A) CH - WTR Pumps: Hydraulic Pressure Loss Calculation

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 6

A ) CH.

WTR PUMPS

HYDRAULIC PRESSURE LOSS CALCULATION


PROJECT SOHAR AROMATCIS DATE
BUILDING ADMINISTRATION PREPARED BY
SERVICE CH.WTR PRIMARY PUMP
DRG.NO
PUMP REF CHPP/1A

SECTION DIA ITEM FLOW Qty / TOTAL


LENGTH LOSS
mm lps No./m pa
A-B 150 T 21.0 1 no. 823.00
Pipe 21.0 2.0m 218.00
IV. 21.0 1 no. 228.90
STR 21.0 1 no. 4000.00
Elbow 21.0 1 no. 689.00
Red 21.0 1 no. 196.20
FC 21.0 1 no. 36.00
FC 21.0 1 no. 36.00
Red 21.0 1 no. 196.20
NRV 21.0 1 no. 1993.60
150 IV 21.0 1 no. 228.90
Pipe 21.0 2.0m 218.00
150 T 21.0 1 no. 823.00
150 Pipe 21.0 2.0m 218.00
150 T 21.0 1 no. 823.00
150 Pipe 21.0 1.0m 109.00
150 Elbow 21.0 3 nos 2067.00
150 Pipe 21.0 11.0m 1199.00
B-C 150 Pipe 21.0 13.6m 1482.40

C-D 150 Elbow 21.0 2 nos 1378.00


150 Pipe 21.0 8.5m 926.50
D-E 150 Elbow 21.0 4 nos 2756.00
150 Pipe 21.0 24.0m 2616.00
E-F 150 Elbow 21.0 1 no. 689.00
150 Pipe 21.0 1.0m 109.00
150 Elbow 21.0 1 no. 689.00
150 IV 21.0 1 no. 228.90
150 Pipe 21.0 1.0m 109.00
150/125 Red 21.0 1 no. 196.20
125 FC 21.0 1 no. 36.00
Chiller 21.0 27800.00

125 FC 21.0 1 no. 36.00


150/125 Red 21.0 1 no. 196.20
150 Pipe 21.0 1.0m 109.00
150 DRV 21.0 1 no. 1918.00
A ) CH.WTR PUMPS

HYDRAULIC PRESSURE LOSS CALCULATION


PROJECT SOHAR AROMATCIS DATE
BUILDING ADMINISTRATION PREPARED BY
SERVICE CH.WTR PRIMARY PUMP
DRG.NO
PUMP REF CHPP/1A

SECTION DIA ITEM FLOW Qty / TOTAL


LENGTH LOSS
mm lps No./m pa
150 IV 21.0 1 no. 228.90
150 Elbow 21.0 1 no. 689.00
150 Pipe 21.0 1.0m 109.00
150 Elbow 21.0 1 no. 689.00
150 Pipe 21.0 1.0m 109.00
F-G 150 Pipe 21.0 26.0m 2834.00
Tee 21.0 1 no. 823.00
G- H 150 Pipe 42.0 5.5m 3519.00
Elbow 42.0 1 no. 2608.00
H-I 150 Pipe 42.0 13.6 m 5630.40
I-A 150 Elbow 42.0 1 no. 2608.00
150 Pipe 42.0 1.5m 621.00
150 Elbow 42.0 1 no. 2608.00
150 Pipe 42.0 13.5m 5589.00
150 Elbow-45 42.0 2 nos. 2786.00
150 Pipe 42.0 2.5m 1035.00

SUB TOTAL = 87864.30

ALLOW 20% ( For final regulation = 17572.86


during commisioning)

