USER GUIDE - PM Module Page Wise Breakup 2.1 PDF
USER GUIDE - PM Module Page Wise Breakup 2.1 PDF
0
PM USER GUIDE 05/02/2015
INDEX
Sr. No. User Guide : Plant Maintenance Processes Page No.
ERP
PM-1 Overview of PM Master data ( Refer Power Point presentation )
portal
ERP
PM-2 SAP Login & Navigation ( Refer Power Point presentation )
Portal
PM-3.0 PM Process Flow Chart ( END -to- END process flow ) 2
PM-3.4 Case 4: Breakdown Maintenance by Vendor (Need Based Service and APO/ARC is available) 8
Complete the
IF Notification after
CASE 3 - PM-3.3 material NO Confirmation
Call Vendor by is Confirmation CNFR/NOCO
Is AMC / YES Vendor docket of Set various parameters
WARRANTY IS details in
required Maintenance satisfactory/Not Fill Service Entry
notification ? order -IW41 ( satisfactory, Sheet W.r.t. PO
AVAILABLE ? ( as per Storage
SET status As applicable Malfunction End
" VEND" YES ) time,Cataloge data etc. locatiions ,
( If Applicable ) Confirm/Accept/
NO Penalty Deductions as
A per PO number
centralized or
decentralised) -
( as applicable )
( When required item is available in store )- Refer Breakdown Process Manual page 8 - 59
Create,Assign & Acknowledge the Notification using steps 1 to 3 of EXERCISE PM-3.1
1
2 Creating & Approving Order
Enter /niw22 in Transaction window
Press
By default Notificn No. appears; if not enter it Enter
Press
Click on Create order icon ; Create order window pops up; click to continue Enter
Press
Ignore any mesg about date and continue Enter
Objct infm window pops up; click to continue
Click Operations tab; enter (No of units reqd ) NU:- 2; duration :- 1; Work gets calculated
Material Issue against Reservation (if the material is available in storage location of same person
who has created/released Maintenance Order ) Click
Components tab;Enter Component:e.g. 12000175; Reqd qty:- 2; UM:- EA; IC:- L(Stock item); Sloc:- Press
1000 Enter
Click on the material availability icon to ensure availability. Save
Save and Notedown Order Number.
2A
If the material is not available in storage location of same person who has created/released
Maintenance Order
Note : Finance person will review cost reflecting in GL for respective work using Tcode
FS10N/F.08/GR55
Click on accounting document
Note : Cost centre (e.g. 2417301) and R&M GL (e.g. 5020805) in combination correctly debited.
Execute
11 Enter /niw32 in Transaction window
Press
By default Order No. appears; if not enter it Enter
Click Complete Business tab; click to continue
Status of M.O. will changed to 'CLSD' - Closed
Communication Details (Filled to inform specific person from vendor side) and other details regarding
docket booking etc
Set Status “VEND”.
Information to Vendor is sent to Vendor’s Email ID thru SAP as per the details maintained in Vendor
Docket Screen .
REMINDER - REMD & Final Reminder - FREM can be checked as per communication.
3 Creating Order ( If material is required )
Enter /niw22 in Transaction window ( or search notification no. by IW28 )
Press
By default Notification No. appears; if not enter it Enter
Press
Click on Order icon; Create order window pops up; click to continue Enter
Press
Ignore any message about date and continue Enter
Click Operations tab; Goto Control Key field; select PM01 ,enter (No of units reqd ) NU:- 2; duration :- Press
1; Work gets calculated Enter
4 Material Issue against Reservation (if the material is available in storage location of same person
who has created/released Maintenance Order )
Click Components tab;Enter Component:e.g. 12000175; Reqd qty:- 2; UM:- EA; IC:- L(Stock item);
Sloc:-1000
Click on the material availability icon to ensure availability.
Press
Click Save & Notedown the Order No. Enter
4A
If the material is not available in storage location of same person who has created/released
Maintenance Order
Please refer MM Script of Material Stock transfer :
A. Request (Reservation with Mvt type-913 along with its work flow) is to be created for
transfer of material from Main Store/any other store to the storage location the person who
has created Maintenance Order.
( MB21 (Mvt-913)->Workflow-> Approval.)
