Forced Draught Gas Burners: One-Stage Operation
Forced Draught Gas Burners: One-Stage Operation
Forced Draught Gas Burners: One-Stage Operation
安装,使用和维护说明书
One-stage operation
一段火运行
GENERAL WARNINGS
The dimension of the boiler’s combustion chamber must respond to specific values, in order to guarantee a
combustion with the lowest polluting emissions rate.
You are therefore advised to consult the Technical Assistance Department before choosing this type of burn-
er for the combination with a boiler.
Qualified personnel are those with the professional and technical requirements indicated by Law no. 46
dated 5 March 1990. The commercial organisation has a widespread network of agencies and technical of-
fices whose personnel participates periodically in instructional and refresher courses at the company train-
ing centre.
This burner must only be used for the application it was designed for.
The manufacturer cannot accept responsibility for any damage to persons, animals or property due to errors
in installation or in the burner adjustment, or due to improper or unreasonable use or non-observance of the
technical instructions enclosed with the burner, or due to the intervention of unqualified personnel.
USER INFORMATION
If faults arise in firing or operation, the burner performs a "safety stop", which is signalled by the red burner
lockout LED. To rearm start-up conditions, press the reset button. When the burner starts up again, the red
LED goes out.
This operation can be repeated for a maximum of 3 times. If the "safety stop" recurs, then the Technical
Assistance Centre must be contacted.
1
TECHNICAL DATA
MODEL RS 34/1 MZ RS 44/1 MZ
TYPE 886 T 873 T
OUTPUT (1) kW 70 - 390 100 - 550
Mcal/h 60 - 336 86 - 473
FUEL NATURAL GAS: G20 - G21 - G22 - G23 - G25
G20 G25 G20 G25
- net calorific value kWh/Sm3 9.45 8.13 9.45 8.13
Mcal/Sm3 8.2 7.0 8.2 7.0
- absolute density kg/Sm3 0.71 0.78 0.71 0.78
- max. delivery Sm3/h 35 40 49 57
- pressure at maximum delivery (2) mbar 13,1 18,4 16,7 23,2
OPERATION • On-Off (1 stop min each 24 hours).
• One stage (all - nothing)
STANDARD APPLICATIONS Boilers: water, steam, diathermic oil
AMBIENT TEMPERATURE °C 0 - 40
COMBUSTION AIR TEMPERATURE °C max 60
ELECTRICAL SUPPLY V 230 ~ +/-10%
Hz 50/60 - single-phase
ELECTRIC MOTOR rpm 2800/3400 2820/3400
W 300 420
V 220 - 240 220 - 240
A 2.4 3
ACCELERATION CURRENT A 15 17
WORKING CURRENT A 3.2 3.5
MOTOR CAPACITOR F/V 12.5/400 12.5/450
IGNITION TRANSFORMER V1 - V2 230 V - 1 x 15kV
I1 - I2 1 A - 25mA
ELECTRICAL OUTPUT CONSUMPTION W max 600 700
PROTECTION LEVEL IP 40
IN CONFORMITY WITH EEC DIRECTIVES 90/396 - 2004/108 - 2006/95 - 2006/42
SOUND PRESSURE dBA 68 70
NOISE (3)
SOUND POWER 79 81
APPROVAL CE 0085BR0380 0085BR0380
(1) Reference conditions: Ambient temperature 20°C - Gas temperature 15°C - Barometric pressure 1013 mbar - Altitude 0 m a.s.l.
(2) Pressure at the socket 8)(A)p.4 with zero pressure in the combustion chamber, at the maximum output of the burner.
(3) Noise emission tests carried out as specified in EN 15036-1 with measurement accuracy σ = ± 1.5 dB, in the manufacturer's combustion
chamber with burner operating on test boiler at maximum output.
Blast tube
Model COUNTRY CATEGORY
length mm
216 IT - AT - GR - DK - FI - SE II2H3B/P
RS 34/1 MZ
351 ES - GB - IE - PT II2H3P
216 NL II2L3B/P
RS 44/1 MZ
351 II2Er3P
FR
DE II2ELL3B/P
BE I2E(R)B, I3P
LU II2E 3B/P
2
ACCESSORIES (optional):
• RADIO DISTURBANCE PROTECTION KIT
If the burner is installed in places particularly subject to radio disturbance (emission of signals exceeding 10 V/m) owing to the presence of an
INVERTER, or in applications where the length of the thermostat connections exceeds 20 metres, a protection kit is available as an interface
between the control box and the burner.
BURNER RS 34/1 MZ - RS 44/1 MZ
Code 3010386
• KIT LONG HEAD
BURNER RS 34/1 MZ RS 44/1 MZ
Code 3010428 3010429
• KIT FOR LPG OPERATION: the kit allows the RS 34-44/1 MZ burners to burn LPG.
BURNER RS 34/1 MZ RS 44/1 MZ
Output kW 80 - 390 kW 120 - 530 kW
Blast tube length mm 216 - 351 216 - 351
Code 3010423 3010424
• GAS TRAIN ACCORDING TO EN 676 (with valves, pressure governor and filter): see page 10.
NOTE: The installer is responsible for the addition of any safety device not foreseen in this manual.
3
BURNER DESCRIPTION (A)
1 Combustion head
2 Ignition electrode
3 Screw for combustion head adjustment
4 Sleeve
5 Minimum air pressure switch
(differential operating type)
6 Flame sensor probe
7 Air pressure test point
D11831 8 Gas pressure test point and head fixing
screw
9 Screw securing fan to pipe coupling
10 Slide bars for opening the burner and
inspecting the combustion head
11 Indexed selector.
Opens the fan gate to the value needed by
the burner delivery.
12 Pressure test point of
13 Air inlet to fan
14 Gas input pipework
15 Gas train connection flange
16 Boiler fixing flange
17 Flame stability disc
18 Flame inspection window
19 Motor capacitor (RS 34/1 MZ)
20 Control box with lockout pilot light and lock-
out reset button
21 Plugs for electrical wiring
22 Air damper
23 Plug-socket on ionisation probe cable
Note
If the control box 20)(A) pushbutton (red led)
lights up, it indicates that the burner is in lock-
out.
To reset, hold the pushbutton down for between
1 and 3 seconds.
D3831
(C)
mm A D E F (1) H I L O N V M
RS 34/1 MZ 442 422 508 216-351 140 305 138 780 84 177 1”1/2
RS 44/1 MZ 442 422 508 216-351 152 305 138 780 84 177 1”1/2
4
FIRING RATES (A)
The burner output must be selected within the
comb. chamber pressure mbar area of the adjacent diagrams.
Attention
the FIRING RATE value range has been
obtained considering an ambient temperature of
20 °C, and an atmospheric pressure of
1013 mbar (approx. 0 m a.s.l.) and with the
combustion head adjusted as shown on page 9.
COMMERCIAL BOILERS
The burner/boiler combination does not pose
any problems if the boiler is CE approved and its
combustion chamber dimensions are similar to
comb. chamber pressure mbar
(A) D8589
length of comb. chamber m
Mcal/h
kW
(B) D497
5
RS 34/1 MZ One-stage gas train p (mbar) GAS PRESSURE
The adjacent tables show minimum pressure
2 losses along the gas supply line depending on
the burner output.
kW 1 MBC-DLE-120 MB 407 S2 MB 410 S2 MB 412 S2 MB 415 S2 MB 420 S2
Column 1
(Rp 3/4") (Rp 3/4") (Rp 1.1/4") (Rp 1.1/4") (Rp 1.1/2") (Rp 2")
Pressure loss at combustion head.
70 0,6 5,2 3,0 -- -- -- -- Pressure of the gas at the socket 1)(B)p.7, with
combustion chamber at 0 mbar.
75 0,6 5,6 3,4 2,1 -- -- --
100 1,0 8,2 5,6 2,9 -- -- -- Column 2
Pressure loss of gas train 2)(B)p.7 includes: one
125 1,4 11,1 8,0 4,2 2,1 -- -- stage or two stage adjustment valve VR, safety
150 2,4 15,7 11,0 5,6 2,8 -- -- valve VS (both fully open), pressure governor R,
175 3,5 21,1 14,4 7,2 3,6 -- -- filter F.
200 4,6 27,2 18,1 9,0 4,5 -- -- The values shown in the various tables refer to:
natural gas G 20 PCI 9.45 kWh/Sm3
225 5,8 33,9 22,1 11,0 5,5 3,2 --
(8.2 Mcal/Sm3)
250 6,9 41,3 26,4 13,2 6,5 3,3 -- With:
275 8,0 49,4 31,3 15,5 7,6 3,8 -- natural gas G 25 PCI 8.13 kWh/Sm3
300 9,1 58,0 36,6 18,0 8,7 4,3 -- (7.0 Mcal/Sm3)
multiply the values of the table:
325 10,2 67,2 42,2 20,5 9,9 4,8 3,2 - column 1: by 1.5;
350 11,3 76,7 47,8 22,9 11,2 5,4 3,4 - column 2: by 1.35.
375 12,4 86,7 53,7 25,4 12,7 5,9 3,8 Calculate the approximate maximum output of
390 13,1 57,4 27,0 13,5 6,3 4,0 the burner in this way:
- subtract the combustion chamber pressure
RS 44/1 MZ One-stage gas train p (mbar) from the gas pressure measured at test
point 1)(B)p.7.
2 - Find, in the table relating to the burner con-
kW 1 cerned, the pressure value closest to the
MB 407 S5 MB 410 S5 MB 412 S2 MB 415 S2 MB 420 S2 result of the subtraction.
(Rp 3/4") (Rp 1.1/4") (Rp 1.1/4") (Rp 1.1/2") (Rp 2") - Read the corresponding output on the left.
