0% found this document useful (0 votes)
197 views3 pages

Gantt Chart

Gantt Chart for project managment

Uploaded by

Milton
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
197 views3 pages

Gantt Chart

Gantt Chart for project managment

Uploaded by

Milton
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Gantt chart

A Gantt chart is a type of bar chart that illustrates a project schedule. Gantt charts illustrate
the start and finish dates of the terminal elements and summary elements of a project.
Terminal elements and summary elements constitute the work breakdown structure of the
project. Modern Gantt charts also show the dependency (i.e., precedence network)
relationships between activities. Gantt charts can be used to show current schedule status
using percent-complete shadings and a vertical "T
ODAY" line as shown here.

Although now regarded as a common charting technique, Gantt charts were considered
revolutionary when first introduced.[1] This chart is also used in information technology to
represent data that has been collected.

A Gantt chart showing three kinds of schedule


dependencies (in red) and percent complete
indications.
Contents
Historical development
Example
Gantt chart baseline
Gantt chart timeline
Further applications
See also
Citations
References
Further reading
External links

Historical development
The first known tool of this type was developed in 1896 by Karol Adamiecki, who called it a harmonogram.[2] Adamiecki did not publish his chart until
1931, however, and only in Polish, which limited both its adoption and recognition of his authorship. The chart is named after Henry Gantt (1861–1919),
[3][4]
who designed his chart around the years 1910–1915.

World War I, at the instigation of General William Crozier.[5]


One of the first major applications of Gantt charts was by the United States during

In the 1980s, personal computers allowed widespread creation of complex and elaborate Gantt charts. The first desktop applications were intended mainly
for project managers and project schedulers. With the advent of the Internet and increased collaboration over networks at the end of the 1990s, Gantt charts
became a common feature of web-based applications, including collaborative
groupware.

Example
In the following table there are seven tasks, labeled a through g. Some tasks can be done concurrently (a and b) while others cannot be done until their
predecessor task is complete (c and d cannot begin until a is complete). Additionally, each task has three time estimates: the optimistic time estimateO),
( the
most likely or normal time estimate (M), and the pessimistic time estimate (P). The expected time (TE) is estimated using the beta probability distribution
for the time estimates, using the formula O
( + 4M + P) ÷ 6.
Time estimates
Activity Predecessor Expected time (TE)
Opt. (O) Normal (M) Pess. (P)
a — 2 4 6 4.00
b — 3 5 9 5.33
c a 4 5 7 5.17
d a 4 6 10 6.33
e b, c 4 5 7 5.17
f d 3 4 8 4.50
g e 3 5 8 5.17

Once this step is complete, one can draw a Gantt chart or a network diagram.

A Gantt chart created usingMicrosoft Project (MSP). Note (1) the critical path is in red, (2) the slack is the black lines connected to
non-critical activities, (3) since Saturday and Sunday are not work days and are thus excluded from the schedule, some bars on the
Gantt chart are longer if they cut through a weekend.

Gantt chart baseline


Baseline in Gantt chart is used for clear comparison picture of what and how was planned and the current state of a project. Thus a manager or anyone who
manages a project is able to see whether a schedule deviates from the initial plan. A project will be successfully accomplished when everything goes
according to a baseline.

A baseline gives a manager possibility to understand and track project progress and forecast project results. Generally
, baselines are a combination of project
scope, cost and schedule (time) that are called triple constraints of a project.

Thanks to baselines a project manager knows what exactly goes wrong and how much it takes. They help to realize problematic points and minimize them.

Gantt chart timeline


A timeline is an order of events or actions placed along a bar where time periods are labeled. It is a good way to visualize all tasks and events that have start
and end dates.

A Gantt chart is one of the easiest and most popular ways to visualize events along a timeline. It clearly shows which tasks are already finished, which ones
are in progress or lay ahead. Timelines also show tasks dependencies and any delays in a project.

To make a timeline in a Gantt chart, one needs to know all tasks, dependencies, durations, and dead
lines.