B. Transfer of required material/store from Main Store/any other store to the storage
location of the person who has created Maintenance Order with necessary work flow for
approval process to store transfer. (MIGO ( "transfer posting" Mvt 915)-and >MIGO(Stock "
placing in storage" at receiving SLOC,w.r.t Material document of Mvt- 915)
Maintain “Vendor Docket Details regarding completion of work and performance by Vendor etc”
Standby provided by the Vendor ? - YES or NO,
Quality of Service - Satisfactory or NOT Satisfactory
12 Service Entry Sheet ( SES ) of Vendor ( Ref. Page no 115 - 121 of Breakdown manual)
Create Service entry sheet with reference to Purchase order ( AMC PO ) - ML81N
( AMC PO is available in Equipment Master data - as characteristics )
Refer relevant PM “Vendor Docket Report ZPM01 “ and its summary for performance of the vendor
and calculate the penalty amount if any and fill in the SES at relevant place .
Release should be affected based on PM “Vendor Docket Report ZPM01 “ and its summary for
performance of the vendor and considering the penalty amount if any
SAP INBOX WORKFLOW - Release Service entry sheet
Initiate SES release for next level.
Enter comments for next reviewer.
Select next approver by location and position and Click Initiate.
Login into system with approver’s user id, and open SAP Inbox. Select SES Release message, the
system will show the SES to be approved. Approve and Forward
Note : Finance person will review cost reflecting in GL for respective work using Tcode
FS10N/F.08/GR55
Click on accounting document
Note : Cost centre (2417301) and R&M GL (5020805) in combination correctly debited.
1
Create,Assign & Ackldge the Notification using steps 1 to 3 of ( Breakdown Notification )
2 Creating Order
Click Operations tab; Maintain new Operation with Control Key “PM03”. Select operation and
click on “External”.
Click on "EXTERNAL" for “Service Selection” and select option “From Purchasing Document”.
Select Services and adopt services. Maintain Requisitioner and Cost Element. Press
Enter
Information to Vendor is sent to Vendor’s Email ID thru SAP as per the details maintained in Vendor
Docket Screen . REMINDER - REMD &
Final Reminder - FREM can be checked as per communication.
B. Transfer of required material/store from Main Store/any other store to the storage
location of the person who has created Maintenance Order with necessary work flow for
approval process to store transfer. (MIGO ( "transfer posting" Mvt 915)-and >MIGO(Stock "
placing in storage" at receiving SLOC,w.r.t Material document of Mvt- 915)
Maintain “Vendor Docket Details regarding completion of work and performance by Vendor etc”
Standby provided by the Vendor ? - YES or NO,
Quality of Service - Satisfactory or NOT Satisfactory
12
Complete & Confirm the Notification using steps of Breakdown Notification
User Status “Work Completed” is set by “Person Responsible”.
User Status “Confirmed” or “Rework” is set by “Initiator”.
13 Technical Completion of the Order
Enter /niw22 in Transaction window Execute
By default Notificn No. appears; if not enter it
Click Order icon ; Click Black & White Flag icon; Window pops up Save
save it.
14A ORDER CONFIRMATION : Entry of Actual Hours
Enter /niw41 in Transaction window
By default Order No. appears; if not enter it
Enter Actual Work : (time taken in Hours)
Press Save. (Ignore all warning messages)
Note : Finance person will review cost reflecting in GL for respective work using Tcode
FS10N/F.08/GR55
Click on accounting document
Note : Cost centre (2417301) and R&M GL (5020805) in combination correctly debited.
Information window pops up; click to continue; Error window pops up; click to continue
Enter Material Group: eg .2001011, Pur Grp: eg.040, Requisnr: in the pop up window
Click External tab at the bottom;
Enter Purchasing Organization: Decentralized 2000
Enter Servcie No(if available):eg. 73000030 , if Not available use Short text field, Qty:eg2,unit:eg ea, Press
Gross Price: eg.2000 ; Cost element: eg.5020812 Enter
Click Save & Notedown the Order No.
3 Release of Order
Note : Finance person will review cost reflecting in GL for respective work using Tcode
FS10N/F.08/GR55
Click on accounting document
Note : Cost centre (2417301) and R&M GL (5020805) in combination correctly debited.
Press
Save and Notedown Order Number. ( e.g. 10200xxxxxx ) Enter
Release Order : Enter /niw32 in Transaction window By default Maintenance Order No.
appears; if not enter it Save
Click Order icon ; Click Black & White Flag icon; Window pops up Save
save it.
