Precedence Diagram Method: Contract Id No.: Contract Name: Contractor: Contract Duration
Precedence Diagram Method: Contract Id No.: Contract Name: Contractor: Contract Duration
Precedence Diagram Method: Contract Id No.: Contract Name: Contractor: Contract Duration
:
CONTRACT NAME :
CONTRACTOR :
CONTRACT DURATION :
2 B.5 2 6 B.17 15 10 101 (1) 7 14 103 (2) b 30 16 104 (1) b 18 20 404 (1) b 40 24 405 (1) a2 25 27 105 (1) a 10 30 311 (1) c1 15 32 603 (3) a1 4 35 B.9 3
Reinforcing Steel Grade PCC Pavement Metal Guardrail
` Temporary ` Removal of Embankment from ` Subgrade
Project Billboard / Bridge Excavation 60 (Bridges Structures Structural Concrete (Unreinforced) (Metal Beam)
Diversion of Structures and Roadway Excavation Preparation Demobilization
Signboard (Soft Rock) and other Major 20.68 MPa A 14 days 0.23 m thick, 14 Including Post W-
Waterway Obstruction (Soft Rock) Structures) Common Material
days Beam
3 5 3 18 25 32 32 62 62 80 82 122 125 150 158 168 172 187 192 196 198 201
3 5 3 18 25 32 32 62 62 80 82 122 125 150 158 168 172 187 192 196 198 201
4 A.1.1 (11) 2 7 A.1.4 (1) 198 11 102 (2) 7 15 103 (2) c 30 17 104 (2) d 18 21 505 (2) a 19 25 405 (1) b2 25 28 200 (1) 10 31 401 (2) a 5 33 603 (4) b 4
Provision of
Provision of Structural Concrete 27.58
Furnitures/Fixtures, ` ` ` Embankment from ` `
Surplus Common Bridge Excavation Grouted Riprap MPa A 14 days (Major Aggregate Concrete Railing Metal Beam End
Equipment & Appliances Progress Borrow Granular
for the Field Office for Excavation (Hard Rock) Coarse Material
Class "A" Structures-Bridges Subbase Course Standard Piece Bull Nose
Photographs Superstructure)
the Engineer
3 5 3 201 25 32 32 62 62 80 82 101 125 150 158 168 187 192 192 196
3 5 3 201 25 32 32 62 62 80 82 101 125 150 158 168 187 192 192 196
3 A.1.1 (3) 7 8 B.7 198 12 103 (1) a 7 18 103 (3) 2 22 506 (1) 40 26 405 (5) 8 29 412 (1) 4 34 612(1) 2
Reflectorized
Construction of Occupational ` Structure ` `
Seal Concrete Elastomeric Thermoplastic
Field Office for the Safety and Health Excavation Foundation Fill Stone Masonry
(deposited in water) Bearing Pads Pavement
Engineer Program (Common Soil)
Markings (White)
3 10 3 201 25 32 80 82 82 122 150 158 168 172 196 198
3 10 3 201 25 32 80 82 82 122 150 158 168 172 196 198
13 103 (1) b 7
Structure
Excavation (Soft
Rock)
25 32
25 32
+191
PREPARED BY: CHECKED BY: REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY:
Proprietor Project Engineer Chief, Construction Section Assistant District Engineer District Engineer