100 0,2 5,6 2,9 2,1 3,2 3,2 Example - RS 34/1/M MZ:
150 1,6 11,0 5,6 2,8 3,2 3,2 • Maximum output operation
200 3,0 18,1 9,0 4,5 3,2 3,2 • Natural gas G 20 PCI 9.45 kWh/Sm3
• Gas pressure at test point 1)(B)p.7 =8.9 mbar
250 4,9 26,4 13,2 6,5 3,3 3,2 • Pressure in combustion chamber = 2 mbar
300 6,9 36,6 18,0 8,7 4,3 3,2 8.9 - 2 =6.9 mbar
An output of 250 kW shown in table RS 34/1
350 8,9 47,8 22,9 11,2 5,4 3,4
corresponds to 6.9 mbar pressure, column 1.
400 10,8 59,9 28,1 14,0 6,5 4,1 This value serves as a rough guide; the effective
450 12,8 73,2 33,6 16,8 7,7 4,9 delivery must be measured at the gas meter.
500 14,7 87,6 39,5 19,8 9,0 5,7 To calculate the required gas pressure at test
550 16,7 103,0 45,8 23,1 10,2 6,6 point 1)(B)p.7, set the output required from the
burner:
RS 34/1 MZ Two-stage gas train p (mbar) - Find the nearest output value in the table for
the burner in question.
2 - Read, on the right (column 1) the socket
pressure 1)(B)p.7.
kW 1 MB-ZR 407 S2 MB-ZR 410 S2 MB-ZR 412 S2 MB-ZR 415 S2 MB-ZR 420 S2 - Add this value to the estimated pressure in
(Rp 3/4") (Rp 1") (Rp 1.1/4") (Rp 1.1/2") (Rp 2") the combustion chamber.
70 0,6 3,0 2,1 2,1 -- -- Example - RS 34/1 MZ:
75 0,6 3,4 2,1 2,1 -- -- • Required burner output: 250 kW
• Natural gas G 20 PCI 9.45 kWh/Sm3
100 1,0 5,6 2,9 2,1 -- -- • Pressure of the gas at an output of 250 kW, from
125 1,4 8,0 4,2 2,1 -- -- the table RS 34/1 MZ, column 1 =6.9 mbar
150 2,4 11,0 5,6 2,8 -- -- • Pressure in combustion chamber = 2 mbar
6.9 + 2 =8.9 mbar
175 3,5 14,4 7,2 3,6 -- -- pressure required at test point 1)(B)p.7.
200 4,6 18,1 9,0 4,5 -- --
225 5,8 22,1 11,0 5,5 3,2 --
250 6,9 26,4 13,2 6,5 3,3 --
275 8,0 31,3 15,5 7,6 3,8 --
300 9,1 36,6 18,0 8,7 4,3 --
325 10,2 42,2 20,5 9,9 4,8 3,2
350 11,3 47,8 22,9 11,2 5,4 3,4
375 12,4 53,7 25,4 12,7 5,9 3,8
390 13,1 57,4 27,0 13,5 6,3 4,0
(A)
6
RS 44/1 MZ Two-stage gas train p (mbar)
2
kW 1 MB-ZR 410 S2 MB-ZR 412 S2 MB-ZR 415 S2 MB-ZR 420 S2
(Rp 1") (Rp 1.1/4") (Rp 1.1/2") (Rp 2")
100 0,2 2,9 2,1 -- --
150 1,6 5,6 2,8 -- --
200 3,0 9,0 4,5 3,2 --
250 4,9 13,2 6,5 3,3 --
300 6,9 18,0 8,7 4,3 3,2
350 8,9 22,9 11,2 5,4 3,4
400 10,8 28,1 14,0 6,5 4,1
450 12,8 33,6 16,8 7,7 4,9
500 14,7 39,5 19,8 9,0 5,7
550 16,7 45,8 23,1 10,2 6,6
(A)
3
D8065
2
F VS R VR
(B)
7
INSTALLATION
1 2 3 4 5
THE BURNER MUST BE INSTALLED
! IN CONFORMITY WITH LEGISLATION
AND LOCAL STANDARDS.
ATTENTION
! Proceed with the assembly of the
inner part 2)(E) of the combustion
D3835
head, tightening the screw 1)(E) with
a tightening torque of 4 ÷ 6 Nm.
(E)
8
COMBUSTION HEAD SETTING
Installation operations are now at the stage
where the blast tube and sleeve are secured to
the boiler as shown in fig. (A). It is therefore par-
ticularly easy to adjust the combustion head.
Air adjustment (A - B)
Rotate the screw 1)(A) until the notch on the
lamina 2)(A) corresponds with the surface of the
plate 3)(A).
Example:
RS 44/1 MZ burner, output = 300kW.
From diagram (B) you can see that, for the MAX
output of 300 kW, the air should be adjusted at
notch 4, subtracted from the value of the pres-
sure in the chamber. In this case, the loss of
pressure in the combustion head is shown in col-
umn 1 on page 6 - 7.
Note
If the pressure in the chamber is equal to 0 mbar,
(A) D8458 the air is adjusted with reference to the broken
line of the diagram (B).
N° Notches (air = gas) Central air adjustment (A - C)
n case the application needs a particular setup,
it is possible to modify the central air delivery
using the ring nut 4)(A) up to the notch indicated
in diagram (C).
In order to carry out this operation, unscrew the
screws 5)(A) and lift up the ring nut 4)(A). At the
end, tighten the screws 5)(A) again.
Once you have finished adjusting the head,
reassemble the burner 4)(D) on the guides 3)(D)
at about 100mm from the pipe coupling 5)(D) -
burner in the position shown in fig. (C)p.8 -
insert the cable of the probe and the cable of the
electrode, then slide the burner as far as the
pipe coupling, burner in the position shown in
Max burner output fig. (D).
Refit the screws 2) on the guides 3).
(B) D7565
Fix the burner to the pipe coupling with the
screw 1).
D7566
(D)
9
GAS FEEDING LINE
• The gas train must be connected to the gas
attachment 1)(A), using the flange 2), gasket
3) and screws 4) supplied with the burner.
• The gas train can enter the burner from the
right or left side, depending on which is the
most convenient, see fig. (A).
• The gas solenoids must be as close as possi-
ble to the burner, to ensure that the gas
reaches the combustion head within the safety
time of 3s.
10
ADJUSTMENTS BEFORE FIRST FIRING
MIN GAS PRESSURE SWITCH AIR PRESSURE SWITCH
! ATTENTION
THE FIRST FIRING MUST BE CARRIED OUT
BY QUALIFIED PERSONNEL WITH THE
RIGHT INSTRUMENTS.
Adjustment of the combustion head, and air and
gas deliveries has been illustrated on page 9.
In addition, the following adjustments must also
be made:
- open manual valves up-line from the gas
train.
- Adjust the minimum gas pressure switch to
the start of the scale (A).
- Adjust the air pressure switch to the start of
D3855 D3854
(A) (B) the scale (B).
- Purge the air from the gas line.
Continue to purge the air (we recommend
using a plastic tube routed outside the build-
ing) until gas is smelt.
- Assemble a pressure gauge (C) on the gas
pressure socket of the pipe coupling.
The manometer readings are used to calcu-
late burner power using the tables on page 6
and 7.
- Connect two lamps or testers to the two gas
line solenoid valves VR and VS, to check the
exact moment at which voltage is supplied.
This operation is unnecessary if each of the
two solenoid valves is equipped with a pilot
light that signals voltage passing through.
D3841 - Fan air damper: leave at the factory setting.
Before starting up the burner, it is good practice
to adjust the gas train so that firing takes place
in conditions of maximum safety, i.e. with gas
delivery at the minimum.
(C)
BURNER START-UP
Close the control devices.
As soon as the burner starts check the direction
of rotation of the fan blade, looking through the
flame inspection window 18)(A)p.4.
Make sure that the lamps or testers connected
to the solenoids, or pilot lights on the solenoids
themselves, indicate that no voltage is present.
If voltage is present, then immediately stop the
burner and check electrical connections.
BURNER FIRING
Having completed the checks indicated in the
previous heading, ignition of the burner should
be achieved. If the motor starts but the flame
does not appear and the control box goes into
lockout, reset and wait for a new firing attempt.
If firing is still not achieved, it may be that gas is
not reaching the combustion head within the
safety time period of 3 seconds. In this case
increase gas firing delivery.
The arrival of gas to the pipe coupling is shown
by the pressure gauge (C).
Once firing has taken place, proceed with global
burner calibration operation.
11
BURNER CALIBRATION
The optimum calibration of the burner requires
an analysis of the exhaust gases at the boiler
outlet.
Adjust successively:
1 - Maximum output;
2 - Air pressure switch;
3 - Minimum gas pressure switch.
15,87 x 10 x 3
Vg = = 0,132 Sm3
3600
1 - MAXIMUM OUTPUT
The maximum output of the burner must be set
within the firing rate range shown on page 5.
Adjusting gas delivery
Measure the delivery of gas from the gas meter.
A guideline indication can be calculated from the
tables on page 6, simply read off the gas pres-
sure on the manometer, see fig.(C) on page 11,
and follow the instructions on pages 6 - 7.
- If delivery needs to be reduced, diminish out-
let gas pressure and, if it is already very low,
slightly close adjustment valve VR2.
- If delivery needs to be increased, increase
outlet gas pressure.
Adjusting air delivery
Adjust the fan air damper by using the indexed
selector 1)(A) after having loosened the screw
2)(A).
