Issued 05-14
Release all air from the air systems before you remove any Figure 1
meritorwabco.com Figure 1
Tools and Supplies Required 2. Check for water contamination and physical damage to the
electrical pins on both the ECAD solenoid electrical 4-way and
앫 Air gauge — 200 psi (13.8 bar) minimum on the vehicle’s wiring harness 4-way connector.
앫 Power supply — 12 volt 3. Connect the Test Wire Harness 4-way connector to the ECAD
앫 Air supply — 120-140 psi (8.27-9.7 bar) with shut-off valve solenoid electrical 4-way.
앫 Air tank — one gallon (3.8 l) minimum 4. Use a volt/ohm meter to test solenoid resistance as follows.
Select electrical resistance (Ω Ohm), and set the scale
앫 Multimeter (Volt/Ohm meter) according to the range values measured in the following steps.
Figure 2 and Figure 3.
A. Test between brown test lead Pin 1 and red test lead Pin Figure 4
6. Connect shop air with a closed shut-off valve to the inlet (port
HARNESS 4-WAY 1). The shut-off valve should be mounted between the air
CONNECTOR supply and ECAD inlet (port 1).
7. Connect an air gauge to signal (port 4).
8. Connect a one-gallon (3.8 l) or larger air tank to the dryer outlet
GREEN- (port 2).
TEST LEAD
BROWN- FOR PIN 3 9. Open the inlet valve supplying shop air to the dryer and verify
TEST LEAD RED-TEST LEAD the following.
FOR PIN 1 FOR PIN 4
(SOLENOID ELECTRICAL PIN 2 NOT REQUIRED) 앫 There are no air leaks from the dryer.
WIRE TEST HARNESS (EXAMPLE ONLY) 4011254a
앫 The air tank fills with air.
Figure 2 앫 The signal gauge does not move.
Figure 3
10. Close the inlet valve and supply 12 volts to red test lead Pin 4
of the solenoid and ground test lead Pin 3, then verify the
PIN 2 NOT
REQUIRED following.
앫 The dryer purges, then stops leaking.
앫 The signal gauge rises to the tank pressure.
PIN 4 11. Remove the ground from green test lead Pin 3, then verify that
(RED) the signal gauge falls to 0 psi.
PIN 1 12. Ground green test lead Pin 3 and brown test lead Pin 1 of the
(BROWN)
solenoid connector (with 12 volts on red test lead Pin 4 still in
PIN 3 (GREEN) place) and verify the following.
ECAD ASSEMBLY – SOLENOID 앫 The tank drains through the purge valve slowly (desiccant
ELECTRICAL 4-WAY PIN OUT 4011255a
regeneration). The purge valve will close at its minimum
Figure 3 setting, retaining some pressure on the air gauges,
generally around 35-70 psi (2.41-4.8 bar). This is normal.
5. Disconnect the air dryer inlet (port 1), signal (port 4) and outlet 13. If the dryer passes the above tests, the dryer is functioning
(port 2) lines. Figure 1 and Figure 4. correctly. Replace the connections to the air dryer and return to
service.
If the air dryer did not pass any of the tests, record the results
and call the Meritor OnTrac™ Customer Call Center at
(866) OnTrac1 (668-7221).
TP-1474
Issued 05-14 (16579)
Page 2 Copyright Meritor, Inc., 2014 Printed in USA
Meritor WABCO Vehicle Control Systems Information contained in this publication was in effect at the time the publication was approved for printing and is subject to
2135 West Maple Road change without notice or liability. Meritor WABCO reserves the right to revise the information presented or to discontinue the
Troy, MI 48084-7121 USA production of parts described at any time.
866-OnTrac1 (668-7221)
Copyright 2014 TP-1474
meritorwabco.com
Meritor, Inc. Issued 05-14
All Rights Reserved Printed in USA (16579)