Click on Catalog Data tab; Object Part & Damage part tab highlighted
In Object part Enter Codegrp:- select by search; ex: OFC
in Damage part Enter Codegrp:- select by search;ex:- PM1-Damage 1
Enter Assembly text:- About fault occurred
Click on Causes tab
Enter Codegrp:- select by search; ex: PM1- cause 1
Enter Cause Text: Cause for the breakdown
Click on Activities tab
Enter Codegrp:- select by search; ex: PM1- Activity 1
Enter Activity text:- Action taken to restore fault
Enter Start date & Time ; End date & Time using search codes
7 Completion of notification
Click Black & White flag icon on toolbar; Status changes NOCO
15
Creation of General Maintenance Notification (Inspection Work scenario)
Write down the required text , select required FL along with priority
2 In the Catalog data, select object part and damage tab. Enter the appropriate code group
thereafter or write description of activity
eg CIVIL-JOB,IT-JOB etc
3 Save the Notification and release the Notification thereafter.- NOPR
4 Send the Notification to all concerned using this tab available at top left corner
All the stake holders will open their SAP Mail Box and will create the new Notification with Main
Notification number in the Notification description
3 Completion of Notification
Concerned person will do the required activity
Material or service may be taken in New Notification/Order like in Break down Notification, if
required.
Thereafter person responsible will complete the causes and activity sheet in Main Notification
and will intimate the initiator using same process as mentioned above.
Click Black & White flag icon on toolbar; Status changes NOCO
EXERCISE : PM-6
1.a Scrapping proposal is initiated using T.code ZSP01,new window will come up, then
press the "create proposal" tab.
thereafter write the description of scrapping proposal, in the required field, Click Add
Equipment Tab--> Equipment Selection Screen will appear,select the Equipment (for
Scrapping) as per selection criteria as per your convenience, after selecting the equipment
to be scrapped use this button , in the right top corner
then press save button, system will generate the Scrapping proposal number, note down
this number. There will be four Tab (i) Update, (ii) Attach Document, (iii) Assign Rv-Ap, (iv)
Submit.
1.b Now attach the scrapping document, using attach document tab.Document available in
the system can be attached only, for creating the equipment in the system by using T CODE-
-> CV01N.
The document to be attached is first uploaded in ERP using CV01N T.code, using
document type as ZSP.
then press enter and write the description of document , thereafter attach the required
document using this button at the bottom
Thereafter press save button and system will generate a document number, this document
will be uploaded in attach , document in Scrapping proposal.
after attaching the document in T.cdoe ZSP01, using attach document press save button.
1.c Now press update button , and enter the Total Mantenance cost incurred over the
Equipment, and press save button.
1.d Now press, Assign reviewer and approver(Assign Rv-Ap) button, enter reviewers and
approver IDs (as per in hierarchy), and press assign tab.
Now press submit button and system will prompt to select out of forward/return to and
press send note sheet, thereafter message will go to the reviewer's inbox.
1.e Now reviewer will open his SAP mail , and update the remarks in "status by reviewer
tab" under proposal tab then pressing save and go to notes sheet tab, and may send the
note sheet or ask for clarification(if required,otherwise press send note sheet).
after reommendations of reviewer, document will come to SAP mail box (SBWP)of
Approver.
Approver will open his SAP mail and finally approve the proposal or send back for
clarification(if required) by putting required remarks in Proposal document.
2.Formation of scrapping committee:- T CODE-->ZSP02
2.a Scrapping committee is initiated with T.Code zsp02, new window will come up, then
press the "Create-SC" tab.
thereafter write the description for scrapping committee, in the required field and write
down the approved scrapping proposal no.(SP NO.) in required field and press enter.
Mention the convener, members, chairman and approver ID,s for scrapping committee
thereafter press save button, system will generate the
Enter the user ID of competent authority for approval and send note sheet,thereafter
system will send the document to his SAP mail box.
He(competent authority) will open his SAP mail box and will approve the committee as
done earlier.
Now, once scrapping committee is formed, committee will sit at particular date and time
and this information will be sent to all concerned to decide about scrapping of various
equipments
3.a First create the scrapping approval by T.Code. ZSP03, new window will pop up, then
press " Create-SA" tab.
thereafter , write the description of scrapping approval, and write the scrapping committee
document number then press enter and then save button.
system will generate the scrapping approval document number.(Note down this generated
SA No.) and click "Meeting Tab" for giving the intimation to all committee members of
Scrapping Approval committee meeting
Now, convener will decide and intimate to all committee members about date,time and
place of meeting .
write down the meeting date, time & place and forward to concerned committee persons
(ID), then press the tab"send meeting schedule".