12
AIR PRESSURE SWITCH 4)(A)p. 4 Note
Once you have finished adjusting maximum out-
put, check firing once again: noise emission at
this stage must be identical to the following
stage of operation. If you notice any sign of pul-
sations, reduce the firing stage delivery.
RMG
D3843
(C)
13
BURNER OPERATION
STANDARD FIRING
(n° = seconds from the moment 0) BURNER START-UP (A)
• Control device TL closes.
After about 3s:
• 0 s : The control box starting cycle begins.
• 2 s : Fan motor starts.
The air gate valve is set on maximum
adjustment output.
The pre-purge stage follows.
• 43 s : Ignition electrode strikes a spark.
• Safety valve VS and the 1st stage
VR1 of the adjustment valve VR
open. The shutter of valve VR1 has a
first rapid run that determines a low
output firing, point A, which is fol-
lowed by a slow run. The output
increases progressively up to a 1st
stage value, section A-B.
• 45 s : The spark goes out.
(B) D3025
14
FINAL CHECKS (with the burner working):
• disconnect a wire of the minimum gas pres-
sure switch;
• switch on the thermostat/pressure switch TL;
• switch on the thermostat/pressure switch TS;
the burner must stop.
• Disconnect the air adduction tube of the pres-
sure switch;
• disconnect the wire of the ionisation probe;
the burner must stop in lockout.
Make sure that the mechanical locking systems
on the various adjustment devices are fully tight-
ened.
MAINTENANCE
The burner requires periodic maintenance
! carried out by a qualified and authorised
technician in conformity with legislation and
local standards.
Periodic maintenance is essential for the
! reliability of the burner, avoiding the
excessive consumption of fuel and consequent
pollution.
Before carrying out any cleaning or
! control, always switch off the electrical
supply to the burner, using the main switch of
the system.
Combustion
The optimum calibration of the burner requires
an analysis of the exhaust gases. Significant dif-
ferences with respect to the previous measure-
ments indicate the points where more care
should be exercised during maintenance.
Gas leaks
Make sure there are no gas leaks on the pipe-
work between the gas meter and the burner.
Gas filter
Substitute the gas filter when dirty (see train
instructions).
Combustion head
Open the burner and make sure that all compo-
nents of the combustion head are in good condi-
tion, not deformed by the high temperatures,
free of impurities from the surroundings and cor-
rectly positioned. If in doubt, disassemble the
elbow.
Burner
Check for excess wear or loose screws in the
mechanisms that control the air damper and the
gas butterfly valve. In addition, the screws that
fix the cables in the terminal board must be
blocked, along with the burner sockets.
Clean the outside of the burner.
Combustion
Adjust the burner if the combustion values found
at the beginning of the operation do not comply
with the regulations in force, or at any rate, do
not correspond to good combustion.
Use the appropriate card to record the new
combustion values; they will be useful for subse-
quent controls.
15
BURNER START-UP PROGRAMME DIAGNOSTICS
During start-up, the indications are explained in the following table:
Pre-purging
Firing phase
Operation, flame OK
Lockout
Extraneous light
Below, a list of the possible methodologies for carrying out the resetting of the control box and for using the diagnostics.
VISUAL DIAGNOSTICS
Indicate the type of burner fault that leads to the lockout.
To display the diagnostic, proceed as follows:
- Keep the button pressed for more than 3 seconds from when the red led (burner lockout) switches on.
The end of the operation will be shown by a yellow led pulse.
Release the button when you see the flashing. The number of times it pulses tells you the cause of the malfunction, according to the coding
system indicated in the table on page 17.
SOFTWARE DIAGNOSTICS
Gives an analysis of the life of the burner, through optical connections with a PC showing the working hours, number and types of lockout, control
box serial number etc.
To display the diagnostic, proceed as follows:
- Keep the button pressed for more than 3 seconds from when the red led (burner lockout) switches on.
The end of the operation will be shown by a yellow LED pulse.
Release the button for 1 second, then press it again for more than 3 seconds, until you see another yellow flash.
When you release the button, the red led will flash intermittently with high frequency: only then is it possible to insert the optical connection.
When the operation is completed, it is necessary to reset the start-up condition of the control box, using the reset procedure described above.
From 1 to 3 seconds Reset of the control box without visualisation of the visual diagnostics.
More than 3 seconds, starting from the condition Software diagnostics, with the help of optical interface and PC
of visual diagnostics (possibility to visualise the working hours, irregularities, etc.)
The sequence of pulses issued by the control box identifies the possible types of malfunction, which are listed in the table on page 17.
16
Signal Problem Possible cause Recommended remedy
2 blinks Once the pre-purging phase 1 - The operation solenoid lets little gas through . . . . . . . . Increase
and safety time have passed,
the burner goes into lockout 2 - One of the two solenoid valves does not open. . . . . . . . Replace
without the appearance of the 3 - Gas pressure too low . . . . . . . . . . . . . . . . . . . . . . . . . . . Increase pressure at governor
flame
4 - Ignition electrode incorrectly adjusted . . . . . . . . . . . . . . Adjust, see fig. (D) page 8
5 - Electrode grounded due to broken insulation . . . . . . . . Replace
6 - High voltage cable defective . . . . . . . . . . . . . . . . . . . . . Replace
7 - High voltage cable deformed by high temperature . . . . Replace and protect
8 - Ignition transformer defective. . . . . . . . . . . . . . . . . . . . . Replace
9 - Incorrect valve or transformer electrical wiring . . . . . . . Check
10 - Defective control box . . . . . . . . . . . . . . . . . . . . . . . . . . . Replace
11 - A closed valve upline the gas train . . . . . . . . . . . . . . . . Open
12 - Air in pipework . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Bleed air
13 - Gas valves unconnected or with interrupted coil . . . . . . Check connections or replace coil
3 blinks The burner does not switch 14 - Air pressure switch in operating position . . . . . . . . . . . . Adjust or replace
on, and the lockout appears
The burner switches on, but - Air pressure switch inoperative due to insufficient air
then stops in lockout pressure:
15 - Air pressure switch incorrectly adjusted. . . . . . . . . . . . . Adjust or replace
16 - Pressure switch pressure test point pipe blocked . . . . . Clean
17 - Poorly adjusted head . . . . . . . . . . . . . . . . . . . . . . . . . . . Adjust
18 - High pressure in the furnace . . . . . . . . . . . . . . . . . . . . . Connect air pressure switch to fan suction
line
Lockout during pre-purging 19 - Defective motor control contactor . . . . . . . . . . . . . . . . . Replace
phase (only three-phase version)
20 - Defective electrical motor. . . . . . . . . . . . . . . . . . . . . . . . Replace
21 - Motor lockout (defective electrical motor) . . . . . . . . . . . Replace
4 pulses The burner switches on, but 22 - Flame simulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Replace the control box
then stops in lockout
Lockout when burner stops 23 - Permanent flame in the combustion head or . . . . . . . . Eliminate persistence of flame or replace
flame simulation control box
7 blinks The burner goes into lockout 24 - The operation solenoid lets little gas through . . . . . . . . Increase
immediately following the
25 - Ionisation probe incorrectly adjusted . . . . . . . . . . . . . . . Adjust, see fig. (D) page 8
appearance of the flame
26 - Insufficient ionisation (less than 5 A) . . . . . . . . . . . . . . . Check probe position
27 - Earth probe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Withdraw or replace cable
28 - Burner poorly grounded . . . . . . . . . . . . . . . . . . . . . . . . . Check grounding
29 - Phase and neutral connections inverted . . . . . . . . . . . . Invert them
30 - Defective flame detection circuit . . . . . . . . . . . . . . . . . . Replace the control box
Burner goes into lockout dur- 31 - Probe or ionisation cable grounded . . . . . . . . . . . . . . . . Replace worn parts
ing operation
10 blinks The burner does not switch 32 - Incorrect electrical wiring . . . . . . . . . . . . . . . . . . . . . . . . Check
on, and the lockout appears
The burner goes into lockout 33 - Defective control box . . . . . . . . . . . . . . . . . . . . . . . . . . . Replace
34 - Presence of electromagnetic disturbances in . . . . . . . . Filter or eliminate
the thermostat lines
35 - Presence of electromagnetic disturbance . . . . . . . . . . . Use the radio disturbance protection kit
No blink The burner does not start 36 - No electrical power supply . . . . . . . . . . . . . . . . . . . . . . . Close all switches - Check connections
37 - A limiter or safety control device is open . . . . . . . . . . . . Adjust or replace
38 - Line fuse blocked . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Replace
39 - Defective control box . . . . . . . . . . . . . . . . . . . . . . . . . . . Replace
40 - No gas supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Open the manual valves between contactor
and train
41 - Mains gas pressure insufficient . . . . . . . . . . . . . . . . . . . Contact your GAS COMPANY
42 - Minimum gas pressure switch fails to close. . . . . . . . . . Adjust or replace
The burner continues to 43 - The gas pressure in the gas mains lies very close to the Reduce the minimum gas pressure switch
repeat the start-up cycle, value to which the minimum gas pressure switch has intervention pressure. Replace the gas filter
without lockout been set. The sudden drop in pressure after valve open- cartridge.
ing causes temporary opening of the pressure switch
itself, the valve immediately closes and the burner
comes to a halt. Pressure increases again, the pressure
switch closes again and the ignition cycle is repeated.
And so on
Ignition with pulsations 44 - Poorly adjusted head . . . . . . . . . . . . . . . . . . . . . . . . . . . Adjust. See page 9
45 - Ignition electrode incorrectly adjusted . . . . . . . . . . . . . . Adjust, see fig. (D) page 8
46 - Incorrectly adjusted fan air damper: too much air . . . . . Adjust
47 - Output during ignition phase is too high. . . . . . . . . . . . . Reduce
17
NORMAL OPERATION / FLAME DETECTION TIME
The control box has a further function to guarantee the correct burner operation (signal: GREEN LED permanently on).
