All You Need to Know
Start
Version 1.10
December 2017
PUBLIC
Note: You might notice problems with links included in this PDF.
To avoid this, we recommend to view it in
full-screen mode (Single Page View; Fit to page)
Transition to SAP Solution Manager 7.2 |<
All You need to know
Upgrade Strategy
Yes No
Yes No
Yes No
For upgrading your existing SAP Solution Manager 7.1 to release 7.2, please refer to the following
information:
▪ SAP Solution Manager 7.2 Master Guide
▪ SAP Solution Manager 7.2 Upgrade Guide
▪ Update of SAP Systems Using Software Update Manager
▪ Meet-the-Expert SAP Solution Manager 7.2: Browse recorded sessions in SAP Enterprise Support Academy
Yes No
Reduced data volume accelerates the upgrade time and reduces hardware cost
Typical areas for data reduction:
Knowledge Warehouse documents in projects
Remove outdated service and other reports
Remove unused solutions and projects
Archiving of Reporting Documents / Service Reports
For the migration of an existing database system start sizing from current data volume
Requirements for application servers do not change fundamentally i For more information on sizing
evaluation see SAP Note 1793345
In addition there is a Sizing Estimation Report to run in the existing For more information on sizing
TREX is not required if SAP Solution Manager 7.2 is deployed on SAP Hana
Embedded Search is mandatory in SAP Solution Manager 7.2 for Process Management and its
Solution Documentation!
You can additionally use Embedded Search in your SAP Solution Manager 7.2 for
▪ Quality Gate Management (QGM),
▪ Change Request Management,
▪ Service Delivery
▪ IT Service Management
▪ Business Process Monitoring
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 10
Knowledge Transfer Products for SAP HANA Operations
Basic and Introduction How to Configure How to Use
HA200
SAP Training HA100 HANA Installation & Administration
Class room trainings Key concepts, architecture, landscape, Installation, Migration,
Center modeling, HANA Studio trouble shooting, operations,
Performance Management
Monitoring &
Advanced Monitoring
Troubleshooting
Enterprise Expert Guided
Implementation Data Administration &
Support Operations
Academy
Make Your Custom Code
Data Modelling
Ready
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 11
Transition to SAP Solution Manager 7.2
Upgrade vs. New Installation?
Reduced data volume accelerates the upgrade time and reduces hardware cost
Typical areas for data reduction:
Knowledge Warehouse documents in projects
Remove outdated service and other reports
Remove unused solutions and projects
Archiving of Reporting Documents / Service Reports
Consider to perform a new installation of SAP Solution Manager 7.2 instead of upgrading your
existing SAP Solution Manager 7.1 to 7.2
▪ This implies that you have to re-configure all functions that you are currently using on the existing SAP Solution Manager
7.1 in the new release
▪ Existing data and custom code will be lost unless preserved somewhere else
Useful References:
▪ SAP Solution Manage 7.2 Master Guide
▪ Installation of SAP Netweaver 7.X-based systems:
(Provide your Database and Operation System Platform, select SAP Netweaver 7.X-based and download the guides for ABAP and Java)
▪ Meet-the-Expert SAP Solution Manager 7.2: Browse recorded sessions in SAP Enterprise Support Academy
Size and Prepare Install ABAP and Java and Implement current SP-stack Configure
Calculate Sizing in Quick Sizer tool and Installation of ABAP and Perform Mandatory configuration of SAP
define system with Maintenance Planer Java Systems with SWPM Implement SP-stack with SUM Solution Manager 7.2 and relevant scenarios
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 14
New Installation: Sizing
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 15
Transition to SAP Solution Manager 7.2
Upgrade vs. New Installation?
Yes No
HA200
SAP Training HA100 HANA Installation & Administration
Class room trainings Key concepts, architecture, landscape, Installation, Migration,
Center modeling, HANA Studio trouble shooting, operations,
Performance Management
Monitoring&
Advanced Monitoring
Troubleshooting
Enterprise Expert Guided
Implementation Data Administration&
Support Operations
Academy
Make Your Custom Code
Data Modelling
Ready
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 17
End of Section
–
Upgrade vs. New Implementation
Back
Scenario-Specific Upgrade Information
Continue
Transition to SAP Solution Manager 7.2 Back
Scenario-Specific: Content Activation
Yes No
In SAP Solution Manager 7.2, the Solution Documentation scenario has been rebuilt completely,
and central landscape elements have changed. To be able to work with existing content in the new
environment, this content needs to be transferred. This process is called “content activation”.