Thereafter the message of the meeting will be reached to the SAP mail box of all
concerned(committee members).
Now committee members will sit to gether and decide about Equipments scrapping and will
submit its report in the form of document, now this committee report in the
form of "ZSA" will be created first in CV01N, as was done earlier with ZSP for scrapping
proposal by using document type as a "ZSA"
Now this ZSA type document will be uploaded using T.code ZSP03, using "DOC-upload"
tab,then press save button.
After up loading the Document (scrapping committee draft letter), Click "SA-Submit" Tab
and send to Approval persons as available in hierarchy for further correct the
status/approval in SAP System up to Final approver/competent authority.
Now first person in the approval heirarchy will open the SAP mail box(SBWP) and will enter
the correct status and comments as done earlier in the scrapping proposal process
After filling the required comments press" save and go to notesheet" tab, now write the
required comments in notesheet as text and press the " send notesheet" tab.
thereafter the document will reach in the SAP mail box of next person in the chain,
wherein he will put his remarks , as done in the previous step, thereafter document will go
the SAP mail box of Final approver.
Final approver will open his SAP mail box a, will select the suitable status and will write the
required comments and will press save and go to notesheet tab.
Thereafter he will write the required comments in notesheet in free text, and will press the
approved tab. The intmation regarding Equipment Scrapping approval or Rejection will
reach in the SAP Mail Box of Initiator/convener and ACE-9 Preparation will start
accordingly.
4.a Go to T.code ZSP04 and press"Create ACE-9 report", then write the descreption of
ACE-9 also write the scrapping approval document no.
Enter the Net Book value, Anticipated realization value, decommission date and
decommission value whatever written in scrapping committee document (draft letter) etc
Enter it and system will generate the ACE-9 Document no.
Now ACE-9 is required to be updated for this again Click "update ACE-9" tab
Now print of system generated ACE-9 can be taken from ACE 9 print from ZSP04 T.Code,
after taking the print the same is required to be signed by committee members
Once signed, same is required to be uploaded into the system, by "upload ACE 9" tab, as
has been done earlier.
After getting approval from as above concerned competent authority, go to again "upload
ACE-9" Tab for sending this approved ACE-9 to Finance(FICO) person for further
necessary action at FICO End either through this SAP Mail.
The document to be attached is first uploaded using document type as ZAC and
Document status first "CR-Created" then "AD-approved" and Save, document will self
approved attaching poit of view
write the description of document , thereafter attach the required document using this
button at the bottom
Go to the top left corner button 'service for object'--->send--->send object with note, one
screen will open and fill/write Descriptions regarding ACE-9 sending, fill the Recipient ID---
>ENTER, Recipient name will display then go to the send button in the bottom and click,
ACE-9 will reached in the SAP Mail Box of FICO person.
EXERCISE : PM-7
Preventive Maintenance- Single Cycle plan
1 Creation of Mtce Plan
Enter /nIP41 in Transaction window
Select Mtce plan category as "NO PM Notification"
Enter "Monthly Plan for cdot Exchange" in Mtce plan field
Enter cycle-1, unit-MON,cycle text-monthly basis
Enter "Monthly Plan for 103000000896" in Mtce item field
Enter equipment (below) as "103000000896"
Finally the initiator will confirm the G1 Notification number as done in other case.
Example:
SWITCH SWITCH goes down due to Transmission media fault TXM
G1 Notification
1 IW21 - Create Notification with TYPE -G1 by Switch side - Initiator ( Switch Person )
SYSTEM STATUS USER
G1
STATUS
OSNO
CRTD
2 Enter Description/Priority/Partners- Person Responsible (for ex.TXM persn )
3 Enter the affected equipment no.( for ex.Switch )in SYSTEM IMPECTED TAB
4 ASGD
5 save the notifiction
System generats notification number for G1 ( After saving the notification assigned to
Person responsible )
( Person responsible ( TXM ) will find this G1 notification through SAP mail/SMS or e-mail )
( you can use IW28 )
6 OPEN the notification - G1 and Acknowledge that.
ACKD
7
by TXM person responsible
8 NOPR ( put in process by green flag )
After Acknowledge the fault ( G1 ) , TXM Person responsible will create his /her OWN
9
breakdown notification ( B2 ) or use already created notification
10 Record that notification in the G1 notification at SYSTEM IMPECTED TAB
at ACTUAL FAULT NOTIFICATION ( B2)
Befor confirming the notification ( B2 ) by initiator ( TXM ) , the INITIATOR of B2 ( TXM
11 )/Person responsible of G1 will compelete ( COMP ) the G1 notification and sentd it to
initiator of G1 for confirming the G1 ( CNFR )
COMP
12
by TXM person resp. of G1
CNFR
13
by INITIATOR of G1 ( Switch )
14 NOCO by INITIATOR of G1 ( Switch )
Re-Parenting Process :
Functional Locations and Equipments can be shifted within the same Plant,
across Plants and across Company .
