0% found this document useful (0 votes)
54 views1 page

Tour Plan

This tour plan outlines inspection activities from March 6-12, 2017. The focal person will develop inspection lists for plant equipment, determine if the current round of inspections is complete for each area and line, and decide the time intervals for future inspections. They will also identify maintenance inspection activities and develop equipment lists for any non-listed equipment in the computerized maintenance management system.

Uploaded by

M Hamza Nadeem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views1 page

Tour Plan

This tour plan outlines inspection activities from March 6-12, 2017. The focal person will develop inspection lists for plant equipment, determine if the current round of inspections is complete for each area and line, and decide the time intervals for future inspections. They will also identify maintenance inspection activities and develop equipment lists for any non-listed equipment in the computerized maintenance management system.

Uploaded by

M Hamza Nadeem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Tour Plan

AGENDA

Development of Inspection Lists for the


Duration
plant equipment.
06-03-2017 - 12-03-2017 Determine completion of round of
equipment inspection for each area and
Focal Person line.
Determine time intervals at which
inspections of equipment will be done.
Determine inspection activities to be
carried out by Maintenance department
Development of equipment lists for the
non-listed equipment’s in CMMS.
Verification of the equipment lists
provided