Pile Cap Design Solution
Pile Cap Design Solution
Pile Cap Design Solution
2 1 Introduction :
3
4 This document covers R.C. design of Standard Pile-caps for 1 pile, 2 piles, 3 piles,4 piles, 5 Piles & 6 Piles
5
6 The R.C. design conforms to IS456-2000. Some Clauses from BS8110 are referred and used wherever
7 IS clauses are not too clear.
8
9 2 Reference Documents :
10
11 1) IS 456-2000 : Plain and Reinforced Concrete Code of Practice ( Limit State Method)
12
13 2) SP 16 : Design Aids for Reinforced Concrete to IS 456
14
15
16 3) IS 1786-1985 : Specification for High Strength Deformed Steel Bars and Wires for Concrete
17 Reinforcement
18
19 4) BS8110 : Structural Use of Concrete, Part 1: Code of Practice for design and construction.
20 Part 1: 1997
21
22 3 Design Philosophy :
23
24
25 Refer sketches furnished at the end of respective calculations for dimensional details of standard pile-caps.
26 For description of symbols refer "Design Parameters" furnished at the start of each calculation.
27 The Standard pile-caps are designed for the full Compression,Tension and Shear capacities of pile.
28
29 Following three checks are carried out in design of pile-caps.
30
31
A. Check for Punching Shear: ( For Factored Load)
32
33 This check is carried out for pile caps having more than 2 piles where 2 way action of pilecap exists.
34 The critical section for punching shear shall be at a distance of Dt eff/2 from the face of
pedestal (while considering punching of pedestal into pilecap) Clause 31.6
35
…….IS456
36
37 Actual Shear stress = Tv =Shear force at that section / (Dteff*Shear perimeter)
38 Actual Shear stress shall not exceed Permissible shear stress ( ks x Tc )
39
Where Tc = 0.25 x Sqrt( fck)
40 Clause 31.6.3
41 ks = (0.5 + bc) but not greater than 1
…….IS456
42 bc = ratio of short side to long side of the pedestal.
43
44 If Tv < ks x Tc…. No shear reinforcement is required for punching shear..
45 The pilecap depth is to be adjusted such that Tv is always less than ksTc.
46
47 B. Check for Bending: ( For Factored Load)
48
49
50 The critical section for bending shall be at the face of Pedestal. Bending moment
(Mxx and Mzz) is calculated at the face of pedestal. For calculating the bottom Clause34.2.
3.2 ..IS456
reinforcement, bending moment due to the full Compression (for Conservative results)
capacity of piles is calculated about the pedestal face in each direction and Bending moment
due to the selfweight of pilecap is deducted from it. (Soil Wt. & Surcharge pressure ignored
while calculating the bending moment for Conservative results.)
36 Axial load carrying capacity of concrete (ignore reinforcement) Pu = 0.4 fck Ac = 13966 kN
37 > 1560 kN Safe
38
As the Concrete strength without any longitudinal reinforcement is more than the maximum compressive force
39
provide nominal longitudinal reinforcement not less than 0.15 of cross-sectional area..... Clause 26.5.3.1 h ...IS456.
40
41 Astmin required = 1500 mm2
42 Provide T 16 @ 6 Nos. top & bottom both ways
43 Ast provided = 2412.75 mm2
44
45 b) Check for Axial tension :
46
47 Maximum Tensile force = 525 kN
48
49 Tension carrying capacity of reinforcement alone = 0.87 fy Ast = 871 kN
50 > 525 kN
Provided reinforcement Sufficient
This check is not applicable for Pilecap with 1 pile as the pedestal and pile is concentric.
ii) Parallel to Z axis in strip of width (d+2E)/2 on either side of the 3rd top pile (beam in Z direction)
Required ### Nos - T 25
Provide 7 Nos - T 25 Ast(prov) = 3434.4 mm2
N/mm2
N/mm2
QPT. NO.
.
QPT. NO.
.
QPT. NO.
.
QPT. NO.
.
