Project no: 1725 Date: 7/12/2017 Sheet no.: 1 of 2 Computed by: Bashir Sherif
Subject: BELQASM VILLA Checked by:
Swimming Pool Approved by:

Pool Dimensions
2
Pool Area = 23 m
Pool Average Depth = 1.5 m
3
Pool Volume = 34.5 m

Recirculation System
Pumps Capacity Friction Loss
Turnover Rate = 6 hrs Filter Pressure Drop = 10 m
Recirculation Rate = 1.6 L/s Heater Pressure Drop = 5.3 m
Safety Factor = 20% Piping Network Loss = 3 m
Total Recirculation Rate = 2.0 L/s Static Pressure = 0 m
No. of Acting Pumps = 2 Safety Factor = 20%
Pump Flow Rate = 1.0 L/s Pump Head = 22.0 m

Surge Chamber (Balancing Tank) Fittings and accessories


No. of 1 m Diving Boards = 0 Minimum No. of Inlets = 1
No. of 3 m Diving Boards = 0 Recommended No. of Inlets = 2
Estimated No. of Bathers = 17 No. of Vacuum Fittings = 1
3
Balancing Tank Volume = 1.1 m No. of Skimmers = 1

Treatment Plant
Filtration System
Type of Filter : Pressure Sand (High Velocity)
2
Flow Rate = 13.6 L/s/m
Pressure Drop = 98.1 Kpa = 10 m
2
Backwash Rate = - L/s/m
Backwash Time = 2.5 min
2
Filtration Area = 0.2 m
No. of Filters = 1
Flow per filter = 2.0 L/s
2
Area per filter = 0.2 m
Backwash Pit = 300.0 L = 0.3 m3
Design calculation sheet
Project no: 1725 Date: 7/12/2017 Sheet no.: 2 of 2 Computed by: Bashir Sherif
Subject: Checked by:
Approved by:

Water Supply and Drainage


Water Supply Drainage
Pool Filling Time = 6 hrs Main Drain Flow = 1.3 L/s
Water Supply Flow = 1.6 L/s Pool Emptying Time = 7.2 hrs
Make-up Water = 575 L/day

Pool Chemistry
Disinfection and PH Control Systems
Chlorination Type : Calcium Hypochlorite
Hypochlorinator Capacity = 0.6 L/h
Effect on Pool PH = Increase Alkalinity (PH Increase)
PH Balancing Chemical = Sodium Bisulfate
Sodium Bisulfate Rate = 0.5 Kg/dose
Require Mixing Container Before Hypochlorinator

Pool Heater
Pool Heat-up Rate Heat Loss from Pool Surface
Water Density = 998 Kg/m
3
Surface H.T Coef. = 0.06 Kw/m2.°K
2
Specific Heat of Water = 4.18 KJ/Kg.K Pool surface area = 23 m
Desired Pool Temp. = 27 °C Pool Temperature = 27 °C
Initial Pool Temp. = 20 °C Ambient temperature = 24 °C
Pool Heat-up Time = 48 hrs
Pool Heat-up Rate = 5.9 Kw Pool Surface Loss = 4.2 Kw

Heater Capacity = 5.9 + 4.2 = 10.1 Kw

General Notes

1. Pool inlets should be spaced less than 6 m apart and within 1.5 m of a corner
2. Vacuum cleaning outlets should be located so that a hose of maximum 15 m can reach any point
3. Supply and return piping of the pumps should have a maximum velocity of 5 to 6 ft/s
4. Surge tanks are not required with vacuum diatomic filters, skimmers or continuous flow gutters
5. Chlorine gas usage is limited to large pools and some local codes don't permit its use