PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Precast, prestressed, insulated structural concrete panels.
B. Related Work Specified Elsewhere:
Section 03 3000 – Cast-in-Place Concrete.
Section 05 1200 – Structural Steel Framing.
Section 05 5000 – Metal Fabrications.
Section 07 6200 – Sheet Metal Flashing and Trim.
Section 07 9200 – Joint Sealants: Perimeter joints with sealant and backing.
Section 09 9000 – Painting and Coating: Preparation of concrete surfaces beyond specified level of concrete finish
required prior to painting.
1.2 REFERENCES
A. The publications listed below form a part of this specification to the extent referenced. Applicable sections of these
publications are referenced within the text.
1.3 SUBMITTALS
A. Submittal Procedures: Submit all submittals electronically in PDF format via email, unless otherwise specified.
B. Shop Drawings:
1|Pa ge
1. Plans, elevations, and details indicating panel locations, design loads, construction (including welding
requirements, finish, and openings etc.), identify product provided by the manufacturer.
2. Shop drawings shall be signed and sealed by a Professional Engineer licensed in the jurisdiction in which the
project is located.
C. Product Design Criteria: Design calculations shall be performed by an engineer experienced in precast, prestressed
concrete design. Design calculations, signed by a Professional Engineer licensed in the jurisdiction in which the
project is located, shall be submitted upon request. Information shall include:
1. Dead, live, wind, and seismic loads as identified in Contract Documents and as required by applicable codes.
2. Temporary bracing loads if required
D. Test Reports: Test reports on concrete and other materials used in fabrication. Submittal is not required unless
specifically requested, reports to be maintained reports on file with the manufacturer and available upon request.
A. Manufacturer’s Qualifications: The manufacturer’s precast concrete production facility shall be certified by PCI
Plant Certification Program. Manufacturer shall have produced product similar to what is specified for a minimum
of two years.
B. Erector’s Qualifications:
1. Regularly engaged for a minimum of five years in the erection of precast structural concrete similar to the
requirements of this project.
2. Erection crews shall be certified by PCI Field Certification Program prior to start of precast installation.
C. Welders’ Qualifications:
1. In accordance with AWS D1.1/1.1M and D1.4/1.4M.
A. Transport, handle, store, and protect products in compliance with manufacturer's recommendations.
C. Store units with adequate bracing and protect units to prevent contact with soil, to prevent staining, and to prevent
cracking, distortion, warping or other physical damage.
1. Store units with dunnage across full width of each bearing point unless otherwise indicated.
2. Place adequate dunnage of even thickness between each unit.
3. Place stored units so identification marks are clearly visible and units can be inspected.
D. Handle and transport units in a position consistent with their shape and design.
E. Lift and support units only at designated points shown on Shop Drawings and/or per manufacturer’s recommendations.
PART 2 - PRODUCTS
A. Fabcon, Savage, MN, Pleasanton, KS, Grove City, OH, or Mahanoy City, PA.
A. Precast, Prestressed Insulated Sandwich Wall Panels and/or VersaCore Plus Green by Fabcon, as indicated on
Drawings.
2|Pa ge
A. Comply with the design recommendations in PCI MNL 120. Comply with applicable building codes.
B. Calculated Fire-Test-Response Characteristics: Provide precast concrete units with fire-resistance rating indicated as
calculated according to PCI MNL 124 and acceptable to authorities having jurisdiction.
2.4 MATERIALS
B. Admixtures:
1. Air-entraining admixtures: ASTM C 260.
2. Water reducing, retarding, accelerating, high-range water reducing admixtures: ASTM C 494.
3. Fly ash as required by the manufacturer.
D. Water: Potable and free of foreign materials in amounts harmful to concrete, aggregate, or imbedded steel.
E. Steel Reinforcing:
1. Reinforcing Bars: Deformed Billet Steel: ASTM A 615, Deformed Rail Steel ASTM A616, Deformed Axle
Steel ASTM A617, Deformed Low alloy Steel ASTM A706.