▪ See the Content Activation Wiki
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 21
Scenario-Specific Upgrade Information
Content Activation
Do you have a landscape with both a maintenance and development system (dual
landscape)?
▪ If yes, the recommended branch setup is: Production/Maintenance + Development (see Process
Management Wiki)
Do you have at least one landscape with multiple production systems or clients behind a
development system (localization / sites)?
▪ If yes, use the site concept (see Process Management Wiki)
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 22
Scenario-Specific Upgrade Information Back
Please take a look at all scenarios you are using in your current SAP Solution Manager 7.1
Data Volume
Test Management Project Management
Management
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 25
Scenario-Specific Upgrade Information
Solution Documentation (3/3)
Yes No
Do you have UPL data collection activated and already data in SoluMan?
▪ If yes, data migration is necessary. For that you need to rerun solman_setup ccm guided procedure as
described in the slide deck Highlights in CCLM 72
▪ Implement Custom Code Management master note
– CCM 7.2 SP05 Master Note: 2450435
– CCM 7.2 SP04 Master Note: 2390766
– CCM 7.2 SP03 Master Note: 2336680
– In case of implementation issues, please refer to
SAP note 2482431 - 7.2 CCM Master Note - How to implement correctly.
▪ Check housekeeping settings and if necessary clean-up the collected UPL data
▪ For additional information refer to SAP Solution Manager Upgrade Guide.
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 28
Scenario-Specific Upgrade Information Back
Test Management
Which post-upgrade activities are required?
▪ Create Business Partner for all Test Management Users
▪ Upgrade CBTA client to CBTA 3.0 SP07
▪ Reactivate Jobs for UPL/SCMON
▪ Migration of BW Cubes
▪ BPCA – adjust Optimization Approach
▪ Check Transaction Types for Test Defects (SMIN, SMDT,….)
▪ Standard Test Management Configuration (Test Status Values, Test Classification etc.)
SAP Enable Now is the successor product of SAP Workforce Performance Builder
▪ Documentation: SAP Enable Now
▪ Documentation: SAP Enable Now: SAP Solution Manager 7.2 Integration
▪ How To: SAP Enable Now: SAP Solution Manager 7.2 Integration
▪ Tutorial: SAP Solution Manager Integration
SAP Enable Now is an end-to-end solution to collaboratively create, manager and deliver:
Formal training Informal learning Performance support
Have you integrated SAP Solution Manager 7.1 with SAP Workforce Performance Builder 9.5?
▪ Do you plan to continue using the integration after the upgrade to SAP Solution Manager 7.2?
– Because of the changes in SAP Solution Manager 7.2, the interface for connecting to the SAP Solution
Manager 7.2 has been completely reworked. For using the new interface it is necessary to upgrade WPB 9.5
to the successor product SAP Enable Now.
▪ Do you plan to upgrade WPB 9.5 to SAP Enable Now before the SAP Solution Manager upgrade?
– If Yes: SAP Enable Now uses the same interface for the connection to SAP Solution Manager 7.1 as WPB
9.5. In addition, SAP Enable Now supports a connection interface to SAP Solution Manager 7.2 (SP-stack 3
or higher). After the Upgrade to SAP Solution Manager 7.2, a re-connection and a content re-import will be
necessary.
– If No: The connection to SAP Solution Manager 7.2 must be re-established and the content has to be re-
imported. Then references to the SAP Solution Manager process structure have to be synced again.
Do you use Technical Monitoring functionality in SAP Solution Manager 7.1 and do you need
information about scenario impact and required pre- and post-upgrade activities before
starting to use this function after the upgrade?
▪ Slightly extended functionality. Necessary activities from the Upgrade side are explained in the SAP note
2227300.