1
2
4 R.C. Design of Pile Cap IPC4
3 1) Pile and Pilecap Data: 2) Design Parameters:
4 Diameter/size of Pile = d = 350 mm Assumed Pedestal Length = ' l2 ' = 1000 mm
5 Assumed Pedestal Width = ' b 2 ' =
Capacity of Pile : 750 mm
6
7 Axial Compression = C = ### kN Depth of pilecap top = (FGL- TOC) =h= 1.2 m
8 Axial Tension = T = 350 kN Density of Soil = gd = 18 kN/m3
9 Shear = S = 68 kN Grade of Concrete = fck = 35 N/mm2
10 Thickness of Pile cap = Dt = 1000 mm Grade of Steel = fy = 415 N/mm2
11 Spacing of Piles in Group = nd = 5.714 x ' d' Surcharge intensity = sr = 10 kN/m2
12 c/c distance between piles = 2 m Clear Cover to Pilecap Reinforcement
13 Dist. bet edge of pile & pilecap = E = 250 mm Bottom Cover d'b = 75 mm
14
Length of Pile Cap = L = 2.85 m Top Cover d't = 50 mm
15
16 Breadth of Pile Cap = B = 2.85 m Side Cover d's = 50 mm
17 3) Check for Punching Shear :
18 a. For individual pile :
19 perimetre = (E+d+Min of (Dteff/2,nd/2-d/2) )*2 = 2115.0 mm
20 Tv = C*1.5/(Dteff*Perimeter) = ### N/mm2
21 Tc = 1.479 N/mm2 #NAME?
22
b. For pile group :
23
24 perimetre = (l2+Dteff+b2+Dteff)*2 = 7160.00 mm
25 Tv=1.5(4C)/(Dteff*perimeter)= #NAME? N/mm2
26 ks calculated = 1.25 > 1 ks = 1
27 Tc = 1.479 N/mm2 #NAME?
28
29
30
4) Check For Bending:
31
32 a) Bottom Steel :
33 Bending Moment :
34 Mzzmax=1.5{2C(.5nd-b2/2)-L*Dt*25((B-b2)/2)2*.5}= ### kN-m
35 Mxxmax=1.5{2C(.5nd-l2/2)-B*Dt*25((L-l2)/2)2*.5 }= ### kN-m
36 Dteff(req) (for Mzz) = Sqrt(Mzz/(0.138*fck*L)) = ### mm
37 Dteff(req) (for Mxx) = Sqrt(Mxx/(0.138*fck*B)) = ### mm
38 Dteff(prov) = Dt - d'b -0.5*bar dia. = 915.00 mm ###
39
40 Ast (req) (for Mzz) = ### mm2 ( Parallel to X axis )
41 Ast (req) (for Mxx) = ### mm2 ( Parallel to Z axis )
42 Ast (min) (for Mzz) = (0.12/100)*B*Dt = 3420.00 mm2
43 Ast (min) (for Mxx) = (0.12/100)*B*Dt = 3420.00 mm2
44
45 i) Parallel to X axis Required 20 T@ ### c/c OR ### Nos
46 Provide 20 Nos - T 20
47
Ast(prov) = 6280 mm2
48
49
50 ii) Parallel toZ axis Required 20 T@ ### c/c OR ### Nos
Provide 20 Nos - T 20
Ast(prov) = 6280 mm2
PT. NO.
.
PT. NO.
.
sion Face)
PT. NO.
.
