This document outlines 37 checklists for pre-commissioning tests, site tests, and energizing procedures for substation equipment. The checklists cover a wide range of topics including lists of testing equipment and their functions, safety procedures, inspection requirements, test standards, documentation, spares availability, communication protocols, troubleshooting, and training responsibilities. The checklists are intended to standardize testing, inspection, and energization processes for new and existing substation equipment.

Uploaded by

sgshekar30
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
129 views2 pages

Checklist PC PDF

This document outlines 37 checklists for pre-commissioning tests, site tests, and energizing procedures for substation equipment. The checklists cover a wide range of topics including lists of testing equipment and their functions, safety procedures, inspection requirements, test standards, documentation, spares availability, communication protocols, troubleshooting, and training responsibilities. The checklists are intended to standardize testing, inspection, and energization processes for new and existing substation equipment.

Uploaded by

sgshekar30
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

CHECK LISTS FOR PRE-COMMISSIONING, SITE

TESTS AND ENERGIZING:-


2013

1. List of equipment’s used in substations & description of it.


2. List of Testing kits available in R.T. Its application & complete
functionality.
3. Operating procedures & safety measures for each testing kit.
4. Safety measures to be taken before carrying testing on test equipment’s.
5. Standard Procedure for carrying testing on different equipment’s.
6. Standard Formats for carrying tests on different equipment’s.
7. Factory inspection check lists for new equipment’s.
8. Factory inspection check lists for failed equipment’s.
9. Site inspection check list.
10. Factory test procedures for each equipment in different companies.
11. Pre-commissioning procedures for different equipment’s.
12. Substation equipment test result limiting values. (Band width).
13. Check list of Documents/manuals to be available on-site before
commencement of testing.
14. Checklist of Physical verification for erection of equipment as per
drawing before testing.
15. Checklist for Scheme check for all schemes.
16. Checklist for Interlocks check.
17. Documentation of lifespan of equipment. (Warranty as per DWA).
18. Standards for carrying different tests on each equipment.
19. Clearance for testing.
20. Energisation procedures.
21. Testing procedures for testing of equipment’s durng failure.
22. Pricing of each test.
23. Positioning of each equipment in substation.
24. Operational Strategy in Case of Line Trips/Auto-reclosure/LBB/BB
protection operation.
25. Shutdown procedures ( sequence of operations for shutdown of line)
26. Power restoration procedures (Charging & Synchronising Procedures).
CHECK LISTS FOR PRE-COMMISSIONING, SITE
TESTS AND ENERGIZING:-
2013

27. Guidelines to substations regarding each equipment.


28. Condition Monitoring and Diagnostic Techniques for different
equipment’s.
29. Augmentation procedures & guidelines.
30. Evolution of procedure to monitor maintenance activity in substations.
31. checklist of Spares availability for each sub-station during R.T visit.
32. checklist of Communication protocols to be tested on SAS supported
equipment’s.
33. Checklist for oil leakage in equipment’s.
34. checklist for routine tests to be conducted.
35. checklist for Inspection to be carried out.
36. checklist for troubleshooting different equipment’s.(Trouble-shooting
chart)
37. Training/Demo on new equipment’s introduced in KPTCL to all R.T
Engineers.
38. Responsibility of training Testing engineers/personnel.
39. Testing glossary.
40. Important formulas to compute test results.
41. Control circuit study.

You might also like