Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Parking of equipment Operator Collision Fatality, Permanent 3 4 12 EL/SUB 1. Park at safe leve place 2 4 8 Planning task
Mechanic Interaction with people disability, Long term
Supervisor absence due to treatment ADM
Stripping cab Mechanic Hand injury Permanent disability, Long 2 2 4 PPE 1. Use safety harness when 1 2 2 Monthly inspections/register
Supervisor term absence due to washing at heights and on the ADM
Auto electric treatment edges of walkways
EL/SUB 2. Identify all cables/wires/pipes SWL certificates
when removing ADM
Feb 2010
PT. Leighton Contractors Indonesia
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified 4 2
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Feb 2010
PT. Leighton Contractors Indonesia
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Replace cab with crane Crane operator Falling onto Permanent disability, Long 2 2 4 ADM 1. Lift with caution and guide cab 1 2 2
Mechanic Load slipping term absence due to with guide rope
Supervisor treatment
ADM 2. Good communiaction between
crane operator and spotter
Feb 2010
PT. Leighton Contractors Indonesia
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Remove Lock and Tag Mechanic Unauthorized start when Fatality, Permanent 3 4 12 EL/SUB 1. Clear all work from equipment 2 4 8
Supervisor open rotary disability, Long term
absence due to treatment
ADM 2. Walk around to inspect all
components are secure and no
work present
Start equipment and lower bowl Mechanic Pinned between Fatality, Permanent 3 4 12 ADM 1. Good communication between 2 4 8
Supervisor equipment disability, Long term operator and worker to remove pin
absence due to treatment
ENG/SEG 2. Ensure no worker are between
bowl and equipment
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
1. Lifting procedure
2. ID205-JSEA-P&E-104(03) - General Lifting
register
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
ction
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
Feb 2010