1
2
3 5 Design Of Pile Cap IPC5
4
5 1) Pile and Pilecap Data: 2) Design Parameters:
6 Diameter/size of Pile = d = 350 mm Ped. Length = ' b2 ' = 750 mm
7 Capacity of Pile : Ped. Width = ' l2 ' = 1000 mm
8
9 Axial Compression, C = 1080 kN Depth of pilecap top = (FGL- TOC) = h= 1.2 m
10 Axial Tension, T = 350 kN Density of Soil = gd = 18 kN/m3
11 Shear = S = 68 kN Grade of Concrete = fck = 35 N/mm2
12
13 Thickness of Pile cap = Dt = 1000 mm Grade of Steel = fy = 415 N/mm2
14 Spacing of Piles along z dir, s1 = 2.8 m Surcharge intensity = sr = 10 kN/m2
15 Spacing of Piles along x dir, s2 = 2.8 m Clear Cover to Pilecap Reinforcement
16
Dist. bet edge of pile & pilecap 'E' = 250 mm Bottom Cover d'b = 75 mm
17
18 Length of Pile Cap = L = 3.650 m Top Cover d't = 50 mm
19 Breadth of Pile Cap = B = 3.650 m Side Cover d's = 50 mm
20
21
22
23 3) Check for Punching Shear :
24
25 a. For individual pile :
26 perimetre = (E+d+Min of (Dteff/2,nd/2-d/2) )*2 = 2115.0 mm
27 Tv = C/(Dteff*Perimeter) = 0.837 N/mm2
28
29 Tc = 1.479 N/mm2 Tc > Tv Safe
30 b. For pile group :
31 perimetre = (l2+Dteff+b2+Dteff)*2 = 7160 mm
32
33 Tv=(4C-L*B*Dt*25)/(Dt eff
*perimeter)= 0.913 N/mm2
34 ks calculated = 1.25 > 1 ks = 1
35 Tc = 1.479 N/mm2
36
37 Tc > Tv Safe
38
39
40
41 4) Check For Bending:
42 a) Bottom Steel :
43
Bending Moment :
44
45 Muzz ={2C(0.5*s2-l2/2)-L*Dt*25((B-l2)/2)2*.5}= 1863.90 kN-m
46 Muxx={2C(.5*s1-b2/2)-B*Dt*25((L-b2)/2)2*.5 }= 2118.07 kN-m
47
Dteff(req) (for Muzz) = Sqrt(Mzz/(0.138*fck*L)) = 325.16 mm
48
49 Dteff(req) (for Muxx) = Sqrt(Mxx/(0.138*fck*B)) = 346.62 mm
50 Dteff(prov) = Dt - d'b -0.5*bar dia. = 915.00 mm Safe
Ast (req) (for Muzz) = 5762.74 mm2 ( Parallel to X axis )
Ast (req) (for Muxx) = 6567.74 mm2 ( Parallel to Z axis )
Ast (min) (for Muzz) = (0.12/100)*B*Dt = 4380.00 mm2
Ast (min) (for Muxx) = (0.12/100)*B*Dt = 4380.00 mm2
C940001 R3 ssasassss
1
2
3
4
5
6
7
1
2 i) Parallel to Z axis Required 20 Y@ 199 c/c OR 18.353 Nos
3
4 Provide 22 Nos - Y 20
5 Ast(prov) = 6908 mm2
6
7
8 ii) Parallel to X axis Required 20 Y@ 175 c/c OR 20.916 Nos
9 Provide 22 Nos - Y 20
10 Ast(prov) = 6908 mm2
11
12
13 b) Top Steel :
14 Muxx = (2T(0.5s2-0.5l2)+(Dt*25+gd*h+sr)*L*((B-l2)/2)2/2) = 811.35 kN-m
15
16 Muzz = (2T (0.5s1-0.5b2)+(Dt*25+gd*h+sr)*B*((L-b2)/2)2/2 ) = 934.68 kN-m
17 Ast(req) (for Muzz) = 2478.99 mm2
18 Ast(req) (for Muxx) = 2859.71 mm2
19
20 Ast (min)
(for Muxx) = 50% of (0.12/100)*B*Dt = 2003.85 mm2
21 Ast(min) (for Muzz) = 50% of (0.12/100)*B*Dt = 2003.85 mm2
22 i) Parallel to Z axis Required 12 Y@ 166 c/c 21.930 Nos
23
24 Provide 24 Nos - Y 12
25 Ast(prov) = 2712.96 mm 2
26
27
28 ii) Parallel to X axis Required 12 Y@ 144 c/c 25.298 Nos
29 Provide 24 Nos - Y 12
30
Ast(prov) = 2712.96 mm2
31
32
33 5) Check for One Way Shear :
34
a) For Maximum Compressive load
35
36 a. Shear Section Parallel to Z axis
37 shear plane location 0.958 m from centre , Shear Force = 2160.0 kN
38
av = 0.4575 m from pedestal face
39
40 % Steel = 0.207 Tc = 0.342 N/mm2 Tcmax = 3.70 N/mm2
41 Enhanced Shear stress =2*Dteff * Tc /av = 1.368 N/mm2 Tcmax > Tv Safe