For Functional Locations, the naming convention is based on Structure
Indicator and hence, the same FL cannot be shifted with the existing FL label.
Deletion Flag (DLFL) is set on the existing FL and a new FL will be created with
new label according to the new structure. To carry forward the history, the Old
FL label will be maintained in the new FL Master.
Equipment shifting within the same Plant will involve dismantling and
installation and changing of master data parameters such as Planner Group,
Work Centre, etc.
For Equipment Re-parenting across the company , Set the deletion Flag and
REPO on existing Equipment and create the new Equipment in new company.
There are four Scenerios in Reparenting process :-
A) Reparenting of Functional Location(FL) within same company:
Step 1 Search the required FL which is to be reparented by T-Code IH01
Step 2 Document approval flow -
i. Create Document (ZRP Type) by T-Code CV01N
fill the type of document ZRP and press enter
In the next screen within document data tab page fill brief description of reparenting FL
as soon as we move to the next tab page one pop menu will appear ,there we have to
filled log field and continue.
In addl data tab page fill current FL and proposed FL (Upto plant),
In Object Link tab page fill equipments & FL(which are to be re-parented) and document
will be generated as soon as we will save the document.
ii.
Go to change document by T-Code CV02N or clicking on change icon and press enter.
fill the document No. ,document type,document part and document version and press
enter.
Change the document status "Data upload(DU)" in the document data tab page.
as soon as we move to the next tab page Reviewers\Approvers, one pop menu will
appear ,there we have to filled log field and continue.
fill Reviewers , go to approver tab page and fill Approver and save.
iii. by T-Code CV02N/Clicking Change icon with enter.
assign the document to reviewer by changing the status Review Request(RR) in
document data tab page and save.
as soon as we save the document one pop menu will appear ,there we have to filled log
field and continue.On saving the SAP Mail will go to Reviewer
iv. Reviewer will open the SAP INBOX and see the mail of request reviewer
Reviewer will come back and click on review ok or review not ok and accordingly fill the
remarks and continue.Now SAP mail reached to next reviewer or Approver.
v. Approver will open the SAP Inbox and see the mail of request approval.
Approver will come back and click approval ok or Reject or clarification required ask for
or cancel& keep in Inbox and continue.
On approval ok or reject, SAP mail reached to Initaitor and reviewers SAP Inbox.
If,the option clarification ask for selected one additional document is generated for
clarification.This document can be sent to iniator or reviewers.
This ZRP document will attached to re-parented equipments and FL in "class and Docs"
note :-
tab page.
Step3 De-asign the Task List from Maintenance Plan by T-Code IP02
Enter Maintenance Plan No and enter
Click on "Cancel asignment for Task list" Icon and save Contd.
Select the Equipment are to be dismentle and click Dismentle Icon on tool bar and save.
Step4 Delete the organisation data from Equipment by T-Code ZPM43
Upload ZPM43 Excel file and execute. This is required when new organisation data is
filled by T-Code IE02.
Step5 Complete Open Maintenance Order by T-Code IW32/IW38 Contd.
Step10
Asset Transfer Script --------Refer FICO Process Script for Asset Transfer
Create new equipment number based on newly created Assetby T-Code
Step11
IE01/ZPMUPLOAD10.
Upload ZPMUPLOAD10 Excel File and execute.
Step 4 Deactivate & Set Deletion Flag for Maintenance Plans (if any) by IP02
Enter Maintenance Plan No and enter
Step17
Create Maintenance Plans (if required) by T-Code IP41/IP42 or ZPMUPLOAD21
Upload ZPMUPLOAD 21 excel and upload.
