Binh Truc
15 Song Da The Dorm
No. Task Deadline Notes No. Task Deadline Notes
General for HCMC
1 Price reference for rental apar 12pm 9/12/201 1 Accounting 12/15/2017
Specific for the TSN airport area
List of Services
List of HR
2 Operation Cost 12pm 9/12/201 2 Steel Work 12/19/2017 Design Confirmation required
List of Expense
Proposed Cost estimation
List of interior components
Proposed standard
3 Design Concept (Interior) 6pm 12/12/201 3 Website 12/20/2017 Algorithm of booking engine
Proposed method of purchasing
Preliminary Cost estimation
List of works
4 Budget Estimation 6pm 13/12/201 4 Affiliate 12/14/2017 Photo upload required
Preliminary Cost estimation
5 Financial Model 6pm 14/12/201Provide information on the profitability of the project 5 Tax 12/13/2017 A Thu signature required
6 Tours, nightlife, local food 12/13/2017 Final revision