This document is a checklist for submitting a Revit model file for the Punggol C6 & C7 project. It includes 15 items to check such as removing unnecessary files, correcting insert points, checking for clashes between ducts/pipes, and standardizing family/view names. The contractor has indicated with check marks that all items have been completed except for purging the model. An interference check was also run between various MEP elements and structures with no clashes found.

Uploaded by

WunNa
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
561 views

CSD Check List

This document is a checklist for submitting a Revit model file for the Punggol C6 & C7 project. It includes 15 items to check such as removing unnecessary files, correcting insert points, checking for clashes between ducts/pipes, and standardizing family/view names. The contractor has indicated with check marks that all items have been completed except for purging the model. An interference check was also run between various MEP elements and structures with no clashes found.

Uploaded by

WunNa
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Model file Check List

Name of Project : Punggol C6 & C7 File Submitted Date : 28/4/2017


Contractor Name : Ken-Pal ☒ Native Revit
Service Name : Basement CSD ☐ dwf
Model File Name : KHOON – ELECT- ☒ pdf

1 Open central file with Detached from Central and Audit selected . ( if No workset is need for submission) ☐
2 Remove non transmittal linked-in file / remove unnecessary imported CAD file ☒
3 Remove all non-required Views / Legends / Schedules / Sheets etc. ☒
4 Remove unwanted Design Options ☒
5 Purge model. ☐
6 Correct Inserting Point ( Grid, Level ). ☒
7 Check Ceiling Height or Head Room Clearance ☒
8 All Riser are Inline/vertical elements are correct position as floor to floor alignment. ☒
9 Graphic: Electrical system to be modelled in "Service Type" and filters with service type ☒
10 Line Pattern - No Override. ☒
11 Tagging size, Annotation and Leader are in to be standardize. ☒
12 Family and View Name as agreed Naming System. ☒
13 Elements/ Service are modelled as agreed method and correct colour code. ☒
14 Service routine are parallel to building out line. ☒
15 Use the TAB key to check the connectivity of your duct, pipe and electrical systems. ☒
16 Interference Checks ( Clash Detection/Report)
Please run Interference check between such as Pipe Vs Pipe, Duct Vs Duct, Pipe Vs Duct and
Structural Column Vs Duct etc. List down all your checked categories in below table.
Categories Categories Result Zero
Clash
example : Duct example : Duct N.A ☒
1 Duct Pipe ☒
2 Duct Cable Tray ☒
3 Pipe Cable Tray ☒
4 Structural Column MEP Elements ☒
5 Structural Lift Core MEP Elements ☒
6 Structural Framing ACMV Duct ☒
7 Structural Framing Pipe Dia 100 and above ☒
8 ELECT ( KHOON) Ken-Pal Mech Model ☒
9 ☐
10 ☐
11 ☐
12 ☐
13 ☐
14 ☐
15 ☐

Checked by :__________________

Approved by : ________________