Step18 Schedule Maintenance Plan (if required)by T-Code IP10
# Information will go to Recom/ Forward Authority , through SMS & Mail / SAP Mail.
# Notification is Created - Note down the Notification number for reference only.
If the authority is competant to approve the Shutdown then he/She will APPROVE it , or
2 Send to Another Approving authority by Recommanding this Notification.
- The authority can maintain the Partner function - for Recom/ Forward Authority - , &
# Maintain User Status to R & F1 ( Recommanded/Forwarded 1 ) and Save it Save
Similarly information will flow to another R & F1 authority and He/She can send Notification
3 to approve , by maintaining the Partner function - for Recom/ Forward Authority - , &
Maintain User Status to R & F2 ( Recommanded/Forwarded 1 ) and Save it Save
Similarly information will flow to another R & F2 authority and He/She can send Notification
to approve , by maintaining the Partner function - for Recom/ Forward Authority OR
4 APPROVAL AUTHORITY - , & Maintain User Status to R & F3 (
Recommanded/Forwarded 1 ) and Save it Save
Now if the Officer is competant to Approve the Shutdown request notification , HE/SHE can
APPROVE by maintaing the USER STATUS - APPROVED - APPD
5 (Approval details are to be recorded as long text by each and every approving authority)
User Staus - REJC can be use for Rejecting the Request.
Take on spot Approval from NMC through telephonically and Change user status to NMCA
6 (NMC should be contacted directly by person responsible for final clearance and set
NMCA/NMCR status)
7 After getting APPROVAL from NMC , put notification in PROCESS by Green flag ( NOPR )
# Click on Catalog Data tab; Object Part & Damage part tab highlighted Press Enter
In Object part Enter Codegrp:- select by search; ex: OFC Press Enter
in Damage part Enter Codegrp:- select by search;ex:- PM1-Damage 1
Enter Assembly text:- About fault occurred Contd…
Click on Causes tab Press Enter
# Click Black & White flag icon on toolbar; Status changes NOCO -NMCA
* If Material or External Service is required , please Refer the Breakdown Maintenance order
procedure
EXERCISE : PM-12
Calibration Maintenance Notification
Calibration Process is used to gauge the accuracy of equipment. Calibration can be
done at the time of installation, at regular intervals , when measurement of equipment is
erratic ,when a malfunction is encountered or if demanded by statutory body.
Calibration may be done by Internal team or by External Agency, both the cases have been
demonstrated.
1.2 Scheduling Mtce Plan & creation of B5 Notification & BM05 Mtce Order.
Enter /nIP10 in Transaction window
By default Mtce plan number appears; if not enter it
Click on Start button at top-left
Enter "start of cycle date" and save
After this system will generate the B5 type Notification, same may be searched from iw22
or iw28
From Notification create the Mtce order as is being done in Breakdonwn Mtce
Thereafter release the Mtce order and save it.Then see the inspection lot Number in Top
right hand using clicking this
Now Note down the inspection lot number. Contd…
Now Open New Transaction QE17 in T.Code, record equipment Results window will come,
thereafter write down Equipment number in the appropriate field
Then Press enter, and enter the inspected quantity as defined and value, press enter
New window will pop up having different valuation,
we may select any of these eg can be used
Now run the T.Code QA11, for record usage decision, enter the Inspection lot and press
enter
Now select the required UD code eg."Accepted" and press Save button.
Now Run the T.code QA13 for viewing of calibration result, then enter inspection lot and
press enter
Then Go to usage decision, print, Inspection print and finally click the execute button
After this go to iw32, then in order Menu, function, and then complete business.Also please
complete the B5 Notification.
2 Calibration by External Agency
2.1 Follow the same steps as has been done in previous case till creation of Mtce order.
Go to change mode in Mtce order using iw32, go to operation tab, then in external service
tab as is being done in Break down Mtce
System will generate the PR(Purchase Requisition, as being done in Break down) further
create the PO(Purchase order)
for taking Vendor service as per MM Manuals.
Thereafter take the service and confirm the Mtce order using iw41, as was done in Break
down.
For attaching the external agency report, go to the Mtce order in change Mode, and click
on the attachment button at top left corner
Then go to create, and then create attachment, thereafter attach the requireddocument.
Then go to iw32 and further go to order menu, then complete and then
complete(technically), then do the complete business, as done earlier.
Finally complete the Calibration Notification.
EXERCISE : PM-14
Corrective Maintenance
Creation of Measuring Point ( Such measuring points are already created and available in
1 the SAP system by MDM team , as this is one time activity. This step is for your information
only . )
Enter /nIK01 in Transaction window
Enter equipment No "103000000896"
Preass
Select Measuring point category as C enter
Fill measuring position- Switch room, Description - Temperature of switch room,
Characteristics- Temperature
Preass
Select code group - CBM enter
Enter target value - 20 (bottom)
Click on additional data button at top left
Entet upper and lower tolerable values , continue and save
Note the measuring point no
2 Similarly you can create another measuring point for voltage
3 Creation of Measuring Document : w.r.t. Measuring point
Enter /nIK11 in Transaction window
By default Measuring point appears; if not , provide the measuring point of the Equipment or FL.
