Elctrical License
Elctrical License
Elctrical License
Application Forms
Sex:
2. Name of Father
3 Permanent Address
PIN
PIN
5 District
7. Educational Qualifications
8. Technical Qualifications
9 Name and Address of Institutions in which the candidate has studied for Tech. Qual.
10 Whether the candidate is holder of Electrical Supervisor Competency Certificate issued by
any State Licensing Board. If so, give details
13 Details of Fee
Amount Challan Number Date Name of Treasury
I hereby declare that the particulars stated above are correct to the best of my knowledge . I am not a holder of
Supervisor Competency Certificate issued by the State Licensing Board other than those indicated in the
column 10. I also agree to the cancellation of my Competency Certificate that may be issued to me in
pursuance of this application in case the particulars furnished in the application are found incorrect or false.
Place
Signature of Applicant
Date
14. Library:
(a) Electricity Act 2003, CEA (Measure relating to Safety and Electric
Supply), Regulations 2010.
(b) Supply code
(c) State Licensing Board Haryana Rules
(d) National Building Code - Electrical
(e) Electrical Inspectorate standards
(f) Standards published by Central Board of Irrigation & Power
(g) Safety Manual
(h) All important BIS specifications as directed
by the Licensing Board and the Electrical Inspectorate from time to
time.
Signatures
Address
Place:
Dated:-
Conditions and documents required to be attached with application for the Grant of
Contractor Licence Class ‘A’
(a) Class ‘A’ Contractor Licence shall be granted only to a person or a firm having a registered
office in Haryana, U T Chandigarh or NCT Delhi unless exempted from this requirement by the
Board.
(b) Fees
Fees of Rs 2305/- should be deposited in any of the Haryana Treasury under the Head of account
:- “0043-Taxes and Duties on Electricity –Other receipts” and original treasury challan be
attached with the form.
(c) Nature of work
The Class ‘A’ Contractor can carry out erection and installation of all types of electrical
installation works as specified in the licence.
(d ) Establishment
The applicant shall employ solely for the purpose of contract works the minimum following staff
on full time basis and their consent and declaration in the form Annexure ‘B’ should be attached.
1) One Electrical Supervisor holding competency certificate issued by State Licensing Board
Haryana for respective voltage level for which contractor licence is applied for. For EHT level
licence, two electrical supervisors shall be employed.
2) One wireman for licence upto Medium Voltage, two wireman for licence upto HT level and three
wireman for licence upto EHT level shall be employed.
(e) Following Instruments are to be procured and they should be ISI marked /equivalent quality and
test certificates to be furnished at the time of testing of the instruments.
1. Insulation Meggar 500V; 0-50 Mega
2. Earth Tester with testing kit 0-5 with expanded scale of 1
3. Two nos. Neon Tester.
4. Frequency Meter 45 to 55 Hz
5. Tong Tester 0-800 A (with selector switch to measure different ranges from 10 A
onwards
6. Multimeter (Digital Type) AC/DC
7. 2 pairs of Rubber hand gloves for electrical purposes.
8. 2 Nos. Insulated pliers.
9. All wiring tools and any other instruments which may be considered necessary by the
Board.
The instruments shall be got tested at the Testing Laboratory attached to the Electrical
Inspectorate, Haryana Chandigarh or such laboratory specified by the Board initially
before the issue of licence and thereafter at specified intervals and the test report to be
produced to the Licensing Board for perusal and return.
Other Tools & Plants to be procured and maintained for HT /EHT Contactor Licence.
(i) Insulation Meggar 5000 V; 5000 Mega
(motorized /electronic type)
(ii) Phase Sequence Tester.
(iii) Spanner set
(a) Double end
(b) Box
(c ) Ring
( d) Adjustable type
(iv) Allen key set
(v) Cutting pliers (Insulated)
(vi) Micrometer/screw gauge
(vii) Nose pliers
(viii) Measuring tapes:
(a) 15 M
(b) 50 M
(ix) Portable compressor with spray gun
(x) Blower
(xi) Screw drivers of all sizes
(xii) Portable welding set
(xiii) Crimping tools with dye set
(a) Hand operated
(b) Hydraulic
(xiv) Rollers for cable laying
(xv) Portable grinder
(xvi) Safety belts
(xvii) Rubber gloves (electrical grade)
(xviii) Portable drill:
(a) Heavy duty
(b) Light duty
(xix) Tools for pipe threading & jointing
(xx) Chipping tools, chisels etc.
(xxi) Cable jointing facilities
(xxii) Fabrication and material handling facility.
The following additional facilities also have to be provided for EHT Contractor Licence:
1 Digital Earth Clamp Tester 0.01 to 50 with
selector switch.
(f) The applicant should have adequate drawing office facilities for the preparation of drawings, blue
prints etc. Also applicant should have library facility.