2. Wire: Cold-Drawn Steel: ASTM A 82.
3. Wire Fabric:
a. Welded Steel: ASTM A 185.
b. Welded Deformed Steel: ASTM A 497.
F. Strand: Uncoated, 7-wire, stress relieved or low relaxation steel strand: ASTM A 416 (including supplement) Grade
250K or 270K.
G. Anchors and Inserts: Structural steel, ASTM A 36, manufacturer’s standard finish.
I. Rigid Insulation: Expanded polystyrene board insulation and expanded polystyrene billets.
J. Bearing Pads: High density plastic or hardboard shims or combination of both as recommended by precast
concrete fabricator.
K. Sand-Cement Grout:
1. Portland Cement: ASTM C 150, Type I.
2. Clean, natural sand: ASTM C 144 or ASTM C 404.
A. Mix design for the project, to provide concrete with the following properties:
1. Compressive Strength: 7000 psi min. at 28 days.
2. Release Strength: 3500 psi min.
3. Calcium chloride, chloride ions, and/or other salts are not permitted.
4. Entrained Air: 4 percent min. entrained air concrete at exposed surfaces. 9.5 percent +/- 1.5 percent on
structural portion of panels.
A. Portland Cement and sand with minimum water required for placement and hydration.
3|Pa ge
2.7 FABRICATION
C. Finishes: In general, finishes will comply with “Grade B’ per PCI MNL 116, 4th addition, Appendix C
1. Standard Underside: (Formed finish).
a. Provide finish produced by casting against approved forms using good industry practice in cleaning
forms, design of concrete mix, placing and curing.
b. Small surface holes caused by air bubbles, normal color variation, normal form joints, minor chips and
spalls shall be tolerated. No major or unsightly imperfections, honeycombs or other defects shall be
permitted unless they are nonstructural in nature and are patched per industry standards.
2. Standard Top: (Exposed unformed surface finish):
a. Extent of finishes as indicated on the Drawings.
b. Provide finish resulting from vibratory screed and additional hand finishing.
c. Normal color variation, minor indentations, minor chips and spalls shall be permitted. No major
imperfections, honeycombs or defects shall be permitted unless they are nonstructural in nature and
are patched per industry standards.
d. Colors: Per design requirements
D. Openings:
1. Openings may be plant cast or sawn (either in plant or field). Plant fabricate openings 12 inches round or
square and larger as indicated on the approved shop Drawings. Openings included at the time of manufacture
will have a minimum of 3” of solid concrete at the perimeter. In cases where the insulation extends to the
opening, window/door frames for insulated panels must be of sufficient width to cover insulation and allow
anchorage into the structural portion. Openings smaller than 12 inches are to be field cut by the trade requiring
the opening after the precast, prestressed products have been erected. All openings shall be approved by the
architect/engineer and the precast manufacturer before drilling or cutting.
2. For insulated panels, to minimize the risk of leaks, full depth head flashing is required at all openings.
Penetrating the head flashing or failure to follow this detail may result in leaks, which are not the
responsibility of the manufacturer.
E. Patching:
1. Maintain structural integrity.
2. Conform to panel fabricator’s recommendations and directions.
F. Fasteners: Cast in structural inserts, bolts, and plates as indicated on Shop Drawings.
G. Insulation: Place full length of panel and space across panel width between reinforcing strands.
H. Identify pickup points of precast structural concrete units and orientation in structure with permanent markings,
complying with markings indicated on Shop Drawings. Imprint or permanently mark casting date on each precast
structural concrete unit on a surface that will not show in finished structure.
I. Cure concrete according to requirements in PCI MNL 116 by moisture retention without heat or by accelerated heat
curing using low-pressure live steam or radiant heat and moisture. Cure units until compressive strength is high
enough to ensure that stripping does not have an effect on performance or appearance of final product.
A. Quality-Control Testing: In general compliance with testing provisions in PCI MNL 116, Manual for Quality Control
for Plants and Production of Precast, Prestressed Concrete Products. Testing will be performed by manufacturer’s
qualified personnel at the production facility.
