.4.4.3)

UP
i=1%

i=1%

i=1%

i=1%

i=1%

i=1%

K-T
RJ 45
2 A6
i=0,5% i=0,5%

6.82

6.72
K-T
M 2 RJ 45

2´230V/Σ-1, 5kW
6.01

A6
h-1,20m (from the top)

∅100 ∅100 ∅100


i=0,5%

K-T
M 2
400V/ 3, 0kW RJ 45

W2 h-1,60m (from the top)


2´230V/Σ- 1,5kW
h-1,20m (from the top)
2´230V/Σ-1, 5kW
h-1,20m (from the top)
600lx 600lx 600lx -0,25
∅100

∅100

∅100

400V/ 3,0kW
h-1,60m (from the top)
zone 3,2 ´6,2m zone 3,2´ 6,2m zone 3,2´ 6,2m

500lx 500lx 17.02


500lx 400V/3 ,0kW
zone 3,2´ 6,2m zone 3,2´6,2m

zone 3,2 ´6,2m h-1,60m (from the top)

∅ M
A5
2.67
10

2´/Σ-600l/min.
0

A4
∅15, 6-8Bar
h-1,40m (Class.4.4.3) 3 2

3.2000 2´/Σ-600l/min.
∅20, 6-8Bar

10 l/min.

A4
h-1,40m (Class.4.4.3)
A2

A6

A6

A4
D
RJ 45 RJ 45 RJ 45 RJ 45
3 2

∅15
2 2 3 2 3 2
M K-T K-T K-T M K-T 2´400V/Σ- 5,0 kW
(16A) h-1,20m

3´230V/Σ- 2,0 kW
2´/Σ-600l/min.
1´600l/min. Ner. plieno kriauklė 2´/ Σ-600l/min. ALD2 ∅20, 6-8Bar
h-1,20m

5.2832
400V/ 3,0kW 2´230V/Σ- 1,5 kW
h-0,60m h-1,20m
∅15, 6-8Bar
h-1,40m (Class.4.4.3)
(sustiprintos
konstrukcijos)
∅20, 6-8Bar
h-1,40m (Class.4.4.3)
h-1,40m (Class.4.4.3) ALD2
2´/Σ-600l/min. 2´400V/Σ- 5,0 kW
2´400V/Σ- 5,0 kW 230V/1, 5kW 2´400V/Σ- 5,0kW (16A) h-1,20m
∅15, 6-8Bar
1.72

(16A) h-1,20m h-0,60m (16A) h-1,20m

200 MM THK. SOLID BLOCK


h-1,40m (Class.4.4.3)
Water " V1", 3´230V/Σ- 2,0 kW
3´230V/Σ- 1,5kW 3´230V/Σ- 2,0kW h-1,20m
DN15 / 10 l /min.
h-1,20m
h-0,600
h-1,20m
ALD2 UP
WALL UPTO 2.10 MT HEIGHT

3.00
200lx
D* patalpoje
200lx
in zone
AND INSULATED SHEETING ABOVE THAT +0.60 m lvl.
3.0000
1.46

UP UP UP UP

REAR ELEVATION
FRONT ELEVATION

LEGEND
100 mm THK. FOAM
INSULATED WALL
9.16

250 MM THK THERMAL REV DESCRIPTION DATE DRAWN

INSULATED BLOCK WALL PROJECT TITLE


CHANGING RM.

PROPOSED ADDITION
38.0800 38.0800 200 MM THK SOLID

SHOWER
TO EXISTING GR + MEZZ.
BLOCK WALL
FACTORY SHED

14.05
AT GOZE IND FOURTH ,DUBAI
100 MM THK SOLID Parcel I.D. -, 3690456
BLOCK WALL Dubai, United Arab Emirates
9.16

CLIENT
GARBAGE RM
ROYAL CROWN FISHERIES
FACTORY L.L.C. - FACTORY

5.70
CHILL ROOM CONSULTANT

STORE

RECEIVING AREA
5.10

10.50
+1.05 m lvl.

BATH
PANTRY

GENTS CHANGING CHILL ROOM AL J AWAHE R E N GIN E E RING CON SULTA NCIE S
POWER RM.
STORE KEEPER

SHOWER PRAYER UP SHOWER PRAYER

UP
1.80 MT. W I D E P A S S A G E SHEET TITLE
UP UP
+1.05 m lvl.
+0.30 m lvl.
GROUND FLOOR PLAN
( REVISED )
PROJECT NO. :- DATE : - 26/06/2016

DRAWN BY :- CHECKED BY :-

GROUND FLOOR PLAN SCALE :- PAPER SIZE : A1


DRAWING NO. : 0-000 REVISION :0