▪ We recommend to check and if necessary to adjust Monitoring Templates and properly test the scenario
before starting productive usage of Technical Monitoring after the Upgrade.
Do you use End-User Experience Monitoring in SAP Solution Manager 7.1 and want to learn
about impact and pre- and post-upgrade activities before starting to use this function in 7.2?
▪ End-User Experience Monitoring has been renamed to User Experience Monitoring (UXM).
▪ User Experience Monitoring got a new UI5-based user interface and new layout. We recommend to get first
experience with this function before starting productive usage.
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 35
Scenario-Specific Upgrade Information Back
Application Operations (2/2)
Do you use Root Cause Analysis in SAP Solution Manager 7.1 and do you need information
about impact and pre- and post-upgrade activities before starting to use this function in 7.2?
▪ New user interface, functionality has been slightly enhanced. All functions from 7.1 should run again after the
Upgrade and stack split (optional DB Migration) and Mandatory Configuration. For additional information
refer to SAP Note 2227300
▪ SAP Note 2248724 – Root Cause Analysis in SAP Solution Manager
Do you use EWA reporting and would you like to continue using it after the upgrade?
▪ Because of the changes in the solution concept and product systems, the EWA is based on technical system
and not on solutions any more. There are 3 optional after-upgrade activities described in SAP Note 2110537
(EarlyWatch Alert Setup UI transition to Solution Manager 7.2)
▪ Check SAP Note 2282944 on how to setup / configure EWA email recipients for Solution Manager 7.2
Which SP and monitoring infrastructure of SAP Solution Manager 7.1 do you use for
Business Process Operations (BPOps)?
▪ >= SP12 with Monitoring and Alerting Infrastructure (MAI)
– Do the migration via content activation. Some manual cleanup activities required before migration. Manual
adjustments might be required for BAdIs and some customer monitors. Content activation only migrates
the BPMon configuration to new solution documentation.
▪ >= SP12 with classic CCMS-based infrastructure
– The migration to MAI can already happen on 7.1 system, SAP Note 2345777 needs to be implemented
before migration
– Do the content activation afterwards
▪ <= SP11
– Migration to MAI cannot happen on 7.1. It needs to happen as part of the content activation on 7.2
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 37
Scenario-Specific Upgrade Information
Business Process Operations (2/4)
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 38
Scenario-Specific Upgrade Information
Business Process Operations (3/4)
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 39
Scenario-Specific Upgrade Information Back
Business Process Operations (4/4)
Do you plan testing and adjusting the Roles and Authorization concept for BPOps?
▪ If Yes: Ensure that you have included BPOps authorizations testing and adjustment into the project plan.
▪ If No: Solution Manager Launchpad, Solution Documentation, Job Documentation and the switch to MAI all
require adjusted roles and authorization concept for configuration and consumption
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 40
Upgrade Information: Data Volume Management Back
Back
Upgrade Strategy
Transition to SAP Solution Manager 7.2
Upgrade Strategy
Yes No
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 45
Recommendation:
Read the System Copy Post Processing Guide
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 46
Transition to SAP Solution Manager 7.2
Upgrade Strategy
Yes No
Near-Zero Downtime supports SAP Solution Manager Upgrade to 7.2 with SUM.
▪ Near-Zero Downtime Maintenance technology (nZDM) reduces actual downtime, while the previous
preprocessing phase (system can be used productively) will take longer.
▪ For additional information refer to the Blogs:
– Minimize your downtime of an update
– FAQ of near-Zero Downtime Maintenance
– Downtime Minimization Capabilities of SUM
It is not possible to use Near-Zero Downtime (nZDM) Maintenance option in parallel with simplified procedure for
Upgrade and Migration on SAP Solution Manager 7.2 on HANA DB (SUM with DMO). For additional information
please refer to the article about Downtime Optimized DMO.
