132Kv Control & Supervision 11Kv Control & Supervision Engineering

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 1

132kV CONTROL & SUPERVISION 11kV CONTROL & SUPERVISION ENGINEERING

E see sheet 6

SICAM SICAM SICAM SICAM 3) 3) Software SICAM plusTOOLS


Win CC Win CC Win CC Win CC Software AVR for Voltage Regulation
Software CR for Power Factor Regulation *)
Client 1 Client 2 Engineering
Office
Printer

Com 1
Com 2
OLM OLM

Dial-up Connection for Remote Service

Terminal LAN Ethernet TCP/IP

A see sheet 8
OLM OLM B see sheet 8

Server 1 Server 2
Dotmatrix Dotmatrix
GPS OLM OLM
Receiver
LDC

Process LAN Ethernet TCP/IP

OLM OLM
SCADA *)

IEC 60870-101
Switch
Trans. Unit Trans. Unit SCADA SYS
Box 2)
Time Sync. Box
Fa. Hopf MPI MPI
SICAM SICAM
SAS STATION SAS STATION
CONTROLLER 1 CONTROLLER 2

Parallel Connection (Hardwire)

OLM OLM OLM OLM OLM OLM

FMS FO Circle 1 see sheet 3 FMS FO Circle 2 see sheet 4 FMS FO Circle 2 see sheet 5

BAY Protection BAY Protection BAY CONTROL & BAY CONTROL & BAY CONTROL & BAY CONTROL &
11kV Switchgear
CONTROL UNIT Relais CONTROL UNIT Relais PROTEC. DEV. PROTEC. DEV. PROTEC. DEV. PROTEC. DEV.
6MD664 7SA522 1) 6MD664 7SA522 1) 7SJ6 7SJ6 7SJ6 7SJ6

BAY BAY BAY BAY


PROTEC. DEV. PROTEC. DEV. PROTEC. DEV. PROTEC. DEV.
7.... 7..... 7.... 7.....

*) Not in SIEMENS Scope of Supply


1) Only for Cable Feeder
132kV Switchgear
2) Switch Box for Remote Connection IEC 60870-101
OLM Optic Link Module
Starcoupler for Details see sheet 6+7 MPI Multi Point Interface (for Service)

A Rev. 19.03.01 Bo Date 01.03.2001 ADWEA Abu Dhabi T


B Rev. 13.08.01 Bo Drawn Bojer Substation W1 SIEMENS AG SCMS Configuration
Appr. 132/11kV SUBSTATION Sheet: 2
(4) E50414-S1243-S001