Enter measuring reading - 23
Enter Valuation code- either CM01 or CM02, continue and save
Similarly enter 3 to 4 readings of temperature
4 Viewing Measuring Document
Enter /nIK17 in Transaction window
Enter Measuring point appears and click Execute at top-left
Select the reading column & see the graphic view/bar representation
EXERCISE : PM-15
2. RURAL OR URBAN
2. Purchase Requisition ( PR ) will be generated after Release of this
Maintenance Order.
3. Service PR generated and available in SAP Inbox of the person
releasing the Maintenance Order.Purchase requisition is initiated,
Released or Forwarded and Finally Released as per workflow.
4. All SSAs will communicate their PR’s through SAP Mail for sending to
Their Circle for further compilation. All SSA PR’s will be compiled (manual
in Excel) at Circle Level.
5. At circle level one Final Single PR will be created- ( Consolidate Item &
their Qty. of all PR’s from different SSA are noted and entered manually in
Purchase Requisition with the help of copy and paste functionality.)
6. All Circles will communicate their PR’s through SAP Mail for sending to
Corporate office for further compilation. All these PR’s will be compiled
(manual in Excel) at Corporate Level in the same way as at the circle level ,
and one single PR is created at corporate level taking in account all
services & their quantities as per requirement of SSA / Circle.
( This PR will not be used to create Contract as this has no relevance to PR
released by SSA’s / Circle’s. Corporate PR will serve to compile the requirement.
11. Now different PR’s ( purchase requisition sent by SSA to circle ) will be
assigned to the APO ( Created by Corporate Contract) by circle.( ME56 )
12.Circle office will create different Purchase Order ( PO ) for different SSA
with reference to their PR. These PO’s are release / approved as per
workflow. ( ME21N)
This PO will take the Rate/ Price from APO ( Contract created at corporate
level ) and Quantity of services from PR’s of respective SSA’s.
13. This PO will be updated to equipment master by circle office.
( ZAMC_UPDATE).
14. In Case of ARC gathering & it's updation , SSA will create their purchase
requisition ( PR ) and communicate to Circle office. See above step no. 3 to 11
15. The ARC ( Contract ) will be updated to equipment master through T - Code (
ZARC_UPDATE).
Select the ms excel file as per format
(Starting from third row in the format –
Equipment No. -
ARC_APO no. -
Start Date -
End Date - )
EXERCISE : PM-16
AMC Tracking of Card / CPE:
( one T-code ZCC and radio buttons)
2. Maintain Manufacturer, Type and the ( capacity for cards only ) .
4. Data of OLD cards & CPE are to be uploaded after approval of service PO at SSA
/Circle
5. Final plant and storage location of materials are maintained by the SLOC where the
materials finally received for consumption.
- for cards / component through “EDIT” transaction
- for CPE through “ maintain final storage location “ transaction.
6. Report based on different parameters for tracking AMC/Warranty of Card & CPE are
available using radio button.
EXERCISE : PM-17
34
35
Customized REPORTS
Functional
Location Level 1 Level 2 Level 3 Level 4 Level 5 Level 6 Level 7
Structure FL Structure
Building
Company Code(AB) & Unit/Section
Teritorial Circle Code Plant Code Floor Code( code Plant Section
Offices ( XXXX ) ( xxxx) CD)- ( XXXX) ( XXXX) ( XXX ) xxxx-xxxx-xxxx-xxxX-xxx
Preventive Maintenance B1
Process --- PO will be created w.r.t.
Single Cycle Plan Create Maintenance After release of PR , data will populated
Scheduling Order with PM03 Maintenance order - from APO ,and issued to
Stategy plan control key and PR is gererated and is vendor- Post Down
Technically Complete the
Dead line monitoring reference Available available in SAP inbox (This PO is to be Payment, and Call
ARC ( APO Available) APO , Maintain of person releasing Vendor through Maintenance Order (
INITIATED & TECO-by T-Code : IW32 )
"Agreement " in the M.O. This PR is Vendor docket
M.O. and many to be INITIATED & APPROVED as per MM Details
B
more related APPROVED as per MM Workflow )
parameters. Workflow. ME21N/ME22N/
Creation of Contract by ME29N
Service Master record , Cost Settlement of
MSS etc by Maintenance order by T-
AC03/ML10/ME31K Code : KO88 or KO8G (
Complete the This settlement can be done
If material is not in his Notification after
General Maintenance B3 before TECO status of M.O.)
