Material Submittal
Material Submittal
MATERIALS SUBMITTAL
NEW SUBMITTAL SUBMITTAL NO: PREV.SUBMITTAL NO:
Major
CV AR ST AC EL PL OTHER
Attachments
Brochure Tech. Info Sample Certificate Drawing Calculations
Materials/Tools
Material Name,Number & Code
Serial Source Supplier / Manufacturer Specs.Ref Status
Description
CONTRACTOR
Procurement Manager
Name:
Signature:
CONSULTANT NOTES
CONSULTANT CLIENT
Name: Name:
Position: Position:
Signature: Signature:
Date: Date:
APPROVAL SITUATION ِِ
A APPROVED D REJECTED
DATE: DATE:
Client: Original Consultant: Copy with Stamp Contractor: Copy with Stamp Consultant Site Office: Copy
(Authority to proceed with work does not relieve the contractor from contractual responsibilities)
C:/RTCC/FM:CO:901
Page 1 of 3
Contractor Consultant Owner
Riyadh - Saudi Ar
MATERIALS SUBMITTAL
CONTRACTOR
Procurement Manager:
Name:
Signature:
CONSULTANT NOTES
CLIENT CONSULTANT
Name: Name:
Position: Position:
Signature: Signature:
Date: Date:
APPROVAL SITUATION
A APPROVED D REJECTED
Date: Date:
Page 2 of 3
Client: Original Consultant: Copy with Stamp Contractor: Copy with Stamp Consultant Site Office: Copy
(Authority to proceed with work does not relieve the contractor from contractual responsibilities)
Page 3 of 3