PART 3 - EXECUTION
3.1 PREPARATION- Responsibilities of the General Contractor (GC) and/or Construction Manager (CM)
4|Pa ge
A. Provide suitable access to and around building with proper drainage and firm, level bearing for hauling and erection
equipment. Provide a stable, compacted, and drainable 40-foot wide all-weather aggregate surfacing, capable of
accommodating up to 90,000 pounds gross weight, to remain in place throughout panel erection. Coordinate with
precast manufacturer for location. All equipment, including but not limited to cranes, trucks, forklifts and manlifts,
must be capable of moving under their own power in an unobstructed manner so as not to cause erection delays for
the duration of the erector’s work on site.
B. Provide true, level bearing surfaces on field placed bearing walls and other field placed bearing structures. Ensure
that all foundations are completed, properly cured and ready to receive precast per the approved erections sequence
and durations. Maintain bearing surface in a “clean” condition until precast is installed.
C. Excavating is recognized as one of the most hazardous construction operations. GC shall meet all requirements set
forth by OSHA in Subpart P, Excavations, of 29 CFR 1926.650, 29 CFR 1926.651, and 29 CFR 1926.652. This
includes meeting the conditions prior to a panel being set as well as after the panel is set as this may cause hazards
due to a cave in against a set panel.
D. Place and align anchor bolts, plates or dowels in column footings, grade beams and other field placed bearing
structures.
E. Establish and maintain control points and benchmarks in an undisturbed condition for the use of the erector until
final completion and acceptance of the project. Control points shall consist of permanent pins inserted into the top
of the footing by the Surveyor of Record at all building corners at a maximum of 75’ intervals, along the footing
foundation and at the tops and bottoms of all steps in the foundation. Benchmark finished floor elevation markers
are required to be permanently established within the building pad.
F. Remove or de-energize all power lines per OSHA 1926.1410 guidelines, mark underground utilities, secure permits,
including those for airport access, e.g. FAA permit for crane clearance.
3.2 INSTALLATION
A. Installation of precast, prestressed concrete shall be performed by the manufacturer or manufacturer’s approved
erector under the PCI Certified Erector Program.
a. Members shall be lifted by means of suitable lifting devices at points provided by the manufacturer.
b. Temporary shoring and bracing, if necessary, as shown on the approved shop drawings, shall comply with
the manufacturer’s recommendations.
B. Seal joints between the precast panels and install fire stopping material as shown, if required, on the approved shop
drawings in joints. Install in compliance with manufacturer’s instructions and recommendations.
A. Field Welding: Perform field welding by qualified welders using equipment and materials in accordance with AWS
D1.1/1.1M and D1.4/1.4M.
B. Round or square openings less than 12 inches in size, round or square, shall be located and field drilled or cut by the
trade requiring the opening after the panels have been erected unless indicated otherwise on the approved shop
drawings. Coordinate with the precast concrete panel fabricator to locate field cut openings to avoid unnecessary
cutting of panel reinforcement. Field cut openings shall be verified by the manufacturer to maintain structural
integrity of the work.
3.3 ALIGNMENT
A. Erect precast structural concrete units level, plumb, square, true, and in alignment in general compliance with the
erection tolerances of PCI MNL 135. Members shall be properly aligned and leveled as required by the approved
shop drawings.
B. Variations between adjacent slab members shall be reasonably leveled out by jacking, loading, or other industry
standard method recommended by fabricator.
5|Pa ge
3.4 FIELD QUALITY CONTROL
A. Inspect all installed precast panels for conformance with approved shop drawings and industry standards. Field
quality control testing and inspection shall be at the discretion and expense of the GC or CM and/or Owner as
necessary to assure compliance with Contract requirements.
B. Manufacturer to cooperate with GC or CM and/or Owner in any discretionary testing and inspection.
A. Comply with manufacturer’s instructions and recommendations for cleaning precast concrete panels when panel
erection is complete.
B. Following installation, the GC and/or CM shall be responsible for protecting the product from the elements to
END OF SPECIFICATION