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 48
Downtime: Details on Post Upgrade Steps Optimized Downtime for Business
Process Operations and Custom Code
Differences depending on start release Management if start release is
SAP Solution Manager 7.1 SP 12 or higher
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 49
Transition to SAP Solution Manager 7.2
Upgrade Strategy
Yes No
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 51
End of Section
–
Upgrade Strategy
Back
Further Upgrade Information
Transition To SAP Solution Manager 7.2 Back
Further Upgrade Information
Before to start with the SAP Solution Manager Upgrade Planning and Preparation, check the following
documentation:
Upgrade Guide for SAP Solution Manager 7.2
▪ service.sap.com/instguides SAP Components SAP Solution Manager Release 7.2 5 Upgrade
SAP note 2227300 - Further Upgrade Information for SAP Solution Manager 7.2
Master Guide SAP Solution Manager 7.2:
▪ service.sap.com/instguides SAP Components SAP Solution Manager Release 7.2 1 Planning
▪ 2394599 - How to handle your Z transaction types after the upgrade to 7.2
▪ 2403108 - Composite SAP Note: Preparation for content activation for SAP Solution Manager 7.1 as of
SP05
▪ 2257213 - Authorizations for RFC users as of SAP Solution Manager 7.2 SP02
TREX is not required if SAP Solution Manager 7.2 is deployed on SAP Hana
▪ The required hardware for the TREX server software depends on the following factors:
– How many documents of what type are to be indexed?
– What quantities of documents are to be indexed initially, and what quantities during routine operation?
– How many search queries are expected? How many parallel search queries are expected?
▪ For a production TREX system, SAP recommends that you install the server software on a single host that is used
exclusively for TREX.
▪ If TREX is running on the same host as other components, e.g. SAP Solution Manager 7.2, ensure the following:
– There is enough main memory for all components.
– TREX can use the required main memory space exclusively.
Content Activation
~ 6 hours
Therefore we recommend to test the whole upgrade procedure, incl. Functional preparation and scenarios re-
configuration in a Sandbox, copied from production SAP Solution Manager.
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 60
Downtime: Details on Post Upgrade Steps Optimized Downtime for Business Back
Differences depending on start release Process Operations and Custom Code
Management if start release
SAP Solution Manager 7.1 SP 12 or higher
1a: Content Activation
(~ 6 hours, dependent on scope)
2: Additional Configuration
2 hours to 2 days 3: Upgrade Finished
Function prepared 1b: Mandatory Setup
(3 hours)
Function available
Functional Area
Project Management
IT Service Management
Landscape Management
Application Operations
Data Volume Management
Change Control Management
Custom Code Management >= SP12
Business Process Operations >= SP12
Process Management (Solution Documentation)
Test Suite
Do you plan to use scenarios in SAP Solution Manager 7.2 with a new Fiori-based user interface
(e.g. Application Operations, Data Consistency Management …)?
Have you used highly or medium impacted scenarios in 7.1?
If Yes:
▪ Discuss the importance of authorization concept test and possible adjustments before to start the productive
usage of SAP Solution Manager 7.2 after the upgrade.
▪ Some scenarios have been fully reworked and some scenarios are less impacted. Nevertheless, we
recommend to check and if necessary adjust the available authorization concept during the upgrade project.
What do you need to prepare in case you plan to migrate to HANA DB?
▪ Take a look at the SAP EarlyWatch Alert (EWA) of your SAP Solution Manager 7.1 system to check the
current database size and growth rate.
– SAP EarlyWatch Alert
▪ Check used scenarios (e.g. UPL, DVM, ChaRM and so on) and ask to check housekeeping jobs. To get
more arguments, check DVM part of EWA, which tables are in the top10 or top30 (e.g. /BI0/F0SM_UPL* or
DSVASRESULTSGEN (Service Session Workbench) in the top tables with growing trend would be a good
basic for housekeeping and clean up discussion)
– SAP Note 2257558 - SAP Solution Manager on HANA: Data archiving and reduction
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 63
Transition to SAP Solution Manager 7.2 Back
SAP Solution Manager on SAP HANA (2/2)
What do you need to prepare in case you plan to migrate to HANA DB?
▪ Do you know how to do sizing for SAP Solution Manager 7.2 on HANA?
– If yes, verify available sizing according to best practices. If no sizing has been calculated, please refer to
the available best practices
▪ Have you already chosen the upgrade and HANA Migration strategy?