42
Tv = 0.647 N/mm2
43
44
45 As Tc enhanced > Tv , Vus = 0.0 kN
46
Asvreq = 0.00 mm2
47
48 Asvmin = 0.00 mm2
49 Shear reinforcement is not required
50
Provide Y 0 legged stirrups @ c/c
C940001 R3 ssasassss
C940001 R3 ssasassss
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
1 b. Shear Section Parallel to X axis
2 shear plane location 0.833 m from centre , Shear Force= 2160.0 kN
3
4 av = 0.4575 m from pedestal face
5 % Steel = 0.207 Tc = 0.342 N/mm2
6 Enhanced Shear stress =2*Dteff * Tc /av = 1.368 N/mm2
7
8 Tv = 0.647 N/mm2
9
10 As Tc enhanced > Tv , Vus= 0.0 kN
11
12 Asvreq= 0.00 mm2
13 Asvreq= 0.00 mm2
14 Shear reinforcement is not required
15
16 Provide Y 0 legged stirrups @ c/c
17
18 b) For Maximum Tensile load
19
20 i). Shear Section Parallel to X or Z axis
21 The critical section for Shear (Parallel to X or Z axis) is at the face of pedestal
22
23
24 Dteff = Dt - d't -0.5*bar dia. = 944 mm (considered only for shear check for Tension Face)
25 Shear Force= 700.0 kN (350x2)
26
% Steel = 0.08 Tc = 0.2192 N/mm2
27
28 Tv = 0.2032 N/mm2 Tcmax > Tv Safe
29 Vus= 0.0 kN
30
Asvreq= 0.00 mm2
31
32 Asvmin = 0.00 mm2
33 Shear reinforcement is not required
34
Provide Y 0.00 legged stirrups @ c/c
35
36
37 6) Side Face Reinforcement:
38
Side face reinforcement is provided to control temperature and shrinkage cracks.
39
40 Width of pilecap prone to shrinkage & temperature cracks = 500 mm from each face
41 (Width assumed based on Clause 3.12.5.4 BS8110)
42
Ast on E/F = 0.1% of ( beff x Overall depth)= 500 mm2
43
44 Required Y 12 226.195 c / c
45 Provide 5 Y 12 218.75 c/c <300 SAFE
46
Ast provided on E/F= 565 mm2
47
48
49
50
C940001 R3 ssasassss
1
2
3
4
5
6
7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21 Mxx
22
x
23
24
25
26
z Mzz
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
C940001 R3 ssasassss
C940001 R3 ssasassss
1
2
3 6 R.C. Design of Pile Cap IPC6
4
5 1) Pile and Pilecap Data: 2) Design Parameters:
6 Diameter/size of Pile = d = 350 mm Ped. Length = ' l2 ' = 1000 mm
7 Capacity of Pile : Ped. Width = ' b2 ' = 750 mm
8
9 Axial Compression, C = 1080 kN Depth of pilecap top = (FGL- TOC) =h= 1.2 m
10 Axial Tension, T = 350 kN Density of Soil = gd = 18 kN/m3
11 Shear = S = 68 kN Grade of Concrete = fck = 35 N/mm2
12
13 Thickness of Pile cap = Dt = 1200 mm Grade of Steel = fy = 415 N/mm2
14 Spacing of Piles in Group = nd = 5.7 x ' d' Surcharge intensity = sr = 10 kN/m2
15 c/c distance between piles = 2 m Clear Cover to Pilecap Reinforcement
16
Dist. bet edge of pile & pilecap = E = 250 mm Bottom Cover d'b = 75 mm
17
18 Length of Pile Cap = L = 6.85 m Top Cover d't = 50 mm
19 Breadth of Pile Cap = B = 2.85 m Side Cover d's = 50 mm
20
21 3) Check for Punching Shear :
22 a. For individual pile :
23 perimeter = (E+d+Min of (Dteff/2,nd/2-d/2) )*2 = 2315.0 mm
24
25 Tv = C/(Dt eff
*Perimeter) = 0.628 N/mm2
26 Tc = 1.479 N/mm2 Tc > Tv Safe
27 b. For pile group :
28
29 perimeter = (l2+Dteff+b2+Dteff)*2 = 7960 mm
30 Tv=(6C)/(Dteff*perimeter)= 1.095 N/mm2
31 ks calculated = 1.25 > 1 ks = 1
