Example of Sheet Pile Calculation

The document calculates sheet pile design for a 12m long retaining wall with a 10 kN/m^2 road surcharge load. It determines: 1) Total active pressure of 760.962 kN/m and passive pressure of 632.269 kN/m. 2) An anchor pull force of 444.82 kN/m is required for a factor of safety of 2. 3) A safe driving depth of 3.048m and maximum bending moment of 301.04 kNm/m is calculated. 4) A Larsen section 16W sheet pile is suitable with a required anchor/soil nail length of 27.73m.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
866 views6 pages

Example of Sheet Pile Calculation

The document calculates sheet pile design for a 12m long retaining wall with a 10 kN/m^2 road surcharge load. It determines: 1) Total active pressure of 760.962 kN/m and passive pressure of 632.269 kN/m. 2) An anchor pull force of 444.82 kN/m is required for a factor of safety of 2. 3) A safe driving depth of 3.048m and maximum bending moment of 301.04 kNm/m is calculated. 4) A Larsen section 16W sheet pile is suitable with a required anchor/soil nail length of 27.73m.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

SHEET PILE CALCULATION

Based on S.I Report

Length of Sheet Pile = 12m

Load surcharge from road = 10 kN/m2

Soil 1- Silty SAND

 = 19 kN/m2
Өº =28º
C=0
K1 = 1 x 10-4 m/sec
D = 6m

Soil 2 – Sandy CLAY

 = 15 kN/m2
Өº = 0º
C = 15
K2 = 1 x 10-7 m/sec
D = 6m
CALCULATION

Ka soil 1 = 1- sin θ
1+ sin θ

= 1 - sin 28º
1 + sin 28º

= 0.361

Kp soil 1 = 1/Kp
= (1/0.361)
= 2.77

Ka soil 2 = 1- sin θ
1+ sin θ

= 1 - sin 0º
1 + sin 0º

=1

Kp soil 2 = 1/Kp

= (1/1)
=1

Active pressure

Due to Surcharge soil 1, Pa = Ka x q x H


= (0.361 x 20 x 6)
= 43.32 kN/m

Due to Surcharge soil 2, Pa = Ka x q x H


= (1 x 20 x 6)
= 120 kN/m

Due to Soil 1, Pa = 1/2 x (Ka x  x H)


= 1/2 x {0.361 x (19-9.81) x 6}
= 9.95 kN/m
Due to Soil 2, Pa = 1/2 x (Ka x  x H)
= 1/2 x {1 x (15-9.81) x 6}
= 15.57 kN/m
Due to Water, Pa = 1/2 x (W x Hw) x H
= 1/2 x 9.81x 10.8 x 10.8
= 572.119 kN/m

Total Active Pressure = (43.32 + 120 + 9.95 + 15.57 + 572.119) kN/m


= 760.962 kN/m

Passive pressure

Due to Soil 1a, Pa = 1/2 x (Kp x  x H)


= 1/2 x {2.77 x (19-9.81) x 1.5}
= 19.09 kN/m

Due to Soil 1b, Pa = 1/2 x (Kp x  x H)


= 1/2 x {2.77 x (19-9.81) x 2}
= 25.45 kN/m

Due to Soil 2, Pa = 1/2 x (Kp x  x H)


= 1/2 x {2.77 x (19-9.81) x 2}
= 25.45 kN/m

Due to Water, Pa = 1/2 x (W x Hw) x H


= 1/2 x 9.81x 10.8 x 10.8
= 572.119 kN/m

Total Active Pressure = (19.09 + 25.45 + 15.57 + 572.119) kN/m


= 632.26 kN/m

Force of the Anchor Pull

Take F.O.S = 2.0

Ap = Total Pa – Total Pp
F.O.S

= 760.962 – 632.269
2
= 444.82 kN/m @ 44.48 ton/m
Depth of embankment

d = H / ( Kp/Ka) 2/3 - 1
= 4.5 / (3.77/1.361) -1
= 2.54 m

Safe driving depth

Take F.O.S = 2.0

ds = 2.54 x 1.2
= 3.048 m

Point of Zero Shear

Zs = H / {(Ka/Kp) ½ - 1}
= 4.5 /{(3.77/1.361) ½}
= 6.77 m

Maximum Shear
Take F.O.S = 2.0

Qmax = Ap – ½ { Ka x  x (F.O.S)}
= 444.82 – ½ {0.361 x (19-9.81)} + {1 x (15-9.81)} x 22
= 27.468 kN

Moment Maximum
Take F.O.S = 1.5

M Max = Ap ( Zs - F.O.S) – { 1/6 ( Ka x  x Zs3)}


= 44.483 (6.77-1.5) – { 1/6 x 1(19-9.81) x (6.77)3}
= -240.833 kNm
Try S = 250 N/mm2

M design = 1.25
M max

M design = 1.25
240.833

M design = 301.04 kNm

Per meter of sheet pile = M design


Length of pile

= 301.04 kNm / 12m


= 25.087 kNm/m

Section Modulus required,

S req = M design
250
= (301.04 / 250 x 103)
= 0.001204 m3/m
= 1204.16 cm3/m

Use Larsen Section 16 W , m = 130.1 kg/m / meter run


Length of Anchor / Soil Nail,

From BS 8110, τ = 0.09 N/mm2

Force Resistance Anchor Pull = Area x τ


(444.827 x 1000) = (3.142 x100x L) x 0.09
444827 = 28.2787 x L
L = 15.73m

Total Length = 15.73m + 12m


= 27.73 m