To use this function, wait at least ten seconds from the burner ignition and then press the control box button for a minimum of 3 seconds.
After releasing the button, the GREEN LED starts flashing as shown in the figure below.
6 blinks
2.8s
18
APPENDIX
Electrical connections
NOTES
The electrical wirings must be carried out in conformity
with the regulations in force in the countries of destination,
and by qualified personnel.
Riello S.p.A. cannot accept any responsibility for modifica-
tions or connections other than those shown in these dia-
grams.
Use flexible cables, in accordance with the regulation
EN 60 335-1.
All the cables to be connected to the burner must pass
through cable grommets.
The use of cable grommets can take various forms; the fol-
lowing way is just one possible solution:
RS 34-44/1 MZ
1- 7-pole socket for single-phase power supply, thermostat/
pressure switch TL
2- 6-pole socket for gas valves, gas pressure switch or
device for checking the valve seal
3- 4-pole socket for thermostat/pressure switch TR
5- 2-pole socket for accessories
D11833 6 - 6A Fittings for pipe unions
(Pierce, if it is necessary to use the pipe unions 6A)
NOTE
The RS 34-44/1 MZ -burners have been type-approved for intermittent operation. This means they should be "Compulsorily" stopped at least
once every 24 hours to enable the control box to perform a check of its own efficiency at start-up. Normally, the stopping of the burner is guar-
anteed by the boiler's thermostat/pressure switch. If this is not the case, a time switch should be fitted in series to IN to provide for burner shut-
down at least once every 24 hours.
ATTENTION:
! - Do not invert the neutral with the phase in the electrical supply line. An inversion would lead to lockout due to firing
failure.
- Replace the components only with original spare parts.
19
识别
产品铭牌上印有序列号、型号、主要技术及性能数据。如果铭牌被篡改、拆除或丢失,产品型号不容易识别,
安装或维修过程中会存在潜在危险。
通用警告
为了保证燃烧污染物排放降至最低,锅炉燃烧室的尺寸必须满足特定尺寸。
建议在给特殊锅炉选择燃烧器时,咨询我们的技术支持部门。
有资质人员是指那些经过专业培训机构培训合格的专业技术人员。
该燃烧器只能用于设计时指定的应用。
由于错误安装或错误调整,或不正确或不合理使用,或没有遵照随燃烧器附带的使用说明书来使用,或由无
资质人员操作等因素所造成的任何人、畜、财产损失,制造商概不负责。
用户告知
如果燃烧器在点火或运行中出现故障,燃烧器执行 “安全停机”,会有红色 LED 指示灯指示燃烧器锁定。要
重新启动燃烧器,按一下复位按钮。燃烧器重新启动后,红色 LED 指示灯熄灭。
这个操作最多允许重复 3 次,如果 “安全停机”还是发生,请联系我们的技术支持部门。
基本安全规则
严禁未成年人和无资质人员操作此设备。
在安装燃烧器房间的通风孔,进气格栅,排气格栅上不允许覆盖衣物、纸张或其他任何东西。
非认证人员不允许维修燃烧器。
拉出或缠绕电源插头是危险的。
清洁燃烧器前要断开主电源。
不要使用易燃物来擦拭燃烧器 (如酒精、汽油等 )。
盖子可以用肥皂水擦拭。
不要在燃烧器上放置任何东西。
不要在安装燃烧器的房间放置易燃物。
本手册使用的如下符号,解释如下:
! 注意 = 操作者需要特别注意并有所准备。
禁止 = 对操作者, 决不允许这样做。
CN 目录 说明书的相关信息
技术数据 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 引言
基本型号 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 说明书随燃烧器一起提供:
配件 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 - 说明书是产品不可或缺的组成部分,不得将其与产品分离
燃烧器描述 . . . . . . . . . . . . . . . . . . . . 4 ;因此必须小心保存以便查阅,如果将燃烧器转给另一个
包装 - 重量 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 用户或转移至另一个系统,则说明书必须跟随燃烧器一起
最大尺寸 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 转 移。如 果 说 明 书 损 坏 或 丢 失,则 必 须 从 您 就 近 的
标准配置 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 Technical Assistance Centre(技术支持中心)索
出力图. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 取说明书的复印件;
试验锅炉 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 说明书只能由有资格的人员使用;
商用锅炉 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 - 说明书提供了有关燃烧器安装、启动、使用和维护的重要指
示和安全警告。
燃气气压 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
安装 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 系统和说明书的交付
锅炉固定板 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 一旦交付系统:
燃烧头长度 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 - 系统制造商也必须将说明书交付给用户,并建议其将说明
燃烧器安装 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 书保存在热发生器的安装区域附近。
- 说明书上显示:
燃烧头设置 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9
- 燃烧器的序列号;
供气管路 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
燃气阀组 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
..............................................
初次点火前调节 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11
燃烧器启动 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11
- 最近 Assistance Centre (支持中心)的地址和电话号
燃烧器点火 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11
码;
燃烧器校准: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12
1 - 最大出力 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12 ..............................................
2 - 风压开关 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13
..............................................
3 - 最低燃气压力开关 . . . . . . . . . . . . . . . . . . . . . . . . . . . .13
火焰检查 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13 ..............................................
燃烧器运行 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14
最终检查 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15 - 系统制造商必须告知用户有关以下内容的准确信息:
维护 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15 - 系统的使用;
燃烧器启动周期检查 . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16 - 启动系统前需要进行的测试;
控制盒复位及使用诊断 . . . . . . . . . . . . . . . . . . . . . . . . . . .16 - 必需的维护和检查 (每年必须由制造商代表或别的专业技
术人员至少检查系统一次)。
故障 - 可能原因 - 处理建议 . . . . . . . . . . . . . . . . . . . . . . . .17
要保证定期检查, 建议遵照 Maintenance Contract
正常运行 / 火焰检测时间. . . . . . . . . . . . . . . . . . . . . . . . . .18
(维护合同)的规定。
附录 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19
配电盘接线图 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20
注意:
文中提及的图按如下方式标识:
1)(A) =本页的图 A 的第一部分;
1)(A) 页 3=第 3 页的图 A 的第一部分。
1
技术数据
型号 RS 34/1 MZ RS 44/1 MZ
类型 886 T 873 T
出力 (1) kW 70 - 390 100 - 550
Mcal/h 60 - 336 86 - 473
燃料 天然气 : G20 - G21 - G22 - G23 - G25
G20 G25 G20 G25
- 净热值 kWh/Sm3
9.45 8.13 9.45 8.13
Mcal/
8.2 7.0 8.2 7.0
Sm3
- 绝对密度 kg/Sm3 0.71 0.78 0.71 0.78
- 最大燃气量 Sm3/h 35 40 49 57
- 最大燃气量时的燃气压力 (2) mbar 13.1 18.4 16.7 23.2
运行方式 • 开 - 关 ( 每 24 小时至少停机一次 )。
• 一段火
标准应用 锅炉:热水炉,蒸气炉,导热油炉
环境温度 °C 0 - 40
助燃空气温度 °C 最大 60
电源 V 230 ~ +/-10%
Hz 50/60 - 单相
电机 rpm 2800/3400 2820/3400
W 300 420
V 220 - 240 220 - 240
A 2.4 3
启动电流 A 15 17
工作电流 A 3.2 3.5
电机电容 F/V 12.5/400 12.5/450
点火变压器 V1 - V2 230 V - 1 x 15kV
I1 - I2 1 A - 25mA
电功消耗 W 最大 600 700
电气防护等级 IP 40
遵循的 EEC 指令 90/396 - 2004/108 - 2006/95 - 2006/42
噪声等级 (3) 声压 dBA 68 70
声功率 79 81
认证 CE 0085BR0380 0085BR0380
(1) 参照条件 : 环境温度 20°C - 燃气温度 15°C - 气压 1013 海拔 0 m a.s.l.
(2) 测点第 4 页 8)(A) 处的压力,参考条件为炉膛背压为零且燃烧器最大出力。
(3) 发声测试按照指令 EN 15036-1 在制造商燃烧实验室中执行,σ测量精度 = ± 1.5 dB,且燃烧器在试验锅炉上以最大输出功率
运行。
基本型号 燃气类型
型号 燃烧头长度 mm 国家 类型
216 IT - AT - GR - DK - FI - SE II2H3B/P
RS 34/1 MZ
351 II2H3P
ES - GB - IE - PT
II2L3B/P
216 NL
RS 44/1 MZ II2Er3P
351
FR II2ELL3B/P
DE I2E(R)B, I3P
II2E 3B/P
BE
LU
2
配件 ( 可选 ):
• 无线电干扰保护套件
由于存在变换器,在将燃烧器安装于极易受无线电干扰 ( 信号发射超过 10 V/m) 的位置时,或在节温器连接长度超过 20 米的应用场合,提供一保
护套件,用作控制箱和燃烧器之间接口。
燃烧器 RS 34/1 MZ - RS 44/1 MZ
代码 3010386
• 加长燃烧头
燃烧器 RS 34/1 MZ RS 44/1 MZ
代码 3010428 3010429
• 最高燃气压力开关 代码 3010418
• 无源接触器组件 代码 3010419
• 后吹扫组件 代码 3010452
• 接地保护组件 代码 3010448
• 连续吹扫组件 代码 3010449
• 计时器组件 代码 3010450
• 连接 RMG 至 PC 机的接口适配器组件 代码 3002719
3
燃烧器描述 (A)
1 燃烧头
2 点火电极
3 用于燃烧头调节的螺钉
4 套管
5 最小风压开关
( 不同的运行方式 )
6 火焰探针
D11831
7 风压测试点
8 燃气压力测试点及用于固定燃烧头的螺
钉
9 固定风机到套管的螺栓
10 打开燃烧器及检修燃烧头时用的滑杆
11 开度指示器
将风门打开到燃烧器输送所需要的数值 .
