100% found this document useful (3 votes)
4K views3 pages

Preliminary Sizing

The document provides a preliminary sizing of structural members for a building including beams with depths of 360-542mm and 305-458mm, slabs with thicknesses of 120-135mm, loads on slabs and beams are determined, column size is calculated as 450x450mm, and final sizes for columns, beams, slabs, and walls are presented.

Uploaded by

Kshitiz Shrestha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
4K views3 pages

Preliminary Sizing

The document provides a preliminary sizing of structural members for a building including beams with depths of 360-542mm and 305-458mm, slabs with thicknesses of 120-135mm, loads on slabs and beams are determined, column size is calculated as 450x450mm, and final sizes for columns, beams, slabs, and walls are presented.

Uploaded by

Kshitiz Shrestha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Preliminary Design:

Preliminary Sizing of Structural Member:


i. Beam
Depth of Beam, Dbeam = 1/10th to 1/15th of span
For Long Span = 1/10th to 1/15th X 5420mm
= 360-542mm
For Short Span = 1/10th to 1/15th X 4580mm
= 305-458mm

Adopting Depth of Beam as 400mm and 450mm


Width of Beam, bbeam = 1/3rd to 2/3rd of depth
= 135-270mm

Adopting Width of Beam as 230mm


Check:
Span < 60xb = 60x230mm = 13800mm (OK) (IS 456:2002 Cl 24.1)

ii. Slab
Thickness of Slab, D = 1/28th to 1/32nd of span
= 1/28th to 1/32nd X 3.82m
= 120-135mm

Hence, adopt slab thickness as 130mm

iii. Loads on Slabs and Beams

a. Self-Wt. of Beam = 25x.405x.23 = 2.33 kN/m


b. Slab
Self-Wt. = 25x.125 = 3.125 kN/m2
Finishing = .025x22 = 0.55 kN/m2
Screed = 0.02x20.4 =0.41 kN/m2
Plaster = 0.01x20 = 0.2 kN/m2
Light Partition = 1 kN/m2
Live Load = 4 kN/m2
c. Self-wt. of other component
Main Wall = 0.23x20x(3.3-0.405) = 13.32 kN/m = 11kN/m (assuming 20% opening)
Partition Wall = 0.115x20x(3.3-0.405) = 6.66 kN/m = 5.5 kN/m (assuming 20% opening)
Parapet = 0.23 x 20 x 1 = 4.6 kN/m

iv. Determination of Column Size:


Tributary Area = 4.3 x 4.9m
Slab Wt. = 3.125 x 4.3 x 4.9 = 65.84 kN
FF Load = 1.5 x 4.3 x 4.9 = 31.6 kN
Live Load = 4 x 4.3 x 4.9 = 84.28 kN
Beam = 25 x 0.23 x 0.405 x 4.3 + 25 x 0.3 x 0.405 x 4.9 = 24.9 kN
Wall = 5.5 x 9.2 = 50.6 kN
Total Load = 7 x 257.22 = 1800.54 kN
Factored Load = 2700.81 kN

Taking % of steel as 2% and fy = 500 N/mm2, fck = 20 N/mm2

According to IS 456:2002 Cl 39.3 for axially loaded column

P = 0.4 x fck x Ac + 0.67 x fy x Ast


2700.81x103 = 0.4 x 20 x Ac + 0.67 x 500 x 0.02 Ac
Ac = 183728 mm2
Size = 430 x 430 mm
Adopted Size = 450 x 450 mm
Ac = 202500 mm2
v. Size of Structural Members:
Structural Member Size
Columns:
Main Columns 450mm X 450mm
2 Columns in Lift 400mm X 150mm
Beams:
Longer Span 300mm X 450mm
Shorter Span 230mm X 400mm
Floor Slab 130mm
Staircase Slab 130mm
Shear Wall 150mm
Retaining Wall 200mm