Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Parking of equipment Operator, Interaction with people / Fatality, Permanent 3 4 12 ADM 1. Use spotter 2 4 8 Take-5
Mechanic, equipment disability, Long term ADM
Supervisor. absence due to treatment
EL/SUB 2. Park on level safe area
Lock out of equipment Operator, Moving equipment Fatality, Permanent 2 4 8 ADM 1. Lock out & tag out 1 2 2 JSEA
Mechanic, sudden movement disability, Long term ADM
Supervisor. running away equipment absence due to treatment
EL/SUB 2. Use three contact point when
climbing equipment steps
Lifting equipment Mechanic, Faulty lanyard Permanent disability, Long 2 3 6 ADM 1. Inspect lanyard lift prior to use 1 3 3
Supervisor. term absence due to
treatment
ADM 2. Test lanyard lift
Feb 2010
PT. Leighton Contractors Indonesia
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Support equipment at the back Mechanic, Slippery equipment and Permanent disability, Long 2 3 6 ADM 1. Use correct stands 2 3 6 1. Inspect stand prior to use
Supervisor. Falling equipment term absence due to ADM
treatment
ADM 2. Check SWL in OEM 2. Monthly inspection
ADM
Remove wheels Mechanic, Interaction with people & Permanent disability, Long 3 2 6 ADM 1. Inspect impact / tools 1 3 3 SIMPER
Supervisor. equipment term absence due to ADM
treatment
ENG/SEG 2. Use correct tools to remove nuts
Feb 2010
PT. Leighton Contractors Indonesia
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Remove cover and side shaft Mechanic, Cover and ride fall & slip Fatality, Permanent 2 2 4 ADM 1. Ask help to remove cover & shaft 1 2 2
Supervisor. disability, Long term
absence due to treatment
ADM 2. Ensure firm grip to remove safely
Remove final drive Mechanic, supervisor Falling final drive Permanent disability, Long 2 3 6 ADM 1. Drain oil in dril tray 2 3 6 ADM SWL a chain & monthly regis
term absence due to
treatment
ADM 2. Secure chain to final drive and at
correct position
Using crane to remove final drive Mechanic, Interaction between Permanent disability, Long 3 3 9 ADM 1. Crane operator SIMPER 1 3 3 Monthly inspect & monthly re
Superintendent, people & moving term absence due to ADM
Crane Operator. equipment treatment
ADM 2. Crane checklist
Feb 2010
PT. Leighton Contractors Indonesia
Approved By :
9 3
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Crane move & carry final drive Crane operator, Final drive slip & fall, Permanent disability, Long 3 3 9 EL/SUB 1. Drive slow with crane 2 3 6
Mechanic, interaction with people term absence due to
Superintendent. treatment
ADM 2. Don't drive over object
Lifting new final drive Crane operator, Final drive not secure & Fatality, Permanent 3 3 9 ADM 1. Hook chain an correct position an 2 3 6 SWL of chain monthly reg
Mechanic, slip disability, Long term final drive ADM inspection
Supervisor. absence due to treatment
EL/SUB 2. All stand clear when lifting with
crane
Feb 2010
PT. Leighton Contractors Indonesia
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified 9 6
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Fit new final drive Crane operator, Pinch and pinched hand Fatality, Permanent 2 2 4 ADM 1. Good communication 1 3 3
Mechanic, or worker disability, Long term
Supervisor absence due to treatment
ENG/SEG 2. Don't use finger to line final drive
Secure final drive to lift Mechanic, Falling final drive Permanent disability, Long 2 3 6 EL/SUB 1. Come that bolts are tighter before 1 3 3
Supervisor term absence due to removing chain
treatment
ADM 2. Tighter all bolts as per EOM
Fit drive shaft Meqchanic, Slip & fall Permanent disability, Long 1 2 2 ADM 1. Ask for assisting if shaft to heavy 1 2 2
Supervisor term absence due to
treatment
Feb 2010
PT. Leighton Contractors Indonesia
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental 2 2
Environmental Aspect Impact
Fit cover onto final drive Mechanic, Slip onto feet Permanent disability, Long 1 2 2 ADM 1. Ask for assisting if come to heavy 1 2 2
Supervisor. term absence due to
treatment
ENG/SEG 2. Use pinch far to guide cover into
place
Fit wheels (nuts) Mechanic, Interaction between Permanent disability, Long 1 3 3 BHV 1. All work stand clear 1 3 3 Manitou / tyre handle checklis
Supervisor, works / equipment term absence due to ADM
Tyreman treatment
EL/SUB 2. Use rooter to warn SIMPER
ADM
Feb 2010
PT. Leighton Contractors Indonesia
Approved By :
3 3
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Feb 2010
PT. Leighton Contractors Indonesia
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Lifting equipment and remove stands Mechanic, Hard / head injury Permanent disability, Long 2 3 6 ADM 1. SWL of jack 1 3 3
Supervisor, term absence due to
Tyreman treatment
EL/SUB 2. Lift slow & steady
Remove log out & tags Mechanic, Slip & fall Permanent disability, Long 2 3 6 EL/SUB 1. Ensure all workers are safe 1 3 3
Supervisor, term absence due to position
Tyreman treatment
EL/SUB 2. Ensure all parts are secured and
safe for wear
Feb 2010
PT. Leighton Contractors Indonesia
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Stand of equipment & remove from workshop Mechanic, Run over by Fatality, Permanent 3 4 12 ADM 1. Use spotter 2 4 8
area Supervisor. disability, Long term
absence due to treatment
BHV 2. Be visible to operator
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
r to use
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
thly register
onthly register
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
ly reg
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
e checklist
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
Feb 2010
am
ols Required By whom By When Status Legal and Other Requirements Reference
Feb 2010