Abstract: The aim of this research work is to carry out fault analysis of 11KV distribution power system. Electric power
is an essential facilitator for sustainable development of the modern nation state. While Nigeria is reported to suffer from
severe shortages of electric power the condition of some of its newer constitutional units are unknown. In this work, electric
power infrastructure and energy availability is studied for Ado-Ekiti, the principal economic and political hub of Ekiti State.
During the study, the condition of all relevant equipment for power distribution at the 11 kV level was assessed. Power
availability was also considered by collecting necessary data that had to do with energy supplied, faults and other outages. It
was discovered that the distribution lines were in a rather poor state with as many as 25% of the poles not meeting a condition
of "goodness", 33% of cross-arms being broken or unsatisfactory, about 10% of the insulators defective and almost 40% of
the span not complying with standards. Hence this work presents a research on fault analysis of Ado Ekiti distribution
power system.
Keywords: Distribution System, Over-current, Feeder, Earth Fault, Differential Fault, Ring Main
a view to quantifying the availability of electric power and Energy flows from the generating stations through the
examining some of the physical factors that may contribute transmission systems to the various loads or customers.
to the poor state of electric power infrastructure so that Transmission lines are used to transfer power economically
remedial suggestions may be proffered for improved system over long distances usually at a voltage not suitable for the
performance. It is in the light of this situation that this customers. At the load distribution points, power is supplied
research has been conceived so as to provide useful in bulk at a lower voltage to selected number of points or
information of the present condition from which rational and substations.
well-thought out improvements can be planned and
implemented. Having analyzed the performance evaluation 4.1. Distribution System
of Ado Ekiti power system, this paper provides all the At tertiary substations, the voltage is stepped down from
expedient solutions to enhance reliability and availability of 33 kV to 11 kV. Subsequently, power is transported through
power supply in Ado Ekiti Power Distribution District. primary distribution lines (also called feeders) to distribution
substations. Distribution substations are situated at
2. Research Problem convenient locations close to the centre of gravity of some
components of the load. Secondary distribution lines (also
The main research objective addressed in this project is to called distributors) emanating from the distribution
carry out an assessment of the electric power distribution substation, deliver the power to the consumers (domestic,
system in the Ado district of Ekiti-State with a view to commercial, industrial etc.) (Riana et al, 1985).
identifying and quantifying important parameters that can
provide concise description of the state of electric power. 4.2. Components of Electric Power Distribution System
shattered insulators, broken or decayed cross-arms and which were then used to obtain the load curves. The load
vegetation encroachment. curves for the feeders for 2009 and 2010 are shown below:
6.1. Component Analysis in the Ado District
Figure 11. Average Hourly Feeder Load curve for Okesha, 2010.
In order to assess the performance of the distribution Figure 13. parameters on Ajilosun Feeder, 2009.
network of the Ado district, daily hourly load readings for
two consecutive years – 2009 and 2010 - were obtained from In this same vein, in 2009 and on Bashiri feeder, there
the Power Holding Company Of Nigeria (PHCN), Ado-Ekiti were 2932 hours of power supply, 3090 hours of blackout,
and distilled into a spreadsheet database using the Microsoft 2364 hours of load shedding, 241 hours of earth fault, 118
excel package from which further statistical and stochastic hours of over-current fault, 3 hours of over-current and earth
analyses were performed. The daily hourly load readings for fault and 12 hours of outage.
the four feeders namely Adebayo, Ajilosun, Bashiri and The figure below shows the contributions of the
Okesha feeders for 2009 and 2010 were separately analyzed parameters:
so as to compare their performances.
The various parameters for analysis include the following:
Duration of Supply, Duration of Blackout, Duration of Load
shedding, Duration of Earth Fault, Duration of Over-current
Fault, Duration of Over-current and Earth Fault, Duration of
Outage, Duration of Fault and Duration of Strike. For
instance in 2009, out of 8760 hours in the year the Adebayo
feeder recorded 2296 hours of power supply, 3509 hours of
blackout, 2123 hours of load shedding, 158 hours of earth
fault, 473 hours of over-current fault, 147 hours of both earth Figure 14. Parameters for Bashiri Feeder, 2009.