32
33 Tc = 1.479 N/mm 2
Tc > Tv Safe
34
35 4) Check For Bending:
36
37 a) Bottom Steel :
38 Bending Moment :
39 Muxx={3C(0.5nd-b2/2)-L*Dt*25((B-b2)/2)2*.5}= 1911.72 kN-m
40
41 Muzz={2C(nd-l2/2)-B*Dt*25((L-l2)/2)2*.5 }= 2874.25 kN-m
42 Dteff(req) (for Muxx) = Sqrt(Mzz/(0.138*fck*L)) = 240.38 mm
43 Dteff(req) (for Muzz) = Sqrt(Mxx/(0.138*fck*B)) = 456.95 mm
44
45 Dteff(prov) = Dt - d'b -0.5*bar dia. = 1115.00 mm Safe
46 Ast (req) (for Muxx) = 4786.72 mm 2
( Parallel to Z axis )
47
Ast (req) (for Muzz) = 7344.6 mm2 ( Parallel to X axis )
48
49 Ast (min) (for Muxx) = (0.12/100)*B*Dt = 9864.00 mm 2
1
2
3
4
5
6
7
8
1
2 i) Parallel to X axis Required 20 Y@ 218 c/c OR 31.414 Nos
3
4 Provide 20 Nos - Y 20
5 Ast(prov) = 6280 mm 2
6
7
8 ii) Parallel to Z axis Required 20 Y@ 122 c/c OR 23.390 Nos
9 Provide 22 Nos - Y 20
10 Ast(prov) = 6908 mm 2
11
12
13 b) Top Steel :
14 Muxx = (3T(0.5nd-0.5b2)+(Dt*25+gd*h+sr)*L*((B-b2)/2)2/2) = 888.86 kN-m
15
16 Muzz = (2T (nd-0.5l2)+(Dt*25+gd*h+sr)*B*((L-l2)/2) /2 ) = 2
1801.01 kN-m
17 Ast(req) (for Muxx) = 2160.11 mm2
18 Ast(req) (for Muzz) = 4434.05 mm2
19
20 Ast(min) (for Muxx) = 50% of (0.12/100)*B*Dt = 4932.00 mm2 ( Parallel to Z axis )
21 Ast(min) (for Muzz) = 50% of (0.12/100)*B*Dt = 2052.00 mm 2
( Parallel to X axis )
22 i) Parallel to X axis Required 12 Y@ 157 c/c 43.631 Nos
23
24 Provide 20 Nos - Y 12
25 Ast(prov) = 2260.8 mm 2
26
27
28 ii) Parallel to Z axis Required 16 Y@ 129 c/c 22.064 Nos
29 Provide 22 Nos - Y 16
30
Ast(prov) = 4421.12 mm 2
31
32
33 5) Check for One Way Shear :
34
a) For Maximum Compressive load
35
36 a. Shear Section Parallel to X axis
37 shear plane location 0.9325 m from centre , Shear Force = 2244.9 kN
38
av = 0.5575 m from pedestal face
39
40 % Steel = 0.082 Tc = 0.224 N/mm2 Tcmax = 3.70 N/mm2
41 Enhanced Shear stress =2*Dteff * Tc /av = 0.895 N/mm 2
Tcmax > Tv Safe
42
Tv = 0.294 N/mm 2
43
44 As Tc enhanced > Tv , Vus = 0.0 kN
45 Asvreq = 0.00 mm2
46
Asvmin = 0.00 mm2
47
48 Shear reinforcement is not required
49 Provide Y 0 legged stirrups @ c/c
50
C940001 R3 ssasassss
1
2
3
4
5
6
7
1
2 b. Shear Section Parallel to Z axis
3
4 shear plane location 1.058 m from centre , Shear Force= 2160.0 kN
5 av = 0.5575 m from pedestal face
6 % Steel = 0.217 Tc = 0.350 N/mm2
7
8 Enhanced Shear stress =2*Dteff * Tc /av = 1.399 N/mm2
9 Tv = 0.680 N/mm2
10
11
12 As Tc enhanced > Tv , Vus= 0.0 kN
13 Asvreq= 0.00 mm2
14 Asvreq= 0.00 mm2
15
16
17 Shear reinforcement is not required
18 Provide Y 0 legged stirrups @ c/c
19
20
21 b) For Maximum Tensile load
22 i). Shear Section Parallel to X or Z axis
23
24 The critical section for Shear (Parallel to X or Z axis) is at the face of pedestal
25
26 Dteff = Dt - d't -0.5*bar dia. = 1144 mm (considered only for shear check for Tension Face)
27
28 Shear Force= 1050.0 kN (350x3)
29 % Steel = 0.14 Tc = 0.282 N/mm2
30
Tv = 0.322 N/mm2 Tcmax > Tv Safe
31
32 Vus= 129.9 kN
33 Asvreq= 62.91 mm2
34
Asvmin = 631.49 mm2
35
36 Shear reinforcement
37 Provide Y 12 6 legged stirrups @ 200 c/c
38
39
40 6) Side Face Reinforcement:
41 Side face reinforcement is provided to control temperature and shrinkage cracks.
42
Width of pilecap prone to shrinkage & temperature cracks = 500 mm from each face
43
44
45 Ast on E/F = 0.1% of ( beff x Overall depth) = 600 mm2 (Clause 26.5.1.3...IS456)
46
Required Y 12 188.496 c / c
47
48 Provide 6 Y 12 ( 215 c/c)
49 Ast provided on E/F= 679 mm 2
<300 SAFE
50
C940001 R3 ssasassss
1
2
3
4
5
6
7
1
2 Mxx
3
4 x
5
6 Mzz
7
8 z
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
C940001 R3 ssasassss
1
2
3 6 R.C. Design of Pile Cap IPC9
4
5 1) Pile and Pilecap Data: 2) Design Parameters:
6 Diameter/size of Pile = d = 350 mm Ped. Length = ' l2 ' = 1000 mm
7 Capacity of Pile : Ped. Width = ' b2 ' = 750 mm
8
9 Axial Compression, C = 1080 kN Depth of pilecap top = (FGL- TOC) =h= 1.2 m
10 Axial Tension, T = 350 kN Density of Soil = gd = 18 kN/m3
11 Shear = S = 68 kN Grade of Concrete = fck = 35 N/mm2
12
13 Thickness of Pile cap = Dt = 1200 mm Grade of Steel = fy = 415 N/mm2
14 Spacing of Piles in Group = nd = 5.7 x ' d' Surcharge intensity = sr = 10 kN/m2
15 c/c distance between piles = 2 m Clear Cover to Pilecap Reinforcement
16
Dist. bet edge of pile & pilecap = E = 250 mm Bottom Cover d'b = 75 mm
17
18 Length of Pile Cap = L = 4.85 m Top Cover d't = 50 mm
19 Breadth of Pile Cap = B = 2.85 m Side Cover d's = 50 mm
20
21 3) Check for Punching Shear :
22 a. For individual pile :
23 perimeter = (E+d+Min of (Dteff/2,nd/2-d/2) )*2 = 2315.0 mm
24
25 Tv = C/(Dt eff
*Perimeter) = 0.628 N/mm2
26 Tc = 1.479 N/mm2 Tc > Tv Safe
27 b. For pile group :
28
29 perimeter = (l2+Dteff+b2+Dteff)*2 = 7960 mm
30 Tv=(6C)/(Dteff*perimeter)= 1.095 N/mm2
31 ks calculated = 1.25 > 1 ks = 1
32
33 Tc = 1.479 N/mm 2
Tc > Tv Safe
34
35 4) Check For Bending:
36
37 a) Bottom Steel :
38 Bending Moment :
39 Muxx={3C(0.5nd-b2/2)-L*Dt*25((B-b2)/2)2*.5}= 1944.79 kN-m
40
41 Muzz={2C(nd-l2/2)-B*Dt*25((L-l2)/2)2*.5 }= 3081.58 kN-m
42 Dteff(req) (for Muxx) = Sqrt(Mzz/(0.138*fck*L)) = 288.13 mm
43 Dteff(req) (for Muzz) = Sqrt(Mxx/(0.138*fck*B)) = 473.14 mm
44
45 Dteff(prov) = Dt - d'b -0.5*bar dia. = 1115.00 mm Safe
46 Ast (req) (for Muxx) = 4885.69 mm 2
( Parallel to Z axis )
47
Ast (req) (for Muzz) = 7890.9 mm2 ( Parallel to X axis )
48
49 Ast (min) (for Muxx) = (0.12/100)*B*Dt = 6984.00 mm 2
1
2
3
4
5
6
7
8
1
2 i) Parallel to X axis Required 20 Y@ 218 c/c OR 22.242 Nos