GRAND TOTAL = 105437.16

CH.WTR PRIMARY PUMP DUTY - 21.0 LPS @ 105.0 KPa


Pa

Pa

Pa
A ) CH.WTR PUMPS

HYDRAULIC PRESSURE LOSS CALCULATION


PROJECT SOHAR AROMATICS DATE
BUILDING ADMINISTRATION PREPARED BY
SERVICE CH.WTR SECONDARY PUMP
DRG.NO
PUMP REF CHSP/1A

SECTION DIA ITEM FLOW Qty / TOTAL


LENGTH LOSS
mm lps No./m. pa
1-2 150 Tee 42.0 1 no. 3114.00
Pipe 42.0 2.0m 828.00
IV 42.0 1 no. 869.40
STR 42.0 1 no. 20000.00
Elbow 42.0 1 no. 2608.00
Red 42.0 1 no. 745.20
FC 42.0 1 no. 136.60
150 FC 42.0 1 no. 136.60
Red 42.0 1 no. 745.20
NRV 42.0 1 no. 7572.10
IV 42.0 1 no. 869.40
Pipe 42.0 2.0m 828.00
T 42.0 1 no. 3114.00
Pipe 42.0 2.5m 1035.00
Elbow 42.0 1 no. 2608.00
Pipe 42.0 2.0m 828.00
Elbow 42.0 1 no. 2608.00
Pipe 42.0 6.0m 2484.00
2-3 150 Pipe 24.54 4.0m 588.00
3-4 150 Pipe 22.76 2.5m 317.50
Elbow 22.76 1 no. 803.00
Pipe 22.76 2.5m 317.50
Elbow 22.76 1 no. 803.00
4-5 150 Pipe 22.76 5.2m 660.40
5-6 150 Pipe 17.44 8.4m 646.80
6-7 150 Elbow 17.44 4nos. 1940.00
150 Pipe 17.44 24.5m 1886.50
7-8 150 Pipe 17.44 8.4m 649.90
8-9 100 Pipe 12.39 5.2m 1430.00
9 - 10 100 Pipe 12.39 3.5 962.50
Elbow 12.39 1 no. 1230.00
100 IV 12.4 1 no. 577.50
10 - 11 50 Tee 1.46 1 no. 403.00
50 Pipe 1.5 11.0m 1551.00
25 Tee 0.05 1 no. 9.00
25 Pipe 0.05 2.5m 15.00
25 IV 0.05 1 no. 12.20
25 STR 0.05 1 no. 244.00
25 FC 0.05 1 no. 3.00
A ) CH.WTR PUMPS

HYDRAULIC PRESSURE LOSS CALCULATION


PROJECT SOHAR AROMATICS DATE
BUILDING ADMINISTRATION PREPARED BY
SERVICE CH.WTR SECONDARY PUMP
DRG.NO
PUMP REF CHSP/1A

SECTION DIA ITEM FLOW Qty / TOTAL


LENGTH LOSS
mm lps No./m. pa
FCU/G30 1 no. 9000.00
25 FC 0.05 1 no. 3.00
25 2Way valve 0.05 1 no. 36.90
25 DRV 0.05 1 no. 60.00
25 IV 0.05 1 no. 12.20
25 Pipe 0.05 2.5m 15.00
25 Tee 0.05 1 no. 9.00
11 - 12 40 Pipe 0.72 11.0m 1243.00
40 Tee 0.72 1 no. 263.00
40/50 Red 0.72 1 no. 203.00
12 - 13 50 Pipe 1.46 32.0m 4512.00
50 Elbow 1.46 3 nos 1011.00
50 DRV 1.46 1 no. 1410.00
50 IV 1.46 1 no. 296.10
50 Tee 1.46 1 no. 403.00
13 - 14 150 Elbow 40.02 1 no. 2375.00
Pipe 40.02 6.0m 2262.00
14 - 1 150 Pipe 42.0 1.0m 414.00
Elbow 42.0 1 no. 2608.00
Pipe 42.0 25.0m 10350.00
Elbow 42.0 1 no. 2608.00
Pipe 42.0 7.0m 2898.00
150 Elbow 42.0 1 no. 2608.00
Pipe 42.0 4.0m 1656.00
Elbow 42.0 1 no. 2608.00
Pipe 42.0 2.0m 828.00
Tee 42.0 1 no. 3114.00
Pipe 42.0 1.5m 621.00
150 IV 42.0 1 no. 228.90
Elbow 42.0 1 no. 2608.00
Pipe 42.0 0.5m 212.00
Tee 42.0 1 no. 3114.00

SUB TOTAL = 125769.40 Pa

ALLOW 20% ( For final regulation = 25153.88 Pa


during commisioning)

GRAND TOTAL = 150923.28 Pa


A ) CH.WTR PUMPS

HYDRAULIC PRESSURE LOSS CALCULATION


PROJECT SOHAR AROMATICS DATE
BUILDING ADMINISTRATION PREPARED BY
SERVICE CH.WTR SECONDARY PUMP
DRG.NO
PUMP REF CHSP/1A

SECTION DIA ITEM FLOW Qty / TOTAL


LENGTH LOSS
mm lps No./m. pa

CH.WTR SECONDARY PUMP DUTY - 42.0 LPS @ 151.0 KPa