This document is a materials submittal form for a construction project. It contains information about the project name and location, as well as details about the materials submittal such as the submittal number, date, reason, major categories, attachments, and materials/tools. The form requires signatures from the contractor's procurement manager and consultant, as well as notes and approval signatures from the consultant and client.

Uploaded by

Ahamed Naufal Ca
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
261 views3 pages

Material Submittal

This document is a materials submittal form for a construction project. It contains information about the project name and location, as well as details about the materials submittal such as the submittal number, date, reason, major categories, attachments, and materials/tools. The form requires signatures from the contractor's procurement manager and consultant, as well as notes and approval signatures from the consultant and client.

Uploaded by

Ahamed Naufal Ca
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

FM:CO:901

Owner Consultant Contractor

HAK Architecture & Al-Rashid Trading &


Engineering Consultant Contracting Company Ltd.

PROJECT NO: LOCATION


PROJECT NAME:

MATERIALS SUBMITTAL
NEW SUBMITTAL SUBMITTAL NO: PREV.SUBMITTAL NO:

RESUBMITTAL: DATE: PREV.SUBMITTAL DATE:

Submittal reason INFO NOTES APPROVAL

Major
CV AR ST AC EL PL OTHER
Attachments
Brochure Tech. Info Sample Certificate Drawing Calculations
Materials/Tools
Material Name,Number & Code
Serial Source Supplier / Manufacturer Specs.Ref Status
Description

CONTRACTOR
Procurement Manager

Name:

Signature:

CONSULTANT NOTES

CONSULTANT CLIENT
Name: Name:
Position: Position:
Signature: Signature:
Date: Date:
APPROVAL SITUATION ِِ
A APPROVED D REJECTED

B APP.WITH COMMENTS E NO ACTION

C APP. AS NOTED/RESUBMITTAL REQUIRED

INCOMING SIGNATURE: OUTGOING: SIGNATURE:

DATE: DATE:

Client: Original Consultant: Copy with Stamp Contractor: Copy with Stamp Consultant Site Office: Copy
(Authority to proceed with work does not relieve the contractor from contractual responsibilities)
C:/RTCC/FM:CO:901

Page 1 of 3
Contractor Consultant Owner

Riyadh - Saudi Ar
MATERIALS SUBMITTAL

Project No: Location:


Project Name:
¨ New Submittal Submittal No: Prev. Submittal No:
¨ Resubmittal Date: Prev. Submittal Date:
Submittal Reason ¨ APPROVAL ¨ NOTES ¨ INFO
Major ¨ CV ¨ AR ¨ ST ¨ EL ¨ AC ¨ PL
¨ OTHER
Attachments ¨ Brochure ¨ Certificate ¨ Drawing
¨ Tech. Info ¨ Sample ¨ Calculations
Materials/Tools
Material Name,Number &
SN Source Supplier / Manufacturer Specs.Ref Code Status
Description

CONTRACTOR
Procurement Manager:
Name:
Signature:
CONSULTANT NOTES

CLIENT CONSULTANT
Name: Name:
Position: Position:
Signature: Signature:
Date: Date:
APPROVAL SITUATION

A APPROVED D REJECTED

B APP.WITH COMMENTS E NO ACTION

C APP. AS NOTED/RESUBMITTAL REQUIRED

INCOMING Signature: OUTGOING: Signature:

Date: Date:

Page 2 of 3
Client: Original Consultant: Copy with Stamp Contractor: Copy with Stamp Consultant Site Office: Copy
(Authority to proceed with work does not relieve the contractor from contractual responsibilities)

Page 3 of 3

You might also like