12 压力测试点
13 进风口
14 燃气供气管道
15 燃气阀组连接法兰
16 锅炉固定法兰
17 稳焰盘
18 观火孔
19 电机电容 (RS 34/1 MZ)
20 带锁定指示灯及锁定复位按钮的控制盒
21 电缆插头
22 风门挡板
23 电离子探针电缆的插接口
注意:
如果控制盒 20)(A) 的报警指示灯亮 (红
色),表明燃烧器处于锁定状态。
按下按钮,保持 1 至 3 秒,使其复位。
包装 - 重量 (B) - 大概值
• 燃烧器放置在纸盒内运输,最大尺寸见表
格 (B)。
D7561
• 燃烧器与包装的总重量见表格 (B)。
D11832 标准配置
D7562
1 - 燃气阀组法兰
(A)
1 - 法兰垫圈
4 - 法兰固定螺栓 M 8 x 25
4 - 将燃烧器法兰固定于锅炉上的螺栓:
mm A B C kg M 8 x 25
RS 34/1 MZ 1000 500 485 - 1 - 隔热垫
3 - 电气接线插头
RS 44/1 MZ 1000 500 485 -
1 - 使用说明书
1 - 备件清单
D88 (B)
D3831
(C)
mm A D E F (1) H I L O N V M
RS 34/1 MZ 442 422 508 216-351 140 305 138 780 84 177 1”1/2
RS 44/1 MZ 442 422 508 216-351 152 305 138 780 84 177 1”1/2
4
出力图 (A)
燃烧器的出力大小必须在左图显示的区域
范围内。
注意
炉膛背压 mbar
出力图的值在如下条件下测得:环境温度
20°C, 大气压力 1013 mbar ( 海拔大约 0m),
燃烧头设置如 9 页图示。
测试锅炉 (B)
根据 EN 676 规定,出力图依据特定测试锅
炉设定。图表 (B) 显示了测试锅炉燃烧室的
直径及长度。
.
例如 : 出力 350 Mcal/h:
直径 = 50 cm - 长度 1.5 m。
商用锅炉
如果锅炉符合 CE 标准且其炉膛尺寸基本符
合表 (B)所列值,那么燃烧器 / 锅炉的匹
配不会出现什么问题。
如果燃烧器需要使用在没有 CE 认可的锅炉
或 / 和炉膛尺寸明显小于表(B)所列之值,
应该先咨询燃烧器生产厂商。
炉膛背压 mbar
(A) D8589
燃烧室长度 m
Mcal/h
kW
(B) D497
5
RS 34/1 MZ 一段火燃气阀组 p (mbar) 燃气压力
左表列出燃烧器运行在最大出力时燃气管
2 道上的最小压力损失。
列1
kW 1 MBC-DLE-120 MB 407 S2 MB 410 S2 MB 412 S2 MB 415 S2 MB 420 S2 燃烧头处的压力损失
(Rp 3/4") (Rp 3/4") (Rp 1.1/4") (Rp 1.1/4") (Rp 1.1/2") (Rp 2") 测点第 7 页 1)(B) 处燃气压力,参考条件:
70 0,6 5,2 3,0 -- -- -- -- 炉膛背压为 0 mbar。
75 0,6 5,6 3,4 2,1 -- -- -- 列2
100 1,0 8,2 5,6 2,9 -- -- -- 第 7 页 2)(B) 燃气阀组 的压力损失,包括:
125 1,4 11,1 8,0 4,2 2,1 -- -- 1 段火或 2 段火调节阀 VR,安全阀 VS ( 两
150 2,4 15,7 11,0 5,6 2,8 -- -- 个全开 ),调压器 R,过滤器 F。
175 3,5 21,1 14,4 7,2 3,6 -- -- 表中所列之值是根据使用天然气 G 20 (
200 4,6 27,2 18,1 9,0 4,5 -- -- PCI 9.45 kWh/Nm3 (8.2Mcal/Nm3))所得。
225 5,8 33,9 22,1 11,0 5,5 3,2 -- 对于天然气 G 25 ( PCI 8.13 kWh/Nm3
250 6,9 41,3 26,4 13,2 6,5 3,3 -- (7.0 Mcal/Nm3))
275 8,0 49,4 31,3 15,5 7,6 3,8 -- 表中之值乘以一个系数:
- 列 1:乘 1.5 ;
300 9,1 58,0 36,6 18,0 8,7 4,3 --
- 列 2:乘 1.35。
325 10,2 67,2 42,2 20,5 9,9 4,8 3,2
350 11,3 76,7 47,8 22,9 11,2 5,4 3,4 计算 燃烧器的最大出力大概值,按如下方
法:
375 12,4 86,7 53,7 25,4 12,7 5,9 3,8
- 将第7页1)(B)测试点测得的燃气压力减
390 13,1 57,4 27,0 13,5 6,3 4,0 去炉膛背压值。
RS 44/1 MZ 一段火燃气阀组 p (mbar) - 从相关的图表中1 列的数据中找出最接近
上一步计算结果的数值。
2 - 读取左边对应值。
kW 1 MB 407 S5 MB 410 S5 MB 412 S2 MB 415 S2 MB 420 S2 例 - RS 34/1/M MZ:
(Rp 3/4") (Rp 1.1/4") (Rp 1.1/4") (Rp 1.1/2") (Rp 2") 最大出力运行
100 0,2 5,6 2,9 2,1 3,2 3,2 • 天然气 G20 (PCI 9.45kwh/m3 )
150 1,6 11,0 5,6 2,8 3,2 3,2 • 第 7 页 1)(B)
200 3,0 18,1 9,0 4,5 3,2 3,2 测试点的燃气压力 = 8.9 mbar
• 炉膛背压 = 2 mbar
250 4,9 26,4 13,2 6,5 3,3 3,2
8.9 - 2 = 6.9 mbar
300 6,9 36,6 18,0 8,7 4,3 3,2 在 RS 34/1 MZ 的表中压力 6.9 mbar ( 列 1)
350 8,9 47,8 22,9 11,2 5,4 3,4 对应的出力为 250 kW。
400 10,8 59,9 28,1 14,0 6,5 4,1 这个值只能作为参考;精确的出力值要根
450 12,8 73,2 33,6 16,8 7,7 4,9 据燃气计量表测量。
500 14,7 87,6 39,5 19,8 9,0 5,7 . 计算 燃烧器在最大出力时第 7 页测点 1)(B)
550 16,7 103,0 45,8 23,1 10,2 6,6 的燃气压力:
- 在相应的燃烧器表中找到最接近的出力
RS 34/1 MZ 二段火燃气阀组 p (mbar) 值。
- 读取列 1 的读数。
2 - 再加上炉膛背压值。
kW 1 MB-ZR 407 S2 MB-ZR 410 S2 MB-ZR 412 S2 MB-ZR 415 S2 MB-ZR 420 S2 例 - RS 34/1 MZ:
(Rp 3/4") (Rp 1") (Rp 1.1/4") (Rp 1.1/2") (Rp 2") • 燃烧器需求出力: 250 kW
70 0,6 3,0 2,1 2,1 -- -- • 天然气 G 20 (PCI 9.45 kWh/Sm3 )
75 0,6 3,4 2,1 2,1 -- -- • 出力为 250 kW 时 , 表格
RS 34/1 MZ, 列 1 读数 = 6.9 mbar
100 1,0 5,6 2,9 2,1 -- --
• 炉膛背压 = 2 mbar
125 1,4 8,0 4,2 2,1 -- -- 6.9 + 2 = 8.9 mbar
150 2,4 11,0 5,6 2,8 -- -- 即为第 7 页测试点 1)(B) 的燃气压力
175 3,5 14,4 7,2 3,6 -- --
200 4,6 18,1 9,0 4,5 -- --
225 5,8 22,1 11,0 5,5 3,2 --
250 6,9 26,4 13,2 6,5 3,3 --
275 8,0 31,3 15,5 7,6 3,8 --
300 9,1 36,6 18,0 8,7 4,3 --
325 10,2 42,2 20,5 9,9 4,8 3,2
350 11,3 47,8 22,9 11,2 5,4 3,4
375 12,4 53,7 25,4 12,7 5,9 3,8
390 13,1 57,4 27,0 13,5 6,3 4,0
(A)
6
RS 44/1 MZ 二段火燃气阀组 p (mbar)
2
kW 1 MB-ZR 410 S2 MB-ZR 412 S2 MB-ZR 415 S2 MB-ZR 420 S2
(Rp 1") (Rp 1.1/4") (Rp 1.1/2") (Rp 2")
100 0,2 2,9 2,1 -- --
150 1,6 5,6 2,8 -- --
200 3,0 9,0 4,5 3,2 --
250 4,9 13,2 6,5 3,3 --
300 6,9 18,0 8,7 4,3 3,2
350 8,9 22,9 11,2 5,4 3,4
400 10,8 28,1 14,0 6,5 4,1
450 12,8 33,6 16,8 7,7 4,9
500 14,7 39,5 19,8 9,0 5,7
550 16,7 45,8 23,1 10,2 6,6
(A)
3
D8065
2
F VS R VR
(B)
7
1 2 3 4 5 安装
! 燃烧器的安装必须遵循当地法规
和相关标准!