32 Kehinde Olusuyi et al.: A Fault Analysis of 11kv Distribution System (A Case Study of Ado Ekiti Electrical
Power Distribution District)
Also, for Okesha feeder, there were 2265 hours of power For the Bashiri feeder in 2010, there were 2878 hours of
supply, 3258 hours of blackout, 3255 hours of load shedding, power supply, 2430 hours of blackout, 2948 hours of load
232 hours of earth fault, 231 hours of over-current, 158 shedding, 218 hours of earth fault, 79 hours of over-current
hours of over-current and earth faults, 91 hours of outage fault, 17 hours of over-current and earth faults, 30 hours of
and 270 hours of miscellaneous fault. The figure below outage, 123 hours of miscellaneous fault and 37 hours of
shows the parameters for the feeder. strike action by PHCN staff. The figure that follows shows
the graphical representation for the feeder.
Figure 22. Total Hours of Earth Fault Total Hrs Total Hrs
Feeder Feeder
of Suply of Suply
Load (A) Load (A)
2009 2010
Feede
Adebayo 176 183 2296 2343
r
Ajilosun 283 265 2891 2813
7. Discussions
7.1. Analysis of Feeder Performance
6.4. Analysis of Faults Experienced between 2001 and 7.2. Power Supply to Feeders
2009 in Ado-Ekiti District
Over the two year period, there were marginal increases in
Faults experienced on the 33kV and 11kV distribution total hours of power supply on Adebayo and Okesha feeders
networks of Ado district between 2001 and 2009 were while there were marginal decreases in that of Ajilosun and
obtained from the Power Holding Company of Nigeria PLC Bashiri feeders.
(PHCN), Ado Business District and distilled into a
spreadsheet database using Microsoft Excel. The database 7.3. Energy Supplied to the Four Feeders
contains details of types of fault cleared on a monthly basis From figure 4.43 in chapter four, it is seen that in 2009,
for the period 2001 and 2009 on both the 11kV and 33kV the Ajilosun feeder has the greatest share of energy supplied
networks. It is however to be noted that the data are with 41% of the total energy. This is followed by Okesha
aggregates of faults cleared on a yearly basis. These details feeder with 23% of the supplied energy and then followed by
are available in the appendix. 20% share by Adebayo feeder. The least energy is supplied
Similarly, number of 11kV earth faults cleared between to Bashiri feeder with just 16% of the total energy supplied.
the period 2003 and 2009 is shown below. This same trend of distribution continued in 2010 although,
with varying percentage contributions.
8. Conclusions
In the course of this project an engineering assessment of
the electric power distribution system in the Ado district of
Ekiti-State has been carried out. The assessment aimed at
investigating the physical state of the distribution system,
operational performance of the system in terms of
determining hours of power supply, hours of black-out,
hours of load shedding, hours of fault as well as obtaining
Figure 26. Earth Faults on 11kV Network between 2003 and 2009.
probabilities of consecutive hours of power at any time of
the day.
The frequency distribution for the earth faults observed on From the results obtained in chapter four of this thesis, it
the 11kV network in Ado district between 2003 and 2009 is is seen that on an annual average basis Ekiti-State is
given in the figure below. experiencing erratic power supply as power may only be
available in about just a third of a year. This is evident in
the fact that power may only be available for three
consecutive hours for 101 days at 2.00a.m on the Bashiri
feeder, the highest value for the four feeders. The low value
is attributable to poor supply from source of power, periods
of load shedding, periods of fault as a result of the poor state
of the lines and other outages whether planned or unplanned.
8.1. Recommendations
distribution network by the Power Holding Company of [13] Desphande, M.V (1993): “Element of Electrical Power
Nigeria (PHCN). Station Design” Third Edition, Wheeler
2. Government should vote more funds to infrastructural [14] Dorf, C Richard (2000): “The Electrical Engineering
development of electric power distribution so that defective Handbook” Boca Raton: CRC Press LLC
components can be replaced as soon as possible.
[15] Ette, A.I.I. (1993): “Facts and Fallacies about Lightning and
3. The radial configuration of the distribution network Rain” Textflow Limited, Ibadan,Nigeria
should be replaced with a ring network so that power can be
supplied from alternative sources. [16] Ewesor, P.O. (2003):”Practical Electrical Systems
4.The right-of-ways should be adequately maintained in Installation- Work and Practice” Ambik Press Limited, Benin
City
order to avoid interruptions on the network as a result of
incidences of fallen trees and creepers. This will also make [17] Fink, D.G and Beaty, H.W (1978): “Standard Handbook for
line tracing much easier. Electrical Engineers” Eleventh Edition, New York:
McGraw-Hill
[18] Gonen, Turan (1986): “Electric Power Distribution System
References Engineering” International Edition, McGraw-Hill Book
Company.
[1] Adegboye, B.A. (1998): “Failure Analysis of the 11kV
Primary Distribution Feeders” National Engineering [19] Gonen, T (1988): “Electric Power Transmission
Conference Series vol. 5 No. 1, pp47-52 Engineering” New York: Wiley p.723
[2] Aduloju, A.O. (2003): “Electrical Power Systems” [20] Green, A.E and Bourne, A.J (1972): “Reliability
Evidence Nigeria Ventures, Ilorin, Nigeria Technology” New York: Wiley-Interscience
[3] Akinsanya, O.A.(2005): “Electrical Power system in [21] Gross, C.A. (1986): “Power System Analysis” Second
Ekiti-State Problems and Suggestions” Proceedings of 1st Edition. New York: Wiley
Engineering Forum, School of Engineering, The Federal
Polytechnic, Ado- Ekiti on Capacity Building in [22] Gungor, B.R. (1988): “Power Systems” New York: Harcourt
Infrastructural Maintenance. Pp28-32 Brace Jovanovich
[4] Allan, Ron and Billinton, Roy (2000): “Probabilistic [23] Gupta, B.R. (2005): “Power System Analysis and Design”
Assessment of Power Systems” Proceedings of the IEEE, vol. Fourth Edition S. Chand & company Ltd.
88, No. 2 [24] Henley, E.J and Kumamoto, H (1991): “Probabilistic Risk
[5] Billinton, Roy and Allan N Ronald (1984): “Reliability Assessment-Reliability Engineering Design, and Analysis”
Evaluation of Power Systems” London, England: Pitman New York: IEEE press
Advanced Publishing Program, 1984. [25] http://hdrstats.undp.org/2008/
[6] Billinton, R and Allan R.N (1992): “Reliability Evaluation of [26] “IEEE Transactions on Reliability” New York: Institute of
Engineering Systems: Concepts and Techniques” Second Electrical and Electronics Engineers
Edition,New York: Plenum
[27] Kjolle, Gerd and Sand, Kjell (1991): “RELRAD – An
[7] Brass, D.F.S et al (1966): “Electric Power Distribution, Analytical Approach for Distribution System Reliability
415V-33kV” E.O Taylor and G.A Boal (eds), London: Assessment” IEEE Transactions on Power Delivery, vol. 7,
Edward Arnold, p272 Brown, E Richard (1988): “Electric No. 2
Power Distribution Reliability” Second Edition, New York:
John Wiley & Sons [28] Lewis, E.E (1987): “Introduction to Reliability Engineering”
New York: John Wiley & Sons
[8] Brown, R.E, Gupta, S, Christie, R.D, Venkata, S.S and
Fletcher, R (1996): “Distribution System Reliability [29] Modigie, J.J. (2005): “Electricity Generation, Transmission
Assessment Using Hierarchical Markov Modelling” IEEE and Distribution” Unpublished monograph, National
Transactions on Power Delivery, vol. 11 No.4 Electric Power Authority
[9] Burke, J. James (1994): “Power Distribution Engineering– [30] O’Connor, P.D.T (1985): “Practical Reliability Engineering”
Fundamentals and Applications” Marcel Dekker, Inc Third Edition. New York: John Wiley & Sons
[10] Da Silva, M.G, Rodrigues, A.B, de Castro, C.L.C, Neto, A.C, [31] Pansini, J. Anthony (1971): “Basic Electrical Power
Moutinho, E.A, Neto, N.S.A and Cavalacante, A.B (2004): Distribution” Volume 1, revised second Edition, Hayden
“Reliability Assessment of Distribution Networks in Brazil’s Book Company, Inc.
northeast” 8th International Conference on probabilistic
Methods Applied to Power Systems, Iowa State University, [32] Pansini, J. Anthony, (1986): “Electrical Distribution
September 12-16 Engineering” McGraw-Hill Book Company.
[11] Davies, T (1984): “Protection of Industrial Power Systems” [33] Pecht M. G. and Nash F.R (1994): “Predicting the Reliability
Pergamon Press. of Electronic Equipment” Proceedings of the IEEE, vol. 82
No. 7, 994-1004
[12] Debs, A.S. (1988): “Modern Power Systems Control and
Operation” New York: Kluwer Academic Publishers. [34] Power Holding Company of Nigeria, Ado-Ekiti Business
District, Annual Reports 2001-2009
36 Kehinde Olusuyi et al.: A Fault Analysis of 11kv Distribution System (A Case Study of Ado Ekiti Electrical
Power Distribution District)
[35] Power Holding Company of Nigeria, Ado-Ekiti Business on Power Systems, vol. II, No.2
District, 11kV Daily Hourly feeder Loading Log book
2009-2010 [43] Trivedi, K.S (1992): “Probability and Statistics with
Reliability, Queuing and Computer Science Applications”
[36] Proceedings: “Annual Reliability and Maintainability Englewood Cliffs, N.J.: Prentice-Hall
Symposium” New York: Institute of Electrical and
Electronics Engineers [44] Uwaifo, S.O (1994): “Electric Power Distribution Planning
and Development” Malthouse Press Limited.
[37] Ramakumar, R (1993): “Engineering Reliability:
Fundamentals and Applications” Englewood Cliffs, N.J.: [45] Villemeur, A (1992): “Reliability, Availability,
Prentice-Hall Maintainability and Safety Assessment, volumes I and II”
New York: John Wiley & Sons
[38] Riana, K.B., et al. (1985): “Transmission and Distribution of
Electric Power” Tata McGraw-Hill Publishing Company [46] Weedy, B.M (1980): “Underground Transmission of Electric
Limited Power” New York: Wiley P294
[39] Shooman, M.L (1990): “Probabilistic Reliability: An [47] Weedy, B.M (1987): “Electric Power Systems” New York:
Engineering Approach” Second Edition. John Wiley & Sons
[40] Malabar, Fla: R.E Krieger Publishing Company Siewiorek, [48] Weeks, W.L (1981): “Transmission and Distribution of
D.P and Swarz, R.S (1982): “The Theory and Practice of Electric Energy” New York: Harper & Row p302
Reliable System Design” Bedford Mass: Digital Press
[49] Woczynski, E, Billinton, R, and Wacker, G (1984):
[41] Stevenson, W.D. (1982): “Elements of Power System “Interruption Cost Methodology and Results – A Canadian
Analysis” 4th Edition, McGraw Hill International. Commercial and Small Industry Survey” IEEE Transactions
on power Apparatus and Systems, vol. PAS-103, No. 2
[42] Sullivan, J Michael, Suddeth, B Noland, Vardell, Jerry and
Vojdani (1996): “Interruption Costs, Customer Satisfaction [50] Wood A.J and Wollenberg, B.F (1984): “Power Generation,
and Expectations for Service Reliability” IEEE Transactions Operation and Control” New York: John Wiley & Sons