Office of The Investment Board: BICC Complex, New Baneshwor, Kathmandu, Nepal

The document outlines the costs for hiring international and local experts for an unspecified project in Nepal. It lists 7 types of international experts needed for 45-10 days each at a daily rate of 35,000 NPR, totaling 3.3 million NPR. It also lists 7 types of local experts needed for 1-3 months each at monthly rates of 55,000-75,000 NPR, totaling 1.1 million NPR. Administrative costs are estimated at 25% of the total costs. The grand total budget outlined is 4.6 million NPR.

Uploaded by

Bidur Gautam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
195 views2 pages

Office of The Investment Board: BICC Complex, New Baneshwor, Kathmandu, Nepal

The document outlines the costs for hiring international and local experts for an unspecified project in Nepal. It lists 7 types of international experts needed for 45-10 days each at a daily rate of 35,000 NPR, totaling 3.3 million NPR. It also lists 7 types of local experts needed for 1-3 months each at monthly rates of 55,000-75,000 NPR, totaling 1.1 million NPR. Administrative costs are estimated at 25% of the total costs. The grand total budget outlined is 4.6 million NPR.

Uploaded by

Bidur Gautam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Office of the Investment Board

BICC Complex, New Baneshwor, Kathmandu, Nepal

A. International Experts
Man
SN Particular Required no.
Days/Expert
1 Industrial Expert 1 45
2 Legal Expert 1 10
3 Financial Expert 1 10
4 Civil Engineer 1 10
5 Architect 1 10
6 Environmental Expert 1 10
7
8
Total

B.Local Experts
Man
SN Particular Required no.
Months/Expert
1 Industrial Expert (Team Leader) 1 3
2 Legal Expert 1 1
3 Sociology/Community Expert 3 1
4 Financial Expert 3 1
5 Civil Engineer 3 1
6 Architect 3 1
7 Environmental Expert 3 1
8
Total

C. Administrative Cost (25% of the total costs)

Total (A+B+C)
Total Amount in Figure : NPR Four million six thousand two hundred and fifty

Note:
*All cost are indicative
*All costs are presented in NPR
nt Board
hmandu, Nepal

Remuneration/
Total
Day
35,000.00 1,575,000.00
35,000.00 350,000.00
35,000.00 350,000.00
35,000.00 350,000.00
35,000.00 350,000.00
35,000.00 350,000.00

3,325,000.00

Remuneration/
Total
Month
75,000.00 225,000.00
55,000.00 55,000.00
55,000.00 165,000.00
55,000.00 165,000.00
55,000.00 165,000.00
55,000.00 165,000.00
55,000.00 165,000.00
-
1,105,000.00

1,107,500.00

5,537,500.00