Schedule Narrative Report - Baseline

This schedule narrative report provides key project milestones and details for a baseline schedule, including contract letting and award dates, notification to proceed, field work beginning and completion dates, required permits, production rates for critical activities, coordination needs, and constraints. The report establishes the expected timeline and plan for the overall project according to the contractor's baseline schedule.

Uploaded by

mohammednatiq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
648 views1 page

Schedule Narrative Report - Baseline

This schedule narrative report provides key project milestones and details for a baseline schedule, including contract letting and award dates, notification to proceed, field work beginning and completion dates, required permits, production rates for critical activities, coordination needs, and constraints. The report establishes the expected timeline and plan for the overall project according to the contractor's baseline schedule.

Uploaded by

mohammednatiq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Schedule Narrative Report - Baseline

Project:
SP #:
Schedule:
Contractor:

Date: Subject:

To: From:
PROJECT MILESTONES
Activity ID Activity Name Date
M1000 Contract Letting Date
M1010 NTP 1
M1020 NTP 2
M1030 Contract Award
M1040 Contract Award Date
M1050 Notification to Proceed
M1060 Contractor Starts Contract Work
M1070 Contractor Submit Baseline Progress Schedule @ Award
M1080 MnDOT Accept Baseline Progress Schedule @ Award
M1090 Mobilization
M2000 Field Work Begins
M2010 Substantial Completion
M2020 Demobilization
M2030 Final Completion
M0999 Project Acceptance by MnDOT
EXPLNATION OF OVERALL PROJECT PLAN

PROJECT CALENDARS & HOLIDAYS

REQUIRED PERMITS

PRODUCTION RATES FOR CRITICAL ACTIVITIES

COORDINATION ACTIVITIES

CONSTRAINTS

LAG

NOTES/COMMENTS