工作位置 (A)
! 燃 烧器 被设计 成只 能在 位置 1, 2, 3
D3928 和 4 位置点工作。
安装位置 1 是最好的,这是可以按照操作手
册来检修的唯一位置。安装位置 2, 3 和 4 也
(A) 可以正常工作,但是对于维修和燃烧头的检
查等比较困难,见 15 页说明。
其他安装位置也可以正常工作。但是
从安全角度考虑,位置 5 是被禁止
mm A B C 的。
燃烧头长度 (C)
燃烧头的长度选择应按照锅炉厂商提供的
说明书来选取,任何情况下,燃烧头的长度
必须大于锅炉前炉墙和炉衬的总厚度。
燃烧头的长度 L (mm) 如下所示:
燃烧头长度 9) RS 34/1 MZ RS 44/1 MZ
• 标准 216 216
• 加长 351 351
对于带前烟箱 6) 或反转火焰的锅炉, 必须
在锅炉炉衬 7)和燃烧头 9)之间安装用保
温材料制作的防护衬 8)。防护衬的安装不
D7564
能妨碍燃烧头的移动。
对于带有前水冷壁的锅炉,除非锅炉厂商特
别要求,否则防护衬 7)-8)(C) 是不需要的。
(C)
固定燃烧器到锅炉上 (C)
探针 电极 安装燃烧器到锅炉上之前,检查(从燃烧头
的开口处)火焰探针和点火电极的位置是否
正确,如图 (D) 所示。
从燃烧器上分开燃烧头,如图 (C):
- 从两根滑杆 3)上拆下螺栓 2);
- 拆下螺栓 1) 并将燃烧器在滑杆 3)上拉出
约 100 mm ;
- 断开火焰探针和点火电极的电缆,然后完
全将燃烧器拉出。将单元 4)(C)固定到
锅炉炉门上,插入隔热垫 5)(C)。用 4 颗
螺栓固定,燃烧器和锅炉之间必须密封。
若前面的检测中发现探针或者电极的位置
不正确,拆除螺杆 1)(E),抽出燃烧头的内
部部件 2)(E) 进行调整。
不要转动探针的角度,保持如图 (D)所示
D3844 位置。如果探针太靠近电极,有可能损坏控
(D)
制盒。
! 注意
重新装配燃烧头内部组件 2)(E)
时,螺栓 1)(E) 的紧力应该在 4 ~
6 Nm 之间。
D3835
(E)
8
燃烧头的设置
安装工作进行到这一步,燃烧头和套管已经
安装到锅炉上,如图 (A) 所示。接下来调整
燃烧头比较容易。
空气调节 (A - B)
旋转螺栓 1)(A) 直到指示杆 2)(A) 上的刻槽
与面板 3) (A) 的表面对齐。
例:
RS 44/1 MZ 燃烧器,出力 = 300kW.
如图 (B) 所示,对于最大出力 300 kW,空
气应该调节到刻度 4。
注意:
如果炉膛背压为 0 mbar,空气的调节按图
(B) 中的虚线所示来调节。
中心风调节 (A - C)
(A) 在需要精确调试的应用中,可能需要按照图
D8458
( C)刻度指示通过调节环 4)(A) 来调节中
心空气量。
N° 刻度 ( 空气 = 燃气 ) 调节时,松开螺栓 5)(A) 然后抬起环 4)(A)。
最后拧紧螺栓 5)(A)。
一旦完成头部的调整,将燃烧器 4)(D) 重新
装回到滑杆 3)(D) ,在燃烧器距燃气管连接
器 5)(D) 100mm 处 (燃烧器处于 第 8 页图
(C) 所示位置), 连接好火焰探针和电极的
电缆,然后完全关闭燃烧器,燃烧器处于图
(D) 所示位置。
在滑杆 3)上装回螺栓 2)。
用螺栓 1)固定燃烧器。
重要
安装好燃烧器后,建议轻轻的拉出火焰探针
燃烧器最大出力 和点火电极的电缆,直到它们被轻轻拉紧。
(B) D7565
N° 刻度 ( 空气 = 燃气 )
燃烧器最大出力
(C) D8577
D7566
(D)
9
燃气供气管路
• 用随燃烧器供应的法兰2),法兰垫3)和螺
栓 4)将燃气阀组连接到燃气接口 1)(A)
上。
• 根据需要,燃气阀组可以从燃烧器的左右
两边连接,如图 (A)。为了确保燃气在 3 秒
钟的安全时间里能够到达燃烧头,燃气电
磁阀应该尽可能的靠近燃烧器。
燃气阀组 (B)
燃气阀组符合 EN 676 标准,与燃烧器分别
提供,订货代码由表 (C) 给出。表 (C) 的一
段火燃气阀组的功率最大可以到 550 kW,
只需要根据标准限制点火出力,详见 12 页。
图例 (B)
(A) 1 - 燃气供气管
D3839
2 - 手动阀
3 - 减振接头
4 - 带按压开关的压力表
5 - 整体阀,包括:
6 7 9
- 过滤器 ( 可更换 )
- 一段或二段工作阀
P1 - 调压器
4 6 - 最小燃气压力开关
10 7 - 燃气泄漏检测装置
根据 EN 676 标准要求,对于最大出力
8 大于1200KW的燃烧器必须配置燃气阀组
泄漏检测装置。
8 - 法兰垫
1 2 3 P2 5 11 9 - 燃气阀组 / 燃烧器适配器
P1- 燃烧头处的燃气压力
L1 L
P2- 调节阀前的燃气压力
(B) D8066
L - 单独提供的燃气阀组,代码见表 (C)
L1 - 由安装方负责
燃烧器和有关燃气阀组,符合 EN 676 标准
表 (C) 图例
燃气阀组 ( 一段火 ) 燃烧器 7 9 C.T.=燃气阀组泄漏检测装置:
- = 燃气阀组不带燃气泄漏检测装置
代码 型号 Ø C.T. RS 34/1 RS 44/1 代码 代码
;但是可以单独定购以后装配 ( 代
3970602 MBC 120 3/4” • - - 3000824 码见列 7)。
3970553
MB-DLE 407 S20 3/4” - • - 3010123 3000824 = 燃气阀组已经装配燃气泄漏检测
3970229* 装置。
3970599 MB-DLE 407 S52 3/4” - - • 3010123 3000824 = 该阀组,集成泄漏检测装置不可使
3970554 用
MB-DLE 410 S20 1” - • • 3010123 3000824 7 = VPS 燃气阀组泄漏检测装置。根据需
3970230*
3970258 MB-DLE 410 S52 1”1/4 • 3010123 3000824 要与燃气阀组分别提供。
9 = 燃气阀组 / 燃烧器适配器。
3970144
MB-DLE 412 S20 1”1/4 - • • 3010123 - 根据需要与燃气阀组分别提供。
3970231*
3970180
MB-DLE 415 S20 1”1/2 - • • 3010123 - 注意
3970232*
调节燃气阀组,请参考相关阀组使用手册。
3970181 - 3010123
3970233* - 3010123
3970182 MB-DLE 420 S20 2” • • 3000822
-
3970234* -
* 连接燃烧器配有 6 针插头的阀组 .