Further applications
Gantt charts can be used for scheduling generic resources as well as project management. They can also be used for scheduling production processes and
employee rostering.[6] In the latter context, they may also be known as timebar schedules. Gantt charts can be used to track shifts or tasks and also vacations
or other types of out-of-office time.[7] Specialized employee scheduling software may output schedules as a Gantt chart, or they may be created through
popular desktop publishing software.

See also
Critical path method
Float (project management)
Henry Gantt
List of project management software, which includes specific Gantt Chart software.
Program evaluation and review technique(PERT)

Citations
1. Wilson 2003.
2. "The Harmonogram of Karol Adamiecki – T
ags: ADAMIECKI, Karol ORGANIZATION charts" (http://connection.ebscohost.com/c/proceedi
ngs/17530521/harmonogram-karol-adamiecki). Connection.ebscohost.com. Retrieved 4 June 2014.
3. Gantt 1910.
4. Morris 1997, p. 7.
5. Clark 1922.
6. Triant G. Flouris; Dennis Lock (2009).Managing Aviation Projects from Concept toCompletion (https://books.google.com/books?id=rNCZ
7dEtTJMC&pg=PA207). Ashgate Publishing, Ltd. pp. 207–.ISBN 978-0-7546-7615-7.
7. "Availability Planning" (http://ceiton.com/CMS/EN/scheduling/attendance.html#Out-of-Of
fice). CEITON. Retrieved 4 June 2014.

References
Clark, Wallace (1922). The Gantt Chart: A Working Tool of Management. New York, NY: Ronald Press.
Gantt, H.L. (1910). "Work, Wages and Profit". Engineering Magazine. New York.; republished as Work, Wages and Profits. Easton,
Pennsylvania: Hive Publishing Company . 1974. ISBN 0-87960-048-9.
Morris, Peter W. G. (1997) [1994]. The Management of Projects. Thomas Telford. ISBN 978-0-7277-2593-6.
Wilson, James M. (2003)."Gantt charts: A centenary appreciation"(PDF). European Journal of Operational Research. 149 (2): 430–437.
doi:10.1016/S0377-2217(02)00769-5. Archived from the original (PDF) on 26 November 2013. Retrieved 28 July 2013.

Further reading
Burkhard, Remo Aslak; Meier, Michael; Rodgers, Peter; Smis, Matthias Thomas Jelle; Stott, Jonathan (2005).Knowledge visualization: A
comparative study between Project Tube Maps and Gantt Charts. 5th International Conference on Knowledge Management. Graz,
Austria: University of Kent. Retrieved 17 September 2017.
Geraldi, Joana; Lechter, Thomas (2012). "Gantt charts revisited: A critical analysis of its roots and implications to the management of
projects today". International Journal of Managing Projects in Business . 5 (4): 578–594. doi:10.1108/17538371211268889.
Kumar, Pankaja Pradeep (2005)."Effective use of Gantt chart for managing large scale projects" . Cost engineering. 47 (7): 14-21.
ISSN 0274-9696. Retrieved 17 September 2017.
Marsh, Edward R. (1975). "The Harmonogram of Karol Adamiecki".Academy of Management Journal. 18 (2): 358–364.
doi:10.2307/255537. JSTOR 255537.
Maylor, Harvey (2001). "Beyond the Gantt chart: Project management moving on".European Management Journal. 19 (1): 92–100.
doi:10.1016/S0263-2373(00)00074-8.

External links
Long-running discussionregarding limitations of the Gantt chart format, and alternatives, onEdward Tufte's website

Retrieved from "https://en.wikipedia.org/w/index.php?title=Gantt_chart&oldid=818211970


"

This page was last edited on 2 January 2018, at 07:15.

Text is available under theCreative Commons Attribution-ShareAlike License ; additional terms may apply. By using this site, you agree to the
Terms of Use and Privacy Policy. Wikipedia® is a registered trademark of theWikimedia Foundation, Inc., a non-profit organization.

You might also like