Maintenance Order will be store, then STOCK transfer
from Main store- ( By
Confirmation
For Inspection JOB created for Material
requirement creating the seperate CNFR/NOCO
notification -
Maintain CODING
C Reservation in Main store - Set various
Mvt. type -913, transfer Maintenance order will be parameters like
OBJECT PART CODE Need Based Requirement (
posting of stock from main Confirmed -IW41 and
DAMAGE CODE For Material only ) Malfunction End
Material will be drawn from store by MIGO Mvt type- Closed after TECO- make full payment to Vendor as per
his own Storage location --- 915, Place in local soragae IW32/KO88 date/time,Catalog PO , and Bill raised Penalty deduction
another notification will be
Reservation number will by MIGO against material e data etc. will be issued to vendor / Invoice
crated w.r.t. Inspection
effective after release of doc (Mvt type-915)). After verification processMIRO/FB03
notification Need base service order)SDE level- MIGO/IW32 this , previous step will be
requirement followed to issue material
D (EXTERNAL) against MO
- CASE
- Notification Type
User guide of PM processes
ANNEXTURE - I
part.
Pre requisite:
Maintenance Order is to be created and released in PRD for the
concerned Maintenance by the concerned person.
1 Create, Assign & Acknowledge the Notification using steps 1 to 3 of EXERCISE
PM-3.1 ( Breakdown Notification )
2 Creating & Approving Order
a) Enter /niw22 in Transaction window
b) By default Notification No. appears; if not enter it- Press Enter
c) Click on Create order icon ; Create order window pops up; click to continue
d) Ignore any message about date and continue
e) Object information window pops up; click to continue
Once the temporary Settlement is submitted to claim officer , then same will be
pending at claim officer for acknowledgement. All the employees in particular SSA
will be attached to particular claim officer and all the settlement submitted by
those employees will be pending at that claim officer only . Now user has to take
printout and attach all the hard copies of the expense bills and submit same to
claim officer
The claim officer first has to acknowledge the receipt of document and afterwards submit
for further approval, if he found it correct.
A) I have a cable fault and about 10 vouchers to claim in temporary advance account.
Whether I have to create 10 maintenance orders?
Ans.: NO. Any number of vouchers can be claimed in temporary advance against a single MO of
that cable.
B) I have a total number of 10 vouchers to claim in temporary advance account. Due to
amount exhausted in current advance, I am able to claim only 4 bills in current
advance. Can I claim remaining bills in next advance without creating an additional
MO?
Ans.: Yes. No need to create additional Maintenance Order. One MO can be linked to any
number of temporary advance accounts.
C) I have created a MO and linked to temporary advance account also. When I have to
set the status of Maintenance Order to TECO?
Ans.: MO created for the purpose of linking expenditure should not be set to the status
TECO, unless, Temporary advance settlement is FINAL APPROVED by the
concerned competent authority. You can always check/track the status by using T-code:
ZFI069_2_2 in display mode by going to History tab.
D) I have already set the status of Maintenance Order to TECO and my temporary
advance account is still not yet approved by the competent authority. What shall I
do?
Ans.: You can cancel the Technical completion by following procedure.
Invoice verification against purchase order is covered in this step, the verification
process is based on purchase order and vendor’s invoice is accepted in the system.
This step of process covers all procurement made against purchase order whether such
procurement for goods, service & Capital goods.
Acceptance of invoice creating the liability for vendor to be paid in the books of
accounts.
You need to enter a purchase order that corresponds with this invoice. Click Purchase
order/scheduling agreement Button . For
Example: PO NO. 4200000482.
Click on the Exit button or press Shift+F3 to return to the SAP Easy Access
Screen.
A vendor made a mistake regarding the quantity to be invoiced and you asked for a credit memo for
material as well as service. Now you received a credit memo and you need to post it.
You need to enter a purchase order that corresponds with this invoice. Click Purchase
order/scheduling agreement Button . For Example:
PO NO. 4200000482.
Enter the Input Data in the mentioned field with the help of below mentioned table
Click the Invoice Document option in the menu bar & select the Reverse option.