** 按 21 页接线图,用随燃烧器提供那个接头替换 6 针插头。
(C)
10
最小燃气压力开关 风压开关 初次点火前调整
! 警 告 告警 告
第一次点火必须由有资质人员利用专用
工具来完成。
燃烧头的调整,空气的调整已经在第 10 页
介绍。
另外,下面的这些调整也必须完成:
- 打开燃气阀组前的手动阀;
- 调节最小燃气压力开关至刻度 (A) 起始处
;
- 调节风压开关至刻度 (B) 起始处;
D3855 D3854
- 排尽燃气管路中的空气;
(A) (B)
连续排放空气 (建议用一根软管接到室外
排放 ) 直到闻到燃气的味道。
- 在燃烧头燃气压力测点处安装一个压力
表如图 (C) 所示。
压力表的读数可以用来计算燃烧器的最
大出力的大概值,如第 7、 8 页的描述。
- 连接两个灯泡或万用表到两个电磁阀 VR
和 VS 上,用以检查何时给电磁阀供电。
如果两个电磁阀均配置了指示灯显示何
时通过电流,那么这一步就不必要了。
- 风门挡板:保持工厂的设定不变。
启动燃烧器前,最好是先调整燃气阀组以便
燃烧器能在最安全的情况下点火,例如,使
燃气流量最小。
D3841
启动燃烧器
闭合控制开关。
燃烧器一启动,通过第 4 页 18)(A) 观火孔观
察风机叶片转向。
(C) 通过连接的灯泡或万用表或燃气阀组自带
的指示灯来确认此时电磁阀没有得电,如果
电磁阀得电了,应立即停止燃烧器并检查电
气接线。
燃烧器点火
完成了前面的这些检查后,燃烧器将成功点
火。如果马达转动而火焰并没有出现,并且
控制盒锁定,复位并等待下一次点火尝试。
如果点火还是不成功,有可能是因为燃气没
有在 3 秒钟的安全时间里到达燃烧头。这种
情况下,可以适当增加点火燃气量。燃气是
否到达燃烧头可以通过图 (C)所示连接的压
力表来确认。一旦点火成功,即可进行全面
校准工作。
11
燃烧器校准
燃烧器的最佳校准需要在排烟口使用烟气
分析仪进行烟气分析。
按如下顺序调整:
1 - 最大出力;
2 - 风压开关;
3 - 最小燃气压力开关;
点火出力确定 ( 最小出力 )
燃烧器最大额定出力小于 120 kW
可以在最大额定运行出力下点火。例如:
• 最大运行出力 : 120 kW
• 最大点火出力 : 120 kW
燃烧器最大额定出力大于 120 kW
点火时的出力必须小于最大运行出力。
如果点火出力不超过 120 kW,无需调整。
如果点火出力超过 120 kW,点火出力根据
(A) D593
控制盒的安全时间 “ts”来确定:
"ts" = 3 秒,点火出力必须小于或等于最大
运行出力的 1/3 。
例如:
最大运行出力为 450 kW。
如果安全时间 ts = 3 秒,那么点火出力必须
等于或小于 150 kW 。
为了测量点火出力:
- 断开火焰探针上的电缆接头24)(A)页4 (燃
烧器将点火并在安全时间后锁定 )。
- 重复上面的点火 - 锁定 10 次。
- 在燃气表上读出燃气用量。
该燃气量必须小于或等于按如下公式计算
值,如安全时间 ts = 3 秒:
Qa ( 燃烧器点火出力 ) x n x ts
Vg =
3600
15,87 x 10 x 3
Vg = = 0,132 Sm3
3600
1 - 最大出力
燃烧器最大出力的设定必须在第 5 页所示的
负荷图范围内。
调整燃气量
通过燃气流量表测量燃气量。
按常规,也可以参照第 6 页的表格,只需要
读出图 (C) (第 11 页)的压力表读数,按
照第 6、 7 页的指示操作即可。
- 如果需要减少燃气量,降低出口燃气压
力。如果压力已经很低,则稍微关闭调节
阀 VR2。
- 如果需要增加燃气量,加大出气口燃气压
力。
调节风量
松开螺栓 2)(A),然后利用液压装置 1)(A)
调整风门挡板。
12
风压开关 ( 第 4 页 4)(A)) 注意
一旦调整好最大出力,再次检查点火:点火
阶段的噪音必须和正常运行阶段的噪音接
近。如有异常噪音,可以适当减少点火出
力。
2 - 风压开关 (A)
在风压开关设置在量程开始位置 (A) 的前提
下完成燃烧器的基本调整后,再来调整风压
开关。
使燃烧器运行于最小出力状态,插入烟气分
析仪,慢慢的关小风机进风口(可以用一块
硬纸板)直到 CO 含量不超过 100 ppm。然
后顺时针转动旋钮,直到燃烧器到达锁定位
置。 检查刻度盘 (A) 上向上的那个箭头指示
的值。逆时针方向慢慢旋转旋钮直到这个值
与刻度盘 (A) 上那个向下的箭头对齐,这就
包含了压力开关动作滞后的量 ( 两个箭头之
间兰底白色标记显示的区域 )。
现在检查燃烧器能否正常启动:
D3951
如果燃烧器再次锁定,再逆时针慢慢的旋转
(A) 旋钮一点点。
火焰监测 (C)
燃烧器配置了离子火焰检测系统确保火焰
存在。控制盒能检测到的最小电流是 5 μA。
燃烧器能提供的电流要大得多,所以这部分
不需要调整。如果要测量离子探针电流,断
开离子探针的连接电缆接头 (第 4 页
23)(A))接入一个量程为 100 μA 的直流电
(B) D3855
流表。注意正负极性。
µA 10
RMG
D3843
(C)
13
燃烧器运行
正常点火
(n° = 从 0 秒开始后的秒数 ) 燃烧器启动 (A)
• 控制装置 TL 闭合
大概 3 秒钟后:
• 0 s :控制盒启动循环开始
• 2 s :风机电机启动。
风门打开到最大出力位置。
然后是预吹扫阶段。
• 43 s :点火电极打火花。
• 安全阀VS及调节阀VR的一段火阀
VR1 打开。阀门 VR1 开始快速打
开,在较小出力下点火,点 A 所
示。然后调节阀 VR 慢慢开到最小
出力位置,燃气流量也慢慢平缓的
增加,A-B 部分。
• 45 s :点火电极熄灭。
• 53 s :阀门 VR 的二段火阀门 VR2 打开,
出力从一段火缓慢升至最大出力,
C-D 部分所示。
• 控制阀盒的启动循环结束。
稳定运行阶段 (A)
启动循环的最后阶段,控制盒持续检查火焰
是否存在,并检查风压开关是否处于正确位
置。
* 不亮 黄色 绿色 红色 燃烧器以恒定的出力运行。
如果锅炉中的温度或压力持续上升且断开
更多细节见 16 页 . 控制开关 TL,燃烧器会停止运行, F-G 部
(A) D3024 分。
燃烧器运行过程中熄火
如果燃烧器在运行过程中意外熄火,燃烧器
将在 1 秒钟内锁定。
* 不亮 黄色 红色
更多细节见 16 页 .
(B) D3025
14
最终检查 ( 燃烧器运行中进行 ):
• 断开最低燃气压力开关电缆;
• 断开温度 / 压力开关 TL
• 断开温度 / 压力安全开关 TS ;
燃烧器必须停止 .
• 断开风压开关的进风管;
• 断开离子探针的电缆;
燃烧器必须停机并锁定 .
确认各个可调节设备上的锁紧装置已经紧
固。
维护
燃烧器需要定期维护,维护工作必须
! 由 具有专业技术资质并经由当地
相关部门认证的专业人员执行。
定期维护对确保燃烧器的可靠性至关
! 重 要,避 免 燃 气 过 多 消 耗 及 过 多 污
染。
进行任何清洁或维护前,要断开系统
! 的总电源开关。
燃烧
要实现燃烧器的最佳校准,需要对烟气进行
分析。维护过程中如果发现有数据与以前测
得的数据有较大差别,就需要多加注意。
燃气泄露
确保在燃气表与燃烧器间的管路上没有燃
气泄露。
燃气过滤
过滤器脏了就需要更换 (参考燃气阀组手册)。
燃烧头
打开燃烧器检查燃烧头的各个部分完好无
损。没有高温变形,没有脏,位置正确,如
果不能确定,可以拆下肘型弯管检查。
燃烧器
检查控制风门挡板和燃气蝶阀的机构是否
存在过度磨损或松动的情况。另外确保燃烧
器电缆的插接头紧固。
清理燃烧器外表面。
燃烧
如果在运行的开始阶段燃烧不能满足当地
强制标准,或者在任意出力下燃烧效果不
好,就需要调整燃烧器。
用卡片记录燃烧的各项数据;这些数据对
今后的维护有参考作用。
15
燃烧器启动程序诊断
启动过程中,指示灯的指示意义解释如下:
颜色代码表
顺序 颜色代码
预吹扫
点火阶段
运行火焰正常
弱火焰信号运行
电压低于 ~ 170V
锁定
外部光线
图例 : 不亮 黄色 绿色 红色
控制盒复位和使用诊断功能
控制盒提供了诊断功能,因此可以很容易的识别可能存在的故障 ( 指示方式:红色 LED 指示信号 )。
要使用此功能,待燃烧器进入安全状态 (锁定状态)后,至少等待 10 秒钟,然后按下复位按钮。
控制盒每隔 3 秒产生一个脉冲闪烁信号。
待观测到闪烁次数,并识别出可能的故障原因后,应按住复位安住复位安钮 1-3 秒钟,进行复位。
下面列出控制盒复位和诊断的使用方法。
复位控制盒
控制盒复位,按如下方法操作:
- 按下按钮,保持 1-3 秒钟,
松开按钮 2 秒钟后,燃烧器重新启动,
如果燃烧器没有重新启动,必须确保启动温控器处于闭合状态。
可视诊断
可视诊断功能
可以标识导致燃烧器锁定的故障信息。
要进行诊断,按如下步骤操作:
- 红灯亮起 (燃烧器锁定)后,按住复位按钮并保持 3 秒钟。
黄灯闪烁时松开按钮,这时可以看到红灯闪烁,闪烁的次数代表可能的故障,参考 17 页的故障代码对应表。
软件诊断
要实现燃烧器的实时分析,将燃烧器通过红外线接口连接到一台 个人电脑上,就可以显示燃烧器的工作状态,包括燃烧器工作的
时间,锁定的次数和类型,控制盒的序列号等。
从而按照以下步骤进行可视诊断:
- 红灯亮时(燃烧器锁定),按住复位按钮超过 3 秒钟,黄色灯闪烁,松开按钮 1 秒钟,然后再按住复位按钮超过 3 秒钟,直到看到
黄灯再次闪烁。
松开按钮,红色 LED 等高频闪烁:只有这个时候红外连接才会激活。
操作完成后,需要复位控制盒重新启动燃烧器,方法上面已经介绍。
按住按钮 控制盒状态
1 秒 -3 秒 不进入诊断状态,控制盒复位。
可视诊断:
按住超过 3 秒 (LED 指示灯每间隔 1 秒闪烁一次 )。
软件诊断,需要红外接口和电脑
进入可视诊断状态后,再按超过 3 秒 ( 可以看到工作时间、故障等 )
控制盒上指示灯发出的脉冲闪烁信号指示可能的故障类型,列表于 17 页。
16
信号 故障 可能的原因 建议的弥补措施
闪烁 2 次 预吹扫和安全时间后燃 1 - 燃气阀组过气量太少 . . . . . . . . . . . . . . . . . . 增加燃气量
烧器锁定并且没有火焰
出现 2 - 两个电磁阀中的一个未打开. . . . . . . . . . . . . 更换
3 - 燃气压力过低 . . . . . . . . . . . . . . . . . . . . . . . 增加调压器的压力
4 - 点火电极调整不当 . . . . . . . . . . . . . . . . . . . . 调整,见第 8 页图 D
5 - 由于电缆破损点火电极接地. . . . . . . . . . . . . 更换
6 - 高压电缆有缺陷. . . . . . . . . . . . . . . . . . . . . . 更换
7 - 高压电缆因为高温而变形 . . . . . . . . . . . . . . 更换和保护
8 - 点火变压器故障. . . . . . . . . . . . . . . . . . . . . . 更换
9 - 阀组或变压器接线错误 . . . . . . . . . . . . . . . . 检查
10 - 控制盒故障 . . . . . . . . . . . . . . . . . . . . . . . . . 更换