– If no, discuss the available upgrade options (SUM with DMO with HANA Migration as part of upgrade,
Upgrade with SUM, Stack split and then migration to SAP HANA DB with SWPM)
▪ Have you already prepared HANA operations (Suitable hardware has been ordered and prepared, Know-
How available, Monitoring, Guided procedures)?
– If no, discuss about HANA-relevant themes, like sizing, HANA-relevant hardware, Administration,
Monitoring… Join our EGI sessions for HANA Monitoring or our HANA Administration training.
For more information, please refer to: SAP Solution Manager 7.2: Transition and Maintenance
Our goal is that our customers can successfully run the upgrade from SAP Solution Manager 7.1 to
7.2 within a weekend. We are working on the publication of successful customer references.
We are still offering the participation at the Early Adopter Care Program at no costs to all customers
that are planning to run the content activation. https://influence.sap.com/SAPSolutionManager72
Your benefits:
▪ Prioritized message handling
▪ Access to the SAP Learning Hub for SAP Solution Manager
▪ Exchange with other customers in a SAP Jam group
Results of upgrades will be analyzed and promptly integrated into Notes and SPs. That’s valid for
set-up, activation, and usage. As a result, we produce up to 10 times faster runtime of the activation
within Charm.
SAP Solution Manager 7.2 solutions are now available in the SAP
Cloud Appliance Library (CAL).
Continue
*Cloud provider infrastructure fees apply.
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 66
SAP Cloud Appliance Library (SAP CAL)
The idea – simplify SAP consumption and deliver quick business value
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 67
Available SAP Solution Manager 7.2 solutions in SAP CAL Back
Activation Demo/Jumpstart
on SAP CAL on SAP CAL
Version: 7.2 SPS03 Version: 7.2 + Focused
Customer content Build + SAP S/4HANA
upload possible + 1511 fully-activated
managed system
Simple process
management demos + Simple demos + SAP
SAP S/4HANA S/4HANA Packages,
Packages incl. connected system
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 68
SAP Solution Manager 7.2 Upgrade: Enterprise Support
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 69
SAP Solution Manager Upgrade
Offerings within Premium Engagement
Use Case
+ Customer is using Solution Manager with several functional scenarios and has very
INVOLVEMENT OF SAP
Safeguard the Upgrade + Customer is using Solution Manager 7.1 but with very limited use
+ Customer wants SAP to do an impact analysis and planning only
Complexity Level : Basic
ENGAGEMENT SCOPE
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 70
ALM Consulting Services
Continue
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 71
Live Support Expert Chat
Overview
Expert Chat
provides a live chat function that connects you to SAP technical support experts, instantly.
Back
Thank you.
© 2017 SAP SE or an SAP affiliate company. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP SE or an SAP affiliate company.
The information contained herein may be changed without prior notice. Some software products marketed by SAP SE and its distributors contain proprietary software components
of other software vendors. National product specifications may vary.
These materials are provided by SAP SE or an SAP affiliate company for informational purposes only, without representation or warranty of any kind, and SAP or its affiliated
companies shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP or SAP affiliate company products and services are those that are
set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.
In particular, SAP SE or its affiliated companies have no obligation to pursue any course of business outlined in this document or any related presentation, or to develop or release
any functionality mentioned therein. This document, or any related presentation, and SAP SE’s or its affiliated companies’ strategy and possible future developments, products,
and/or platform directions and functionality are all subject to change and may be changed by SAP SE or its affiliated companies at any time for any reason without notice. The
information in this document is not a commitment, promise, or legal obligation to deliver any material, code, or functionality. All forward-looking statements are subject to various
risks and uncertainties that could cause actual results to differ materially from expectations. Readers are cautioned not to place undue reliance on these forward-looking statements,
and they should not be relied upon in making purchasing decisions.
SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE (or an SAP affiliate company)
in Germany and other countries. All other product and service names mentioned are the trademarks of their respective companies.
See http://global.sap.com/corporate-en/legal/copyright/index.epx for additional trademark information and notices.