(g) Production units or manufacturing concerns should segregate the staff employed for the purpose of
contractors licence from the staff engaged for routine operations of the factories. The staff employed
under the Licensing Board Rules and under Regulation 3 & 5 of the “Central Electricity Authority
(Measures relating to Safety and Electric Supply) Regulations 2010”shall not on any account be mixed
up. Failure to keep separate staff for the purpose of the Licensing Board Rules and regulation 29 of CEA,
Regulations, 2010 shall be deemed to constitute violation of the rules and shall render the licence liable
for cancellation .
(h) Declaration to the effect that “ my/our firm/company has never been blacklisted by any Govt. /Semi
Govt. Organization and nor any such licence issued previously in my name or in the name of any relative
/spouse has been cancelled for any breach or infringement of conditions of the Licence” should be
attached.
(i) The age of prospective applicant for Contractor Licence should be minimum 21 years of individual
in case of proprietary firm and of authorized signatory in case of firm/company.
(j) Proof of residence to be enclosed.
(k) The application for Contractor Licence shall be accompanied with income return/balance sheet for the
last three years. The eligibility for issue of license for various categories will be as under:-
i) Upto MV (650 Volts) minimum Rs.15 lac turnover in one year during last three
years.
ii) Upto HV- minimum Rs 50 lac turnover in one year during last three years.
iii) Upto EHV minimum Rs. One Crore turnover in one year during last three years.
(l) The applicant will be required to submit PAN Number, service tax and sales tax number as
applicable.
(m) The applicant will present himself for pre-screening alongwith above documents, his appointed
supervisor and wireman in person with instruments.
Annexure-B
Form of Declaration
Place:
Date:
Name and Signature of Supervisor/Wireman.
Appendix –II
Application for Duplicate Licence/ Competency Certificate / Permit
I hereby apply for the issue of duplicate of my Licence /Certificate / Permit which is attached vide details
given below:
Place:
Date:
Signature of the Applicant
Appendix –III
Application for renewal of Electrical Contractor Licence
I hereby apply for the renewal of my licence which is attached (vide details given below)
b) Amount remitted
a) Present address
10 Whether the equipments have been tested as required in the SLB Haryana Rules. Certificates
be attached
11 Details of staff as on the date of application (Supervisors and Wiremen)
Name Certificate/Permit Number Date upto which valid
Declaration
1. Information furnished in the application is correct.
2. I/We am /are maintaining all the registers and books prescribed in the SLB Haryana rules and in
the circulars/letters issued by the SLB Haryana.
3. I am authorized to sign the application as contractor /on behalf of the contractor.
Place:
Date:
Signature of the Applicant
Appendix –IV
Application for Renewal of Supervisor Competency Certificate and Wireman Permit
I hereby apply for the renewal of my competency certificate / permit which is attached (vide
details given below)
1 a) Name of the applicant
(as in the Competency Certificate/permit )
b) Age and date of birth
c) The date on which the applicant completes 55
years. (Attach medical fitness certificate in case
age is above 55 years).
2 Address with Pin Code
Amount remitted
Place:
Date:
Signature
Appendix V
Application for upgradation of Supervisor Certificate
1 Name
2 Address with Pin Code
3 Qualification
(a) Academic
(b) Professional
4 Details of the Supervisor competency certificate now possessed by the applicant
SCC No
Date of issue
Present scope
5 Experience
(Note: Please read the Procedure/Instructions before filling the Form and write/tick the relevant).
It is certified that the installation mentioned above has been checked by me/Competent Authority and
the work has been executed according to CEA (Measures relating to Safety & Electric Supply)
Regulations, 2010 under the supervision of competent Electrical Supervisors and is now complete in
all respects.
Signature of owner/XEN/SDO/Authorised
Engineer-Incharge
Designation .................................................
Address..........................................................
Date................................................................
(Form - A-2)
APPLICATION FORMAT FOR THE INSPECTION OF H.T. (UPTO 33KV) INSTALLATION
BY THE O/O CHIEF ELECTRICAL INSPECTOR TO GOVT., HARYANA.
(Note: Please read the Procedure/Instructions before filling the Form and write/tick the relevant).
Signature of owner/XEN/SDO/Authorised
Engineer-Incharge
Designation .................................................
Address..........................................................
Date................................................................
(Form-B-1)
APPLICATION FORMAT FOR THE INSPECTION OF EHV OVERHEAD
TRANSMISSION LINES
(Note: Please read the Procedure/Instructions before filling the Form and write/tick the relevant).
2 Applicant
a Name of owner of Organization & Address
a Single Circuit
b Double Circuit
Total Route length of the line (KM)
5 Size of;
Conductor
Ground Wire
6 Span (meter)
a Average
b Minimum
c Maximum
7 Minimum Clearances (in meter)
a Ground Clearance
i at normal spans
ii at Road crossings
a) National Highway
b) State Highway
c) Other Roads.
iii At Power lines Crossings
800kV
400kV
220kV
132kV
66kV
33/22kV
11 KV
LT lines
iv At Railway crossing
v At River crossing
vi At Special crossing (if any)
8 Minimum calculated Factor of Safety for conductor
and Towers
9 Whether the followings have been duly provided?
15 a Enclosures:
(Please tick, if applicable and enclosed or write NA)
i Contractor’s license
b The following No Objection Certificates/Clearances
from the concerned Authorities shall be enclosed.
Wherever not applicable an undertaking of the same
by the Owner of the line shall be submitted
i Railway Authorities for Railway line Crossings
iv Approval of PTCC
vi Forest Clearance
It is certified that the installation mentioned above has been checked by me/Competent Authority and
the work has been executed according to CEA (Measures relating to Safety & Electric Supply)
Regulations, 2010 under the supervision of competent Electrical Supervisors and is now complete in
all respects.
Signature of owner/XEN/SDO/Authorised
Engineer-Incharge of Line
Designation .................................................
Address..........................................................
Date................................................................
(Form - B-2)
APPLICATION FORMAT FOR THE INSPECTION OF H.T. (UPTO 33KV) LINE BY THE
O/O CHIEF ELECTRICAL INSPECTOR TO GOVT., HARYANA.
(Note: Please read the Procedure/Instructions before filling the Form and write/tick the relevant).
It is certified that :-
The Line has been provided continuous earth wire till tail end and has been earthed properly.
The clearance (Horizontal/ Vertical) of the lines with other HT/LT lines and with the buildings has been
maintained as per CEA Regulations, 2010.
The guarding has been provided at the crossing points of line, river, road and special crossing (if any).
The installation mentioned above has been checked by me/Competent Authority and the work has been
executed according to CEA (Measures relating to Safety & Electric Supply) Regulations, 2010 under the
supervision of competent Electrical Supervisors and is now complete in all respects.
Signature of owner/XEN/SDO/Authorised
Engineer-Incharge of Line
Designation .................................................
Address..........................................................
Date................................................................
(Form-C-1)
(Application format for Periodical Inspection of the Electrical installation)
1. Name of Installation :
(type and brief details)
2. Applicant:
(b) Regulation 30 :
6. Enclosures;
(Please tick, if enclosed)
To
Sir,
I/ We have to state that the work of erection of the lift at the above mentioned
premises has been completed on
..........................by/through.......................................................................... I/we further request
that it may be registered and permission for working may be granted. The work of erection of the
lift has been carried out in accordance with the provisions of the Haryana Lifts and Escalators
Act, 2008(27 of 2008).
A fee of Rs. 2,500/- ( Rupees Two Thousand Five Hundred only) for each lift has
been deposited into the Government Treasury and the Treasury receipt in original for that
amount is enclosed.
Yours faithfully,
To
Sir,
We................................................................................................................(Name
of the manufacturer of lifts or Company of Electrical and Mechanical Engineers,) having
undertaken the work of erection of the lift at the premises of
................................................................................................................................and having
completed the erection of the said lift hereby certify that the work of erection of the lift complies
with the provision of the Haryana Lifts and Escalators Act, 2008 (27 of 2008). We further certify
that the erection and testing of the lift has been carried out in accordance with the Haryana Lifts
and Escalators Rules, 2008 and confirm that the lift, car, motor, controller, ropes, governor and
all system have been tested and confirm to the Bureau of Indian Standards.
It is certified that the building in which the lift is erected is structurally sound and stable.
We further certify that the lift installation is ready for inspection which is required to be
made for the purpose of registration under said Act and rules for working the same.
We undertake the full responsibility of the installation to be handed over duly to the
owner after inspection and compliance of provisions of the said Act and rules.
Yours faithfully,
To
We report that the electrical installation detailed below has been installed by us and
tested and that to the best of our knowledge and belief it complies with Indian Electricity Rules,
1956 as well as the Indian Standard Code of practice for Electrical Installations:-
........................................................ ................................................................
Signature of Supervisor, Signature of Electrical Contractor
Name and address. Name and Address.
......................................................... ..................................................................
No................................................... No.............................................................
Valid upto........................................ Valid upto.................................................
Dated...............................................
FORM E
(See rule 6 )
Application for registration for working a lift erected prior to the commencement of the
Haryana Lifts and Escalators Act, 2008.
To
The Inspector of Lifts,
..................................
4. Date of erection :
Encl: 1. Copy of annual Insurance Policy taken by the owner of the Lift covering insurance for
the persons using the Lift.
2. Challan of Government Treasury.
3. Annual maintenance contract.
4. Safety certificate.