11 - 燃气阀组上游手动阀未开 . . . . . . . . . . . . . . 打开
12 - 燃气管中有空气. . . . . . . . . . . . . . . . . . . . . . 排气
13 - 阀组没有连接,或线圈故障 . . . . . . . . . . . . . 检查接线或更换线圈
闪烁 3 次 燃烧器没有启动就出现 14 - 风压开关处于运行状态 . . . . . . . . . . . . . . . . 调整或更换
锁定
燃烧器启动,然后锁定 - 风压开关由于气压不足而不动作
停机
15 - 风压开关调整不正确 . . . . . . . . . . . . . . . . . . 调整或更换
16 - 风压开关气压测试点管道被阻塞 . . . . . . . . . 清洁
17 - 燃烧头调整不正确 . . . . . . . . . . . . . . . . . . . . 调整
18 - 燃烧器负压过高. . . . . . . . . . . . . . . . . . . . . . 风压开关另一管连接到风机进风口
预吹扫期间锁定 19 - 电机控制接触器故障 ( 仅 3 相型 ) . . . . . . . . 更换
20 - 电机故障 . . . . . . . . . . . . . . . . . . . . . . . . . . . 更换
21 - 电机锁定 ( 电机故障). . . . . . . . . . . . . . . . . 更换
闪烁 4 次 燃烧器启动,但之后锁 22 - 模拟火焰 . . . . . . . . . . . . . . . . . . . . . . . . . . . 更换控制盒
闭
在燃烧器停机时锁闭 23 - 燃烧头的残留火焰或虚假火焰 . . . . . . . . . . . 消除火焰或更换控制盒
闪烁 7 次 燃烧器在出现火焰之后 24 - 燃气阀组过气量太少 . . . . . . . . . . . . . . . . . . 增加燃气量
立即锁定
25 - 电离子探针的调整不当 . . . . . . . . . . . . . . . . 调整见第 8 页图 (D)
26 - 电离子电流太小 (小于 5A) . . . . . . . . . . . 检查探针位置
27 - 离子探针接地 . . . . . . . . . . . . . . . . . . . . . . . 拉出或更换电缆
28 - 燃烧器接地不好. . . . . . . . . . . . . . . . . . . . . . 检查接地
29 - 相线和中线接反. . . . . . . . . . . . . . . . . . . . . . 调换
30 - 火焰探测电路故障 . . . . . . . . . . . . . . . . . . . . 更换控制盒
燃烧器运行期间出现锁 31 - 离子探针或电缆接地 . . . . . . . . . . . . . . . . . . 更换磨损部分
闭
闪烁 10 次 燃烧器没有启动,但出 32 - 接线错误 . . . . . . . . . . . . . . . . . . . . . . . . . . . 检查
现锁定
燃烧器锁定 33 - 控制盒故障 . . . . . . . . . . . . . . . . . . . . . . . . . 更换
34 - 启动温控器线路中出现电磁干扰 过滤或消除干扰
35 - 存在电磁干扰 . . . . . . . . . . . . . . . . . . . . . . . 使用无线电干扰保护套件
无闪烁 燃烧器不启动 36 - 没有电源供应 . . . . . . . . . . . . . . . . . . . . . . . 闭合所有开关 - 检查接线
37 - 启动温控开关安全温控开关断开 . . . . . . . . . 调整或更换
38 - 保险丝被熔断 . . . . . . . . . . . . . . . . . . . . . . . 更换
39 - 控制盒故障 . . . . . . . . . . . . . . . . . . . . . . . . . 更换
40 - 没有燃气 . . . . . . . . . . . . . . . . . . . . . . . . . . . 打开手动阀
41 - 燃气供气气压不足 . . . . . . . . . . . . . . . . . . . . 联系燃气公司
42 - 最小燃气压力开关没有闭合. . . . . . . . . . . . . 调整或更换
燃烧器不断重复启动, 43 - 燃气供气气压非常接近最低燃气压力开关的 降低最小燃气压力开关设定值。更
而不锁定 设定值,阀门打开之后压力的突然下降造成 换过滤芯。
压力开关临时断开,阀门会立即关闭且燃烧
器停机。压力增加,最低燃气压力开关会重
新闭合而重复点火过程等等。
点火脉冲 44 - 头部调整不当 . . . . . . . . . . . . . . . . . . . . . . . 调整见第 9 页
45 - 点火电极不正确. . . . . . . . . . . . . . . . . . . . . . 调整见第 8 页图 (D)
46 - 风门挡板调整不当,风量太大 . . . . . . . . . . . 调整
47 - 点火出力太大 . . . . . . . . . . . . . . . . . . . . . . . 减少
17
正常运行 / 监测到火焰的时间
控制盒有监控燃烧器正常运行的功能 ( 信号: LED 指示灯绿灯长亮 )。
要使用这个功能,燃烧器点火后等待十秒钟,按住控制盒的复位按钮保持 3 秒钟。
绿色指示灯开始闪烁,如下图所示 .:
绿色 LED 按下按钮超过 3 秒 间隔
长亮至少等待 10 秒钟 信号 3秒 信号
信号 检测到火焰的时间 每次启动此数值都更新。
读取闪烁次数后,燃烧器需要按一下复位按钮重新启
闪烁 1 次 动。
0.4 秒
警告
如果结果是大于 2 秒,点火有延迟。
闪烁 2 次 检查燃气阀组的调节,风门挡板的设置和燃烧头的调
0.8 秒 整。
闪烁 6 次
2.8 秒
18
附录
电气连接
注意
电气接线必须由有相关资质的专业人员执行,对于不
按图接线或自行改变接线连接而造成的损失,利雅路
不负任何责任。
根据 EN 60 335-1 标准要求使用柔性电缆。
所有连接到燃烧器的电缆必须从导缆孔中穿过。
导缆孔可以有不同的用法;下面列出一种:
RS 34-44/1 MZ
1-供温度 / 压力开关 TL 和单相电源的 7- 孔插座。
2- 供燃气阀组,燃气压力开关或检漏设备的 6- 孔插
座。
3-供温度 / 压力开关 TR 的 4- 孔插座
5- 供远程复位用的 2- 孔插座
6 - 6A 穿线管用
( 捅破它,如果需要使用穿线管 6A)
D11833
注意
注意 :
! - 不要将电源相线和零线接反了。反接可能导致因点火失败燃烧器锁定。
- 更换配件时只能使用原厂配件。
19
Electrical panel layout - 电气接线图
1 INDEX - 目录
RS 34/1 MZ
3 RS 44/1 MZ
Functional layout - 功能布局
RS 34/1 MZ
4 RS 44/1 MZ
Electrical wiring is the responsibility of the installation engineer - 安装方负责的电气接线
/1 .A1
Sheet no. - 图表编号
Co-ordinates - 坐标
20
21
RS 34/1 MZ
22
RS 44/1 MZ
23
RS 34-44/1 MZ
KEY TO ELECTRICAL LAYOUT 电气图图例说明
A – Electrical control box A – 控制盒
B – Radio noise filter B – 抗电磁干扰的滤波器
+BB – Components on burners +BB – 燃烧器上的零件
+BC – Components on boiler
+BC – 锅炉上的零件
C1 – Capacitor
C1 – 电容
CN1 – Ionisation probe connector
CN1 – 离子探针接头
H – Remote lockout signalling
H1 – Lockout YVPS H – 远程锁定信号
IN – Manual burner stop switch H1 – 锁定 YVPS
ION – Ionisation probe IN – 燃烧器手动停机开关
h1 – Hour counter ION – 电离子探针
K1 – Relay h1 – 计时器
MV – Fan motor K1 – 继电器
PA – Air pressure switch MV – 风机电机
PGM – Maximum gas pressure switch
PA – 风压开关
PGMin – Low gas pressure switch
PGM – 最大燃气压力开关
Q2 – Single–phase knife switch
PGMin – 最低燃气压力开关
RS – Remote reset button
TA – Ignition transformer Q2 – 单相刀闸开关
TL – Limit thermostat/pressure switch RS – 远程复位按钮
TS – Safety thermostat/pressure switch TA – 点火变压器
Y – Gas regulation valve + gas safety valve TL – 温度 / 压力限制开关
YVPS – Gas valve leak detection control device TS – 温度 / 压力安全开关
XP2 – Maximum gas pressure switch connector Y – 燃气调节阀 + 燃气安全阀
XP6 – 6-pole socket YVPS – 燃气泄漏检测装置
XP7 – 7-pole socket
XP2 – 最大燃气压力开关接头
XTB – Shelf earth
XP6 – 6- 孔插座
X2 – 2-pin plug
XP7 – 7- 孔插座
X6 – 6-pin plug
X7 – 7-pin plug XTB – 接地
X2 – 2- 针插头
X6 – 6- 针插头
X7 – 7- 针插头
24
Registered Office - 公司注册所在地 : Manufacturing site: 生产场所 :
RIELLO S.p.A. Riello Heating Equipment (Shanghai) CO., LTD Riello Heating Equipment (Shanghai) CO., LTD
I-37045 Legnago (VR) No. 388, Jinbai Road - Jinshan Industrial Zone 利雅路热能设备 ( 上海 ) 有限公司