Steps To Follow Through A Project and How To

The document outlines the steps to follow through a project which includes creating a business requirements document, writing a functional specification, and creating a development plan. It also describes scheduling an architecture review with diagrams and slides. Emergency changes can be requested by sending an exception request to the Executive CAB for approval along with details on the issue, resolution, testing plan, and potential impacts.

Uploaded by

raneetha2015
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views3 pages

Steps To Follow Through A Project and How To

The document outlines the steps to follow through a project which includes creating a business requirements document, writing a functional specification, and creating a development plan. It also describes scheduling an architecture review with diagrams and slides. Emergency changes can be requested by sending an exception request to the Executive CAB for approval along with details on the issue, resolution, testing plan, and potential impacts.

Uploaded by

raneetha2015
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Steps to follow through a Project and How to

1. Creating a business Requirement document


2. Write the functional spec
3. Creating a development object

4. Schedule an arch review


- Architecture Diagram
- Slides

Other:
Emergency
Steps to follow through a Project and How to

CAB Approval:
Emergency Exception Request
0338-13 Smart Equipment and Service Manual
06/04/2014 – 9:00 am
Send this to: IMExecutiveCAB and cc: Manager and Deployment team
For SAP- IMProdTransport For Non-SAP – IMProdAppDeploy
In the Email subject line type: “Urgent, Executive CAB Approval Requested to open config
URL
Tag email as Priority
Change Owner: Raneetha Weerasinghe RFC Number:
Problem/Issue: Need to open client for URL configuration .

Reason this Change Client needs to be opened for URL configuration for Smart equipment catalog.
is an Exception: Each client will be connect to different SE systems. Right now all the testing
clients are pointing to SE production server.
E1D-200Smart Equipment Development System
E1D-100Smart Equipment Development System
E1Q-200Smart Equipment CA System
E1Q-210Smart Equipment CA System
E1S-200Smart Equipment Dev System
ERZ-200Smart Equipment CA system

System/Application: SAP ECC6.0 Smart Equipment System Name and Smart Equipment
Impact to System:

Issue Visibility/Impact: None – Post Go-live support District Impact: None

Workaround Exists? No. End Users 0


Impacted:

Resolution: Open the config URLs

Test/Validation Plan: Check the configuration for URL

Back Out Plan: Revert the changes

Will the fix cause a No.


Service Interruption?
Fix Implementation Est. Service Restore
6/4/2014 9.00AM 6/4/2014 9.30AM
Date and Time: Time and Date:

Team Supporting Kiecore Equipment Task Managers/Supervisors Dan Stuebe, Bill Jaeger,

Send this to: [email protected] and cc: Manager and Deployment team

For SAP- [email protected]

For Non-SAP – IMProdAppDeploy

In the Email subject line type: “Urgent, Executive CAB Approval Requested
Steps to follow through a Project and How to

HPQC

While the development is going on we need to request to create development folders in HPQC

HPQC Support/ Folder Add/Create/Delete and we will take care of this request.

Need to create a service now ticket.

Please create the following in HPQC for Fluid lab project for 07 Minor Release

Create a folder as 0305_13 Fluid Lab under Test Plan 2014_Overall_Project >test plan>Field services> EQP >EQP-Maintain
Equipment

Create folders in Test Lab under 2014.07 Minor releases for 2014_Q3 as follows

01 – FUT >0305_13 Fluid Lab

02 –Cycle 1 > Integration Testing > 0305_13 Fluid Lab

04- Cycle 3 > UAT > 0305_13 Fluid Lab

You might also like