3
4 Provide 20 Nos - Y 20
5 Ast(prov) = 6280 mm 2
6
7
8 ii) Parallel to Z axis Required 20 Y@ 113 c/c OR 25.130 Nos
9 Provide 22 Nos - Y 20
10 Ast(prov) = 6908 mm 2
11
12
13 b) Top Steel :
14 Muxx = (3T(0.5nd-0.5b2)+(Dt*25+gd*h+sr)*L*((B-b2)/2)2/2) = 820.94 kN-m
15
16 Muzz = (2T (nd-0.5l2)+(Dt*25+gd*h+sr)*B*((L-l2)/2) /2 ) = 2
1375.28 kN-m
17 Ast(req) (for Muxx) = 1997.07 mm2
18 Ast(req) (for Muzz) = 3372.68 mm2
19
20 Ast(min) (for Muxx) = 50% of (0.12/100)*B*Dt = 3492.00 mm2 ( Parallel to Z axis )
21 Ast(min) (for Muzz) = 50% of (0.12/100)*B*Dt = 2052.00 mm 2
( Parallel to X axis )
22 i) Parallel to X axis Required 12 Y@ 157 c/c 30.892 Nos
23
24 Provide 20 Nos - Y 12
25 Ast(prov) = 2260.8 mm 2
26
27
28 ii) Parallel to Z axis Required 16 Y@ 170 c/c 16.783 Nos
29 Provide 22 Nos - Y 16
30
Ast(prov) = 4421.12 mm 2
31
32
33 5) Check for One Way Shear :
34
a) For Maximum Compressive load
35
36 a. Shear Section Parallel to X axis
37 shear plane location 0.9325 m from centre , Shear Force = 2244.9 kN
38
av = 0.5575 m from pedestal face
39
40 % Steel = 0.116 Tc = 0.263 N/mm2 Tcmax = 3.70 N/mm2
41 Enhanced Shear stress =2*Dteff * Tc /av = 1.051 N/mm 2
Tcmax > Tv Safe
42
Tv = 0.415 N/mm 2
43
44 As Tc enhanced > Tv , Vus = 0.0 kN
45 Asvreq = 0.00 mm2
46
Asvmin = 0.00 mm2
47
48 Shear reinforcement is not required
49 Provide Y 0 legged stirrups @ c/c
50
C940001 R3 ssasassss
1
2
3
4
5
6
7
1
2 b. Shear Section Parallel to Z axis
3
4 shear plane location 1.058 m from centre , Shear Force= 2160.0 kN
5 av = 0.5575 m from pedestal face
6 % Steel = 0.217 Tc = 0.350 N/mm2
7
8 Enhanced Shear stress =2*Dteff * Tc /av = 1.399 N/mm2
9 Tv = 0.680 N/mm2
10
11
12 As Tc enhanced > Tv , Vus= 0.0 kN
13 Asvreq= 0.00 mm2
14 Asvreq= 0.00 mm2
15
16
17 Shear reinforcement is not required
18 Provide Y 0 legged stirrups @ c/c
19
20
21 b) For Maximum Tensile load
22 i). Shear Section Parallel to X or Z axis
23
24 The critical section for Shear (Parallel to X or Z axis) is at the face of pedestal
25
26 Dteff = Dt - d't -0.5*bar dia. = 1144 mm (considered only for shear check for Tension Face)
27
28 Shear Force= 1050.0 kN (350x3)
29 % Steel = 0.14 Tc = 0.282 N/mm2
30
Tv = 0.322 N/mm2 Tcmax > Tv Safe
31
32 Vus= 129.9 kN
33 Asvreq= 62.91 mm2
34
Asvmin = 631.49 mm2
35
36 Shear reinforcement
37 Provide Y 12 6 legged stirrups @ 200 c/c
38
39
40 6) Side Face Reinforcement:
41 Side face reinforcement is provided to control temperature and shrinkage cracks.
42
Width of pilecap prone to shrinkage & temperature cracks = 500 mm from each face
43
44
45 Ast on E/F = 0.1% of ( beff x Overall depth) = 600 mm2 (Clause 26.5.1.3...IS456)
46
Required Y 12 188.496 c / c
47
48 Provide 6 Y 12 ( 215 c/c)
49 Ast provided on E/F= 679 mm 2
<300 SAFE
50
C940001 R3 ssasassss
1
2
3
4
5
6
7
1
2 Mxx
3
4 x
5
6 Mzz
7
8 z
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
C940001 R3 ssasassss
1
2 9 R.C. Design of Pile Cap 50PC2
3 1) Pile and Pilecap Data: 2) Design Parameters:
4
5 Assumed Pedestal Length = ' l2 ' =
Diameter of Pile = d = 500 mm 450
6
Capacity of Pile : Assumed Pedestal Width = ' b2 ' = 450
7
8 Axial Compression = C = ### kN Depth of pilecap top = h=(FGL- TOC ) = 1.5
9 Axial Tension = T = 200 kN Density of Soil = gd = 18
10 Shear = S = 35.1 kN Grade of Concrete = fck = 25
11 Thickness of Pile cap = Dt = 800 mm Grade of Steel = fy = 415
12 Spacing of Piles in Group = nd = 3 x ' d' Surcharge intensity = sr = 10
13 c/c distance between piles = 1.5 m Clear Cover to Pilecap Reinforcement
14
Dist. bet edge of pile & pilecap = E = 150 mm Bottom Cover d'b = 100
15
16 Length of Pile Cap = L = 2.30 m Top Cover d't = 75
17 Breadth of Pile Cap = B = 0.80 m Side Cover d's = 50
18
19 3) Check for Punching Shear :
20
21 This check is not applicable for Pilecap with 2 piles as the pilecap spans only in one direction.
22
23
24 4) Check For Bending :
25 a) Bottom Steel :
26 Bending Moment at face of Pedestal :
27 Mxxmax=1.5{C(0.5nd-l2/2)-B*Dt*25((L-l2)/2)2 *.5 } = ### kN-m (Soil Wt. & Surchrage pressure
28 Dteff(req) = Sqrt(Mxxmax/(0.138*fck*B)) = ### mm ignored for Conservative results)
29 Dteff(prov) = Dt - d'b -0.5*bar dia. = 687.50 mm ###
30 Ast(req) (for Mxx) = (0.5*fck*B*Dteff /fy)*{1-Sqrt(1-4.6Mxx/(fck*B*Dteff 2)} = #NAME? mm2
31
Ast(min) (for Mxx) = (0.2/100)*B*Dteff = 1100.00 mm2
32
33 a. Parallel to Z axis Required 25 T@ ### c/c OR ### Nos
34 Provide 6 Nos - T 25 Ast(prov) = 2944
35
36 b) Top Steel :
37
38 Mxxmax = 1.5*(T (0.5nd-0.5l2)+(Dt*25+gd*h+sr)*B*((L-l2)/2)2/2 ) = 186.76 kN-m
39
40 Ast (req) (for Mxx) = (0.5*fck*B*Dteff /fy)*{1-Sqrt(1-4.6Mxx/(fck*B*Dteff 2)}= 770.70 mm2
41 Ast (min) (for Mxx) = 50% of (0.2/100)*B*Dteff = 550.00 mm2
42 a. Parallel to Z axis Req 16 T@ 209 c/c 3.835 Nos
43 Provide 6 Nos - T 16 Ast(prov) = 1206
44
45 5) Check for One Way Shear :
46 a) For Maximum Compressive load
47
48
49 Shear Section Parallel to X axis
50 Shear plane location 0.569 m from pedestal centre , Shear Force= ### kN
av = 0.34375 m from pedestal face
% Steel = 0.535 Tc = 0.503 N/mm2
Enhanced Shear stress =2*Dteff * Tc /av = 2.010 N/mm2
Tv = #NAME? N/mm 2
Tcmax= 3.10 N/mm2 #NAME?
#NAME?
mm
mm
mm
mm2
mm2
EQPT. NO.
.
OF
QPT. NO.
OF .