Corrosion Coupan Check List
Corrosion Coupan Check List
Corrosion Coupan Check List
Rep. No.
CORROSION COUPON INSTALLATION Proj, Int. ID.
INSPECTION CHECK LIST Form – IQ Form E037
6. CHECK THE PIPE HOLE IS CORRECT SIZE WITH FITTING AND CLEAN FOR WELD
7. CHECK THE DISC COUPON & HOLDER REMOVED FROM THE FITTING DURING WELDING
larger sized holes.
8. CONFORM THE FITTING IS IN12” O” CLOCK POSITION PRIOR TO WELD
stress relieving operations.
9. ENSURE THAT THERE WILL BE ADEQUATE CLEARANCE ABOVE THE FITTING
TO OPERATE THE RETRIEVER.
10. CHECK THE WELDING RODS APPROPRIATE TO THE FITTING AND LINE MATERIAL.
11. CHECK FITTING MUST BE RAISED OFF THE SURFACE OF THE PIPE WALL TO
ESTABLISH A PROPER WELD GAP.
12. CHECK PENETRANT TEST TO BE COMPLETE AFTER COMPLETION OF WELD
13. HYDROTEST CARRIEDOUT WITHOUT INSTALL DISC COUPON HOLDER & DISC
COUPON.
14. CONFIRM THE DISC, DISC COUPON ACCESSORIES ARE FIXED AS PER
VENDOR ASSEMBLY DRAWING
15. CHECK FOR PROPECTIVE COVER INSTALLED.
Note: P=POSITIVE N=NEGATIVE N/A = NOT APPLICABLE
FOREMAN - CONTRACTOR QC - CONTRACTOR QC - ENI QC - ZFOD