Trip Coil Supervision Relay
Trip Coil Supervision Relay
Trip Coil Supervision Relay
Clie : SEC-C
COA Riyadh Po
R ower plantt # 10
Connsultant : “1062
21166/00”
Conntractor : BEMCO O
Date:13
D Revision
n:
Doc
c. No.: PP1
10-BS-SU--001 STARTU
UP MANUA
AL F
Feb,09 0
TESTTING PROC
P EDUR
RE FOR
R
TR
RIP CIR
RUIT SUPER
S RVISIO
ON RE
ELAY
Page 378
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc. No: TP-CR01,
TABLE OF CONTENT
1. Task
a. Work Status------------------------------------------------------------------------------------------------2
b. Documentation--------------------------------------------------------------------------------------------2
c. Personnel---------------------------------------------------------------------------------------------------2
d. Measuring Instrumentation-----------------------------------------------------------------------------2
2. Preconditions---------------------------------------------------------------------------------------------------2
3. Precautions------------------------------------------------------------------------------------------------------2
4. Scope--------------------------------------------------------------------------------------------------------------2
5. Execution---------------------------------------------------------------------------------------------------------2
a. Visual Inspection------------------------------------------------------------------------------------------2
b. Testing of Trip Circuit Supervision Relay
1. Electrical Function test
a. Functional check of Test Plug----------------------------------------------------------3
b. Shorting of links on relay case when relay is withdrawn-------------------------3
2. Secondary Injection
a. Voltage Pick-Up Verification--------------------------------------------------------------3
b. Voltage Drop-Out Verification------------------------------------------------------------3
c. Function Check------------------------------------------------------------------------------3
6. Documents-------------------------------------------------------------------------------------------------------4
7. Reference---------------------------------------------------------------------------------------------------------4
8. Attachment-------------------------------------------------------------------------------------------------------4
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by :M AH Page 379
the originator
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc. No: TP-CR01,
1.0 Task
All the Trip circuit supervision relays shall be tested for Breaker trip circuit supervision in
for both breaker open and close position
2.0 Preconditions
2.2 Documentation
• The circuit diagrams of the electrical equipment cabinets are available
• Commissioning checklists TS-CR01
2.3 Personnel
• 1 Commissioning engineer: Engineer or technician with experience in
commissioning of all types of Electrical equipments.
• 1 Helper: skilled worker with adequate on-the-job training.
3.0 Precautions
• Observe the rules for handling electronic components sensitive to electrostatic
discharge (ESD measures).
• Special safety arrangements shall be made for all areas which are not explicitly
designated as” electrical operating areas” when performing tests at voltages in
excess of 50V.
4.0 Scope
• Testing cable connections,
• Checking that the mounting position is correct,
5.0 Execution
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by :M AH Page 380
the originator
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc. No: TP-CR01,
TERMINALS
+
+
COIL
-
-
CONTACT
TIMER
RELAY
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by :M AH Page 381
the originator
Client : SEC-COA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Subject : Testing Procedure Doc. No: TP-CR01,
6.0 Documents
Test sheet TS-CR01 shall be completed for each and every trip circuit supervision Relay.
7.0 References
8.0 Attachment
The above contents may not be reproduced, transmitted, or Originator: BEMCO Services
distributed to any form or by any means with out prior permission of Prepared by :M AH Page 382
the originator
ent
Clie : SEC-C
COA Riyadh Po
R ower plantt # 10
Connsultant : “1062
21166/00”
Conntractor : BEMCO O
Date:13
D Revision
n:
Doc
c. No.: PP1
10-BS-SU--001 STARTU
UP MANUA
AL F
Feb,09 0
TES
ST SHEETS
Page 383
Customer : SEC-EOA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Testing of Form No: TS-CR01
Trip supervision Relay (ABB) Page 1 of 2
Date: 13/02/09,Revision: 0
Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.:
Device No.:
1 Indications checked.
2 All contacts checked.
The limit of supply voltage should be 40 – 265V DC (Table 3 of Buyer’s Guide 1MRS 750 428-MBG).
The drain current should be 7mA (Table 3 of Buyer’s Guide 1MRS 750 428-MBG).
* While testing the drain current, Keep the supply at 11(+) & 21(-) 125V DC.
4.3. Pickup and Dropout Test :
PICK-UP DROP-OFF
TERMINALS
VOLT. MEAS. CURR. MEAS. VOLT. MEAS. CURR. MEAS.
11(+) & 21(-)
Name:
Signature:
Date:
Page 384
Customer : SEC-EOA Riyadh Power plant # 10
Consultant : “10621166/00”
Contractor : BEMCO
Testing of Form No: TS-CR01
Trip supervision Relay (ABB) Page 2 of 2
Date: 13/02/09,Revision: 0
Switch Gear Location Switch gear Name: Switch Gear Tag No: Cubicle No.:
Device No.:
Drop-off voltage should be < 40V DC (Table 1 of Buyer’s Guide 1MRS 750 428-MBG).
TERMINALS VOLTAGE APPLIED CURRENT MEASURED
Typical operate time 3 Sec (Table 2 of Buyer’s Guide 1MRS 750 428-MBG).
Typical reset time 1 Sec (Table 2 of Buyer’s Guide 1MRS 750 428-MBG).
Note:
The timing test should be done at the relay terminal 11(+), 21(-).
During the timing test do not disturb the Aux. Supply at terminal 18(+), 28(-).
For the operating time, the voltage at the terminal should be reduced from 125V DC to 0V DC.
For the resetting time, the voltage at the terminal should be increased from 0V DC to 125V DC.