Matrix Project Schedule

This project schedule outlines the tasks and timeline for constructing a new building from July 2015 through July 2016. It involves 18 main tasks including mobilization, constructing pile caps, floors, walls, installing windows, doors, painting, and inspections. The critical path runs through tasks like pile cap construction from mid-July through mid-August 2015, followed by sequential floor construction through early 2016 before external works and inspections in mid-2016. The project utilizes resources like RC works crews, brick layers, installers and painters across the 15 month timeline.

Uploaded by

Elangkoh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views1 page

Matrix Project Schedule

This project schedule outlines the tasks and timeline for constructing a new building from July 2015 through July 2016. It involves 18 main tasks including mobilization, constructing pile caps, floors, walls, installing windows, doors, painting, and inspections. The critical path runs through tasks like pile cap construction from mid-July through mid-August 2015, followed by sequential floor construction through early 2016 before external works and inspections in mid-2016. The project utilizes resources like RC works crews, brick layers, installers and painters across the 15 month timeline.

Uploaded by

Elangkoh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Principle Perspective Engineering Sdn Bhd Matrix Project Schedule Date : 25-06-2015

ID Task Name Duration Start Finish Resource Names 2016


July August September October November December January February March April May June July
21280512192602091623300613202704111825010815222906132027031017243107142128061320270310172401081522290512192603101724
1 Mobilization 11 days Wed 01/07/15 Wed 15/07/15 Pile Cap Team 10

2 Pile Cap 21.3 days Thu 16/07/15 Fri 14/08/15 RC Works 30

3 Ground Floor 26 days Thu 30/07/15 Thu 03/09/15 RC Works 30

4 Mezzanine Floor 32 days Thu 20/08/15 Fri 02/10/15 RC Works 30

5 First Floor 52 days Thu 10/09/15 Fri 20/11/15 RC Works 30

6 Mezzanine Level 1A 30 days Mon 19/10/15 Fri 27/11/15 RC Works 30

7 Second Floor 50 days Mon 09/11/15 Fri 15/01/16 RC Works 30

8 Mezzanine Level 2A 30 days Mon 21/12/15 Fri 29/01/16 RC Works 30

9 Roof Level 36 days Mon 11/01/16 Mon 29/02/16 RC Works 30

10 Roof Steel Work 13 days Tue 01/03/16 Thu 17/03/16 Steel Workers 8

11 External Wall 93 days Mon 23/11/15 Wed 30/03/16 Brick Layer 40

12 Internal Wall 85 days Mon 30/11/15 Fri 25/03/16 Brick Layer 40

13 Window 88 days Tue 15/12/15 Thu 14/04/16 Window Installers

14 Door 92 days Wed 09/12/15 Thu 14/04/16 Door Installers

15 Painting 77 days Thu 28/01/16 Fri 13/05/16 Painter 3

16 External Works 158 days Fri 04/09/15 Tue 12/04/16 General 30

17 Lift, Elevator, ACMV, Electrical & Fire Protection Works 132 days Tue 15/12/15 Wed 15/06/16 -

18 Authority Inspection 21 days Thu 16/06/16 Thu 14/07/16 -

Task Project Summary Manual Task Start-only Deadline

Project: Matrix Project Schedule Split Inactive Task Duration-only Finish-only Progress
Date: Wed 24/02/16 Milestone Inactive Milestone Manual Summary Rollup External Tasks Manual Progress
Summary Inactive Summary Manual Summary External Milestone

Page 1

You might also like