Bandung LRT Summary PDF
Bandung LRT Summary PDF
Bandung LRT Summary PDF
Project Summary
as part of his commitment to deliver his best for his beloved city,
Commercial Area
Industrial Area
Residential Area
Open Space
4A. Scenarios on Each Corridor
• Scenario 1 (S1) - The condition of transportation
without revamping
• Scenario 2 (S2) - The condition of the
transportation network restructuring public
transport services
• Both scenarios were analyzed for the following
rates:
– Corridor 1 (ATL 3.70 km) - K1: Rate IDR 6000, -
– Corridor 2 (ATL 8,30 km):
• K2A: Rate IDR 7.500,-
• K2B: Rate IDR 12.500,-
6. Corridor 1
No Station Sub-District District
1 Babakan Siliwangi Lebak Siliwangi Coblong
2 Simpang Dago Lebak Siliwangi Coblong
3 UNPAD Lebak Gede Coblong
4 Panatayuda Lebak Gede Coblong
5 Dukomsel Citarum Bandung Wetan
6 Sultan Agung Citarum Bandung Wetan
7 BIP Citarum Bandung Wetan
8 Balaikota Babakan Ciamis Sumur Bandung
9 Braga Braga Sumur Bandung
10 Tamblong Kebon Pisang Sumur Bandung
11 Asia Afrika Balong Gede Regol
12 UNPAS Cikawao Lengkong
13 Karapitan Paledang Lengkong
14 Tegal Lega Ciateul Regol
15 Immanuel Situsaeur Bojongloa Kaler
16 Leuwipanjang Situsaeur Bojongloa Kaler
7. Corridor 2
Cost Estimation
Corridor 1
USD 168.863.470
Cost Estimation
Corridor 2
USD 286.333.710
9. Financial Analysis
10. Construction Ilustration
3.0 M 7.0 M
3.7 M
7.0
1.5 x 1.5 2.0 7.0
18.4
11. Mumbai Monorail – Benchmark
11